Weco HeSU UNIVERSAL 5K3 Скачать руководство пользователя страница 25

WeCo - HeSU UNIVERSAL MODEL 5K3 UNIVERSAL STACKABLE 

 

 

 

HeSU 5K3-R20 STACKABLE * HIGH CURRENT                                                    V_2.00_2019       

Pag.  25

 

6

 

Relay damage

 

No  alarm  when  power-on,  no  voltage 

output  in  the  battery  box.  Monitoring 

software without any alarm and display 

relay in “on” state.

 

Please  contact  the  after-sales  service, 

replace relay

 

When this sign is disconnected and green, the 

relay is disconnected;

 

When this sign is connected and red, the relay 

is connected;

 

 

 

7

 

Protection 

board 

damage

 

The  PC  and  the  battery  box’s  RS232 

connection  is  reliable,  but  the 

monitoring  software  cannot  read  the 

battery information and status.

 

Please  contact  the  after-sales  service, 

replace protection board.

 

 

8

 

Cell damage

 

Battery  box  in  the  state  of  no  charge 

and  no  discharge,  a  cell  voltage  and 

most  of  the  other  cells  voltage 

difference greater than 200mV.

 

Please contact the after-sales service.

 

The real-time display of the cell voltage on the 

monitoring software is as follows:

 

 

9

 

First  parallel  connection 

failure of battery boxes

 

When  the  battery  boxes  are  first 

paralleled,  start  the  system,  slave 

battery  box  fault  light  flashing.  No 

sound from the slave battery box relay 

action, no voltage output.

 

Measure  the  positive  and  negative 

voltage of each battery box, if the voltage 

difference  between  the  battery  boxes  is 

greater  than  2V,  please  reduce  the 

voltage  difference  to  less  than 2V  to  try 

parallel connection

 

 

 

10

 

Master-slave 

machine 

communication 

exceptions

 

Slave  battery  box’s  fault  light  flashes, 

the  master  machine  cannot  control 

slave machine

 

Check  that  the  communication  cable 

between  the  master  machine  and  the 

slave machine is securely connected

 

 

11

 

Battery  box  or  parallel 

battery 

box 

system 

shutdown cannot start

 

There  is  no  alarm  information  in  the 

battery  box,  but  the  batteries  are  not 

working properly

 

Please contact the after-sales service

 

 

12

 

Other exceptions

 

Humidity, cell expansion, frost-Defrost, 

unbalances etc..

 

Please contact the after-sales service

 

FAULT RED

 

 
 
 
 
 
 
 
 
 
 

Содержание HeSU UNIVERSAL 5K3

Страница 1: ...HeSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 1 48V Household Energy Storage System UNIVERSAL 5K3 Product manual HESU Max 5 units in Parallel Max 5 Clusters Model type HeSU UNIVERSAL STACKABLE U...

Страница 2: ...ttery can explode keep away from free flames or sparks disconnect any terminal before operating the battery This battery can accumulate parasite current disconnect the main breaker and wait 5 minutes...

Страница 3: ...ety Guidelines 7 4 Product Overviews 7 4 1 Produce Introduction 7 4 2 Identifying the Product 8 4 3 Product identification 8 5 System Installation 9 5 1 Installation notice 9 5 2 Package information a...

Страница 4: ...18 5 6 2 Power cable connection 19 6 Battery box activate and shutdown 22 6 1 Panel buttons and LEDs meaning 22 6 2 The operation steps of the battery box works alone 23 6 2 1 Start battery box 23 6 2...

Страница 5: ...atest datasheet are available on www weco uk com This battery unit is equipped with the latest firmware version available WeCo will release new firmware to improve the functionalities and battery capa...

Страница 6: ...nual 2 Information in this Manual 2 1 About this Manual This is the Manual for the HeSU is an Installer User manual the installer and the user must refer to the manual guidance to operate and maintain...

Страница 7: ...st comply with the safety precautions and warnings If any of the following precautions is not fully understood or has any problems please contact the customer service officer for assistance The safety...

Страница 8: ...labels The nameplate label describes the product parameters and is attached to the product For details please refer to the nameplate label of the product For safety reasons the user must have a good u...

Страница 9: ...d be as short as possible to prevent excessive line pressure drop d Batteries with different capacity different P N or different manufactures are not allowed for connection e Before conducting the bat...

Страница 10: ...le 2 5 m each Red Black 2 CAN cable RJ45 Parallel Connection 1 100cm 3 Flat Cover 1 Flat Cover for Bus bar protection in Stackable configuration 4 Back Side feet Support 2 Steel Rubber stackable feet...

Страница 11: ...HIGH CURRENT V_2 00_2019 Pag 11 5 2 3 Necessary Installation Tools Multimeter Current clamp Screw Driver Set Allen Key Set Drill Hammer Electrician Scissors Wrench set Lifting strap mechanical lifter...

Страница 12: ...KABLE HIGH CURRENT V_2 00_2019 Pag 12 5 3 Installation 5 3 1 Product View RACK MOUNTED CONNECTION VIEW RS 232 Wi Fi HUB connection RUN STOP Button DIP SWITCH ADDRESS BMS CAN Digital I O NEGATIVE TERMI...

Страница 13: ...al ground mounted the support surface of the battery is distributed on 4 feet 10x4 cm make sure to install a distribution plate or make a proper foundation to support the weight In case of horizontal...

Страница 14: ...mode and it is therefore necessary for the installer to make simple changes to install the STACK kit Below are the installation phases 1 Install the feet on the bottom of the battery each foot has 2 m...

Страница 15: ...he help of a mechanical lift and or with at least two people equipped with suitable suction cups for mechanical lifting or lifting straps 4 Continue the installation with the desired modules following...

Страница 16: ...o reducing the length of the cables to avoid voltage drops OUTPUT Positive from the Lower module OUTPUT positive from the Lower module OUTPUT Negative from the upper module RS 485 Series start from po...

Страница 17: ...witch set the RS485 address and terminal resistance B RS485 A RS485 B When the battery box is used independently it can communicate with the inverter via RS485 interface When the battery box is used i...

Страница 18: ...A single battery box through the CAN communication connection inverter when the DIP switch is defined as follows MASTER INDIVIDUAL ATTENTION THE POWER PARALLEL MUST FOLLOW THE WIRING CONNECTION A WRON...

Страница 19: ...take effect 5 6 3 PARALLEL POWER CONNECTION FOR 3 BATTERIES 1 MASTER SLAVE 1 SLAVE 2 MASTER SLAVE01 SLAVE02 CAUTION Set the DIP switch after the need to restart the battery box restart the settings w...

Страница 20: ...ws cables and Bus Bar must be installed with diligence and the tighten of the connection terminal must respect the torque mentioned in the manual which is 40Nm and the inspection must be performed eve...

Страница 21: ...WeCo HeSU UNIVERSAL MODEL 5K3 UNIVERSAL STACKABLE HeSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 21 MASTER SL1 SL2 MASTER SL1 SL2 SL3 CAN BMS PORT CAN BMS PORT...

Страница 22: ...ate and shutdown 6 1 Panel buttons and LEDs meaning Attention the drawing is for reference only please take the material as the standard Name Meaning Function or indication status POWER Turn on or off...

Страница 23: ...han 2V Otherwise the BMS will not allow the batteries to be activated in a parallel connection 2 SOC of each battery in the stack must be the same check SOC as individual battery before parallel conne...

Страница 24: ...anual is followed Switching off an individual slave battery in a parallel system is possible in an adverse situation but only as a last resort 7 Troubleshooting via WeCo monitor PC software No Abnorma...

Страница 25: ...y of the cell voltage on the monitoring software is as follows 9 First parallel connection failure of battery boxes When the battery boxes are first paralleled start the system slave battery box fault...

Страница 26: ...mmunicate with the battery _PC Battery communication and set up for 232 USB device is available for auth Installers 1 Launch the exe file WeCo_Monitor and wait for self installation 2 From the main pa...

Страница 27: ...HIGH CURRENT V_2 00_2019 Pag 27 3 Connect the RS232 converter and search the relative com on the PC settings device manager of Windows_ Select the COM port from the Main page of the WeCo Monitor then...

Страница 28: ...URRENT V_2 00_2019 Pag 28 4 If more than one module is connected select Parallel Overview and check the single unit data 5 CAN protocol Setting to match the inverter communication select and press SET...

Страница 29: ...ing in the permitted values This operation is possibile only with batteries connected to the WeCo Server Wifi or LAN 7 Equalization ACTIVE PASSIVE and MANUAL if a manual equalization is necessary afte...

Страница 30: ...ERSAL MODEL 5K3 UNIVERSAL STACKABLE HeSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 30 8 Factory reset this must be authorized from the WECO Tech Department follow the instruction of the FACTORY R...

Страница 31: ...5x5 3 26 5kWh x5 132 5kWh 04 GOODWE S ALL LV Hybrid 5 5x5 3 26 5kWh x5 132 5kWh 05 STUDER INNOTEC Extender 5 5x5 3 26 5kWh x5 132 5kWh 06 OUTBACK no BMS Aplha CAN ALL 5 5x5 3 26 5kWh x5 132 5kWh 07 V...

Страница 32: ...ent Value as per Battery datasheet Description Inverter Low Voltage CUT OFF Inverter High Voltage CUT OFF STD Charging Current max 130A STD Discharging current Max 200A Single Battery 47 5 SOC 0 Sugge...

Страница 33: ...TION Connect two 25 mm AWG Wire of the same length on each terminal as shown above Strictly respect the below chart for the cluster configuration with standard kit 25 mm cables If more power current i...

Страница 34: ...OWANCE Standard CABLES kit connection 120A SINGLE CLUSTER Charge Discharge Batteries in parallel with 25mm2 parallel connection cable Amp 2 120 3 4 5 40 Nm Parallel Screw Terminal must be checked ever...

Страница 35: ...eSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 35 OVERVIEW MULTI CLUSTER SYSTEM Double BUS BAR 40 Nm Parallel Screw Terminal must be checked every 3 months 2 x 50mm NEGATIVE 2 x 50mm POSITIVE COPP...

Страница 36: ...QUIRED IF MORE THAN 1 CLUSTER BMU BMS COMBINER We HUB SEE THE POWER CURRENT CONFIGURATION BELOW EACH BATTERY PACK AND EACH CLUSTER MUST HAVE THE SAME SOC ABOVE 120A MUST USE THE BUS BAR PROVIDED BY WE...

Страница 37: ...closure contact B DIP SWITCH Baud Rate Selection C CAN BUS PORTS 2X CAN Bus port for external solar grid charger D RS 485 port RS 485 communication port MODBUS E CLUSTER CAN PORTS 5X Master Cluster C...

Страница 38: ...eCo HeSU UNIVERSAL MODEL 5K3 UNIVERSAL STACKABLE HeSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 38 HUB CAN Dimensions Fix on the wall with 4 x 6mm screw washer Weight 8kg 45 485 80 463 445 400 20...

Страница 39: ...ystem in less than 3 seconds 6 The current limit must be adjusted according to the real active batteries in system in order to restore the normal function 7 If the cluster is not balanced the current...

Страница 40: ...TACKABLE HIGH CURRENT V_2 00_2019 Pag 40 GENERAL SYSTEM DESCRIPTION WE HUB IS MANDATORY WHEN MORE CLUSTER ARE CONNECTED IN PARALLE NEGATIVE BUS BAR POSITIVE BUS BAR 2 x 50mm NEGATIVE 2 x 50mm POSITIVE...

Страница 41: ...ECIAL BUS BAR FOR PARALLEL CONNECTION ABOVE 120A UP TO MAX 360A BUS BAR MODEL STK 5K3 360 ATTENTION BUS BAR ARE MANDATORY FOR SYSTEMS ABOVE 120A DO NOT USE DIFFERENT BUS BAR TYPES OR CABLES EACH BATTE...

Страница 42: ...STACKABLE HIGH CURRENT V_2 00_2019 Pag 42 Cluster 1 of 5 Cluster 2 of 5 Cluster 3 of 5 Cluster 4 of 5 Cluster 5 of 5 More inverter Max 360A SLAVE SLAVE SLAVE MASTER 2 x 50mm NEGATIVE 2 x 50mm POSITIV...

Страница 43: ...WeCo HeSU UNIVERSAL MODEL 5K3 UNIVERSAL STACKABLE HeSU 5K3 R20 STACKABLE HIGH CURRENT V_2 00_2019 Pag 43 HUB power supply...

Страница 44: ...RED module connection 1 x Custom BUS BAR Insulated BLACK module connection Packed in single box 2 x cable 50 mm ring terminal 2 mt RED 2 x cable 50 mm ring terminal 2 mt RED Note MAIN PARALLEL BUS BAR...

Страница 45: ...R20 Nominal DC Voltages 51 2 Amp Hours 105 Rated kWh Capacity 5 3 kWh Max Output Capacity 105 Ah Standard Charge Current 100 Adc Max Charge Current 150 Adc Standard discharging Current 100 Adc Max di...

Страница 46: ...e of single cell overvoltage the relay will open the circuit and the OUTBACK inverter will shut down In this case press the RUN button and shut down the battery wait 30 minutes press run once again an...

Страница 47: ...harge and discharge Voltage range of the inverter MUST be limited as per the module maximum value NOTE This manual is subjected to continuous implementation Before install your WeCo batteries please c...

Отзывы: