Lifecycle
SONIC DIGITAL HS MD/MFD
44
12.3
Supply and installation
The following must be observed for installation:
only suitable, instructed and expressly authorised persons may carry out
the work,
secure all potential hazard areas, even if they only represent a hazard
for a short time,
for installation or integration of the ultrasonic generator into a total system,
the data in the installation drawing must be observed.
12.3.1
Mains connections
All mains connections at the place of installation must comply with the applicable
standards, directives and guidelines.
12.3.2
Ultrasound supply
All ultrasound connections at the place of installation must comply with the applica-
ble standards, directives and guidelines. Please comply with an ultrasound connec-
tion plan if it represents an agreed part of the shipment.
12.3.3
Control cables
All control cables at the place of installion must comply with the applicable stand-
ards, directives and guidelines. If a wiring diagram for the control system is included
in the scope of delivery, observe it.
12.4
Commissioning
The following must be carried out for commissioning:
check installation,
check all ultrasonic units/components,
check the energy supply,
switch on the complete system/ultrasonic welding units.