Weil-McLain SGO Series Скачать руководство пользователя страница 4

4

Routine Maintenance Schedule

The schedule below is specifically designed for the homeowner. 

Please read pages 2 and 3 before proceeding.

Beginning each heating season:

Call a qualified service technician to perform  
annual service.

Daily during heating season:

Check that boiler area is free from combusti- 
ble materials, gasoline and other flammable  
vapors and liquids.

Weekly during heating season:

Check for and remove any obstructions to flow 
of combustion or ventilation air to boiler.

Check that breeching is attached between 
boiler and chimney. If  breeching is loose or 
damaged, immediately turn off switch on front 
of boiler and call qualified service technician 
to repair.

Check for oil leaks in oil piping and around 
burner. If found, immediately call qualified 
service technician to correct situation.

Check for water leaks in boiler and piping; 
also check for leaks around tankless heater 
plate. If found, immediately call qualified 
service technician to repair.

Float-type low water cutoff, when used:
Refer to control manufacturer's instructions.

Scald potential. Do not blow 

down low water cutoff unless blowdown 
piping has been installed according to Boiler 
Manual. If piping is not in place, call qualified 
service technician to install. 

L

L

L

Periodically during heating season:

 

Probe-type low water cutoff, when used:

 

Refer to control manufacturer's instructions  

 for 

testing.

End of heating season:

If tankless heater is installed, boiler will 
continue to operate. Check for the following:
-

All daily, weekly and monthly instructions 
listed on this page must be followed.

-

Burner motor may have to be oiled. Some 
motors are permanently lubricated and do 
not 

need additional oil. Check for oiling 

instructions on burner or motor. 

Boiler shutdown:

 

Do not drain boiler unless exposure to 

 

freezing temperatures will occur. 

 

Do not use antifreeze in steam systems.

 

Always keep manual fuel supply shut off if  

 

burner is shut down for an extended period of  

 time.

 

a.  Turn off switch at boiler and any external  

  switch 

to 

boiler.

 

b.  Close fuel valves. 

 

c.  Turn off water feed valve.

 

d.  Cover burner to protect from dust and 

  dampness.

Part No. 550-141-830/1202

Содержание SGO Series

Страница 1: ...or future reference leave this manual with other boiler instructions in the envelope provided with the boiler Maintenance and Service Guide Part No 550 141 830 1202 SGO Series 3 Oil Fired Steam Boiler...

Страница 2: ...ine maintenance of boiler and system Pages 2 through 6 must be followed to assure proper operation of your boiler Page 7 lists common problems and possible corrections In addition it is your responsib...

Страница 3: ...gasoline See burner manual for proper fuel oil Do not attempt to start burner when excess oil has accumulated in combustion chamber when unit is full of vapor or when combus tion chamber is very hot D...

Страница 4: ...t type low water cutoff when used Refer to control manufacturer s instructions Scald potential Do not blow down low water cutoff unless blowdown piping has been installed according to Boiler Manual If...

Страница 5: ...team ReliefValve on back of boiler SGO with oat type low water cutoff 1 If burner does not re check for Switch on boiler or additional shut off switches turned off Fuses or breaker switch tripped Ther...

Страница 6: ...turned off Fuses or breaker switch tripped Thermostat set below room temperature Fuel valves turned off Not enough oil in tank to supply burner No water in gauge glass Start up SGO Boiler with Probe T...

Страница 7: ...pair clean or replace air vents or traps Water disappearing from gauge glass and back into system through return piping Incorrect Hartford Loop piping Have qualified service technician pipe boiler exa...

Страница 8: ...ds 2 Check for and remove any obstruction to combustion and ventilation air flow to boiler 3 Check breeching and chimney or vent for obstructions damage etc Repair or replace as necessary 4 Clean boil...

Страница 9: ...Move to the bottom of the ueways and clean up between the sections to reach pins left uncleaned in step 5 Thoroughly clean ueways between all pins at all angles Start on top of boiler nish from the b...

Страница 10: ...aps and air vents for proper opera tion 7 Process may need to be repeated after several weeks of operation L L L L Detailed Service Procedures To place in operation Follow information below to prevent...

Страница 11: ...cock The water level should immediately rise to its proper level 4 If gauge glass breaks close off both gauge cocks and loosen glass retaining nuts to remove gauge glass Do not use thin glass tubing...

Страница 12: ...Part No 550 141 830 1202...

Отзывы: