Weil-McLain EG-30 THRU -75 Скачать руководство пользователя страница 13

1

Part Number 550-110-032/0607

Standing Pilot Boilers — Control Supplement

Damper installation 

continued

.  Read  and  apply  the  harness  plug  warning  label 

(shown  above)  so  that  it  is  visible  after  installa-

tion.

.  Plug damper harness receptacle into damper harness 

plug.

  Bypassing (jumpering) vent damper will 

cause flue products such as carbon mon-

oxide to escape into the house. This will 

cause severe personal injury or death.

  After boiler has operated once, if either 

end  of  the  harness  is  disconnected,  the 

system  safety  shutdown  will  occur.  The 

boiler  will  not  operate  until  harness  is 

reconnected.

 

Effikal  damper

  —  Damper  hold  open 

switch must be in “Automatic Operation” 

position for system to operate properly.

Minimum clearances to 

combustibles

Provide  a  minimum  of  ”  between  the  vent  damper 

and any combustible material. (Provide a minimum of 

” between jacket top and combustible ceiling.) See 

EG • PEG • EGH Boiler manual for complete clearance 

requirements.

Installation

  Do not modify draft hood or damper, or 

make another connection between draft 

hood and damper or boiler except as not-

ed below. This will void CSA certification 

and will not be covered by Weil-McLain 

warranty. Any changes will cause severe 

personal  injury,  death,  or  substantial 

property damage.

1.  Install  vent  damper  horizontally  or  vertically  as 

shown in vent damper manufacturer’s instructions. 

Vent damper must be installed so that it serves only 

one boiler and so damper blade indicator is visible 

to the user. See Figure 8.

.  Screws or rivets used to secure the vent damper to 

the draft hood must not interfere with rotation of 

the damper blade.

.  Install  damper  harness  between  damper  actuator 

and knockout in jacket top panel. Use strain relief 

connectors and locknuts to secure both ends of the 

damper harness.

  Keep wiring harness clear of all hot sur-

faces.

Содержание EG-30 THRU -75

Страница 1: ...ntrol supplement Standing pilot This supplement must only be used by a qualified heating installer service technician Before installing read all instructions including this supplement the boiler manua...

Страница 2: ...Note to the installer Controls must only be installed by a Weil McLain distributor or other qualified installer service technician in accordance with this Supplement and all applicable codes and requ...

Страница 3: ...out tankless heaters 4 5 Control installation EG 30 thru 65 water boilers with tankless heaters 6 7 Control installation EG 30 thru 75 and PEG 30 thru 65 steam boilers with probe 8 9 Control installat...

Страница 4: ...Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4...

Страница 5: ...d wire controls per wiring diagram page 4 and Figure 2 a Attach junction box inside left jacket panel with 8 32 x machine screws and green ground nuts provided b Install transformer with plug in relay...

Страница 6: ...Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4...

Страница 7: ...Figure 3 a Install combination limit control and relay in tap ping See Boiler Manual control tapping table Op erating and limit circuit wiring must be 14 gauge or heavier 2 Bring supply wiring to boil...

Страница 8: ...Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4...

Страница 9: ...ith probe type low water cutoff EG 30 thru 65 and PEG 30 thru 65 steam boilers with probe type low water cutoff Control installation continued 1 Mount and wire controls per wiring diagram page 8 and F...

Страница 10: ...10 Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4...

Страница 11: ...boilers with float type low water cutoff EG 30 thru 65 steam boilers with float type low water cutoff Control installation continued 1 Mount and wire controls per wiring diagram page 10 and Figure 6...

Страница 12: ...0 thru PEG 65 steam natural gas The following boiler models may have damper installed EG 75 natural or propane gas Once damper is installed boiler will not operate without a damper installed Only damp...

Страница 13: ...rial Provide a minimum of 46 between jacket top and combustible ceiling See EG PEG EGH Boiler manual for complete clearance requirements Installation Do not modify draft hood or damper or make another...

Страница 14: ...ructions 2 Raise room thermostat to call for heat Damper actuator will slowly open damper 3 When damper is fully open main gas valve will open and main burners will ignite Damper must be fully open be...

Страница 15: ...15 Part Number 550 110 032 0607 Standing Pilot Boilers Control Supplement Lighting instructions Robertshaw 7200...

Страница 16: ...16 Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4 Lighting instructions Honeywell VR8200 VR8300 Natural gas boilers only...

Страница 17: ...17 Part Number 550 110 032 0607 Standing Pilot Boilers Control Supplement Lighting instructions Honeywell VR8200 VR8300 Propane boilers only...

Страница 18: ...18 Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4 Lighting instructions Robertshaw 7000ERHC...

Страница 19: ...severe personal injury death or substantial property damage 2 Refer to vent damper manufacturer s instructions for procedure to fix vent damper in open position 3 Turn on power to boiler 4 Using wrenc...

Страница 20: ...timeter with leads fitted with alligator clips Set meter scale to DC Millivolts b Loosen the insulated terminal on the TOP thermopile lead wire enough to allow clipping a multimeter alligator clip to...

Страница 21: ...21 Part Number 550 110 032 0607 Standing Pilot Boilers Control Supplement Troubleshooting continued...

Страница 22: ...22 Part Number 550 110 032 0607 EG 30 thru 75 Series 4 and PEG 30 thru 65 Series 4 Troubleshooting continued...

Страница 23: ...23 Part Number 550 110 032 0607 Standing Pilot Boilers Control Supplement Troubleshooting continued...

Страница 24: ...BE 1C 510 512 337 510 312 255 Damper harness Weil McLain 591 391 795 Boiler wiring harness EG 30 thru 75 water EG 35 thru 65 water with tankless EG 30 thru 75 steam float LWCO EG 30 thru 75 PEG 30 thr...

Отзывы: