Weil-McLain SGO Series Скачать руководство пользователя страница 3

3

For Your S afety

Tips  for  steam systems:

 

Check boiler and system piping for leaks. 

 

Continual makeup water will reduce boiler life.   

 

Minerals can build up in sections, reducing 

 

heat transfer and causing cast iron to overheat,  

 

resulting in section failure.

     

 

Failure 

to 

maintain 

recom-   

 

mended pH and to repair leaks can cause 

 

section iron corrosion, leading to section 

 

failure and leaks. Do not use petroleum- 

 

 

based sealing  or  stop-leak compounds in 

 

boiler systems. Damage to system components   

 can 

result.

 

Boiler water pH 7.0 to 8.5 is recommended. 

 

For pH conditions outside 7.0 to 8.5 range or 

 

unusually hard water areas (above 7 grains  

 

 

hardness), consult local water treatment 

 company.

 

Do not add cold water to hot boiler. Thermal  

 

 

shock can cause sections to crack.

 

Clean newly installed steam boiler to remove 

 

oil, grease, and other foreign material. Failure    

 

to properly clean can result in violent water 

 

level fluctuations, water passing into steam

 

mains, or high maintenance costs on strainers,

 

traps and and vents. A qualified service techni-  

 

cian should skim the boiler by following 

 

instructions on page 10 of this manual. 

 

    Follow 

instructions 

below 

to 

prevent severe personal injury, death or substan-
tial property damage:
 

Do not

 use crankcase drainings or any oil 

 

containing gasoline. See burner manual for  

 

proper fuel oil.

 

Do not

 attempt to start burner when excess  

 

oil has accumulated in combustion chamber,  

 

when unit is full of vapor, or when combus 

 

tion chamber is very hot.

 

Do not

 start burner unless collector hood, flue  

 

cap, jacket cap, breeching and burner mount- 

 

ing door are secured in place.

 

Never

 burn garbage or paper in the boiler.  

 

Never

 leave combustible material around 

 boiler.
 

DO NOT

 TAMPER WITH UNIT OR CONTROLS.  

 

Always follow specific instructions when 

 

starting up boiler or performing routine   

 

maintenance or service.

L

L

L

L

    Follow 

instructions 

below 

to 

prevent severe personal injury, death or substan-
tial property damage:

To avoid electric shock, turn off electrical  
supply at switch on boiler and additional  
external switches before performing service.
To avoid severe burns, allow boiler to cool 
before performing service.
Do not block flow of combustion or ventilation  
air to boiler.
Boiler must be connected to a flue with 
sufficient draft at all times to assure proper 
operation. 
Do not use this boiler if any part has been 
under water. Electrical and mechanical 
failures may cause electric shock and fire  
risks. Immediately call a qualified service 
technician to inspect chimney or vent,     
boiler and burner. Have the boiler flueways  
cleaned and have the following replaced:
—   all electrical and mechanical controls
—   electrical wiring
— oil burner and controls
— insulation and chamber lining

L

L

L

L

L

L

L

L

L

L

L

Part No. 550-141-830/1202

Содержание SGO Series

Страница 1: ...or future reference leave this manual with other boiler instructions in the envelope provided with the boiler Maintenance and Service Guide Part No 550 141 830 1202 SGO Series 3 Oil Fired Steam Boiler...

Страница 2: ...ine maintenance of boiler and system Pages 2 through 6 must be followed to assure proper operation of your boiler Page 7 lists common problems and possible corrections In addition it is your responsib...

Страница 3: ...gasoline See burner manual for proper fuel oil Do not attempt to start burner when excess oil has accumulated in combustion chamber when unit is full of vapor or when combus tion chamber is very hot D...

Страница 4: ...t type low water cutoff when used Refer to control manufacturer s instructions Scald potential Do not blow down low water cutoff unless blowdown piping has been installed according to Boiler Manual If...

Страница 5: ...team ReliefValve on back of boiler SGO with oat type low water cutoff 1 If burner does not re check for Switch on boiler or additional shut off switches turned off Fuses or breaker switch tripped Ther...

Страница 6: ...turned off Fuses or breaker switch tripped Thermostat set below room temperature Fuel valves turned off Not enough oil in tank to supply burner No water in gauge glass Start up SGO Boiler with Probe T...

Страница 7: ...pair clean or replace air vents or traps Water disappearing from gauge glass and back into system through return piping Incorrect Hartford Loop piping Have qualified service technician pipe boiler exa...

Страница 8: ...ds 2 Check for and remove any obstruction to combustion and ventilation air flow to boiler 3 Check breeching and chimney or vent for obstructions damage etc Repair or replace as necessary 4 Clean boil...

Страница 9: ...Move to the bottom of the ueways and clean up between the sections to reach pins left uncleaned in step 5 Thoroughly clean ueways between all pins at all angles Start on top of boiler nish from the b...

Страница 10: ...aps and air vents for proper opera tion 7 Process may need to be repeated after several weeks of operation L L L L Detailed Service Procedures To place in operation Follow information below to prevent...

Страница 11: ...cock The water level should immediately rise to its proper level 4 If gauge glass breaks close off both gauge cocks and loosen glass retaining nuts to remove gauge glass Do not use thin glass tubing...

Страница 12: ...Part No 550 141 830 1202...

Отзывы: