Part number 550-143-010/1021
68
GV90+
series
2
gas-fired water boiler – boiler manual
Figure 77
Service and maintenance schedules
Follow the Service and maintenance procedures given throughout
this manual and in component literature shipped with the boiler.
Failure to perform the service and maintenance could result in
damage to the boiler or system. Failure to follow the directions
in this manual and component literature could result in severe
personal injury, death or substantial property damage.
The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
instructions on
of this
manual. Failure to comply could
result in severe personal injury.
Service technician
(see following pages for instructions)
Owner maintenance
(see following pages for instructions)
Annual start-up
General:
•
Address reported problems, page 69.
•
•
Inspect boiler interior, page 69.
•
Inspect condensate drain system, page 69.
•
Inspect all piping for leaks, page 69.
•
•
Inspect the water system, page 69.
•
Check water system chemistry, page 69.
•
Clean and refill condensate trap, page 69.
•
Inspect expansion tank, page 70.
•
Inspect air openings, page 70.
•
Inspect vent system and air piping, page 70.
•
Inspect boiler heating surfaces, page 70.
•
•
Inspect temperature mixing system, page 71.
•
Inspect additional controls and cutoffs,
•
•
Inspect blower motor, page 71.
•
Inspect oiled-bearing circulators, page 71.
•
Inspect Temperature/LWCO sensor, page 71
.
•
Inspect boiler relief valve, page 72.
Additional if combustion or
performance indicates the need:
•
Follow procedures under Cleaning boiler
heating surfaces, page 73 to access boiler
components listed below.
•
Clean heat exchanger.
•
Remove and clean burner using compressed
air only.
•
Vacuum the blower.
Review:
•
Review with owner.
Daily
•
Check boiler area
•
Check air openings
•
Check pressure gauge
Monthly
•
Check boiler interior piping
•
Check venting system
•
Check air vents
•
Check condensate drain system
•
Check relief valve
Periodically
•
Test low water cutoff
•
Clean vent termination/air intake
screens
Every 6
months
•
Oil blower motor (if required)
•
Operate relief valve
End of
season
•
Shut down procedure
Annual start-up and general maintenance schedule