background image

PG55_110 15

1

2

1

Possible applications

The trowel machine can be used for the machine-assisted troweling of concrete surfaces, 

e.g. industrial floors, roller skate rinks, parking decks, sewage plants, basement and garage floors, 

screed surfaces, etc.

Pre-troweling

The surface to be smoothed is pre-troweled with 

the troweling pan (1).

The right time for pre-troweling has come when a person 

walking on the cured concrete surface no longer leaves 

footprints behind. 

Pre-troweling involves the process of grinding off any 

unevenness caused by pouring the concrete and rubbing 

the ground-off material into any cavities and recesses that 

may exist in the floor.

The concrete surface is leveled. During this process, the concrete surface is compacted 

due to a thorough rearrangement of the aggregate particles. Any shrinkage cracks 

and pores that may have been brought about by escaping air are sealed. Minimum 

size particles shift and settle in the cavities between the larger aggregates. The shifted 

particles push any retained water to the surface, where it evaporates. 

The number of passes required for pre-troweling cannot be specified exactly as this number 

is influenced by various factors (e.g. concrete consistency, ambient temperature, humidity, 

etc.). Under normal conditions, however, one to two passes will suffice.

Fine troweling is applied when no more moisture can be 

detected on the surface. For fine troweling the troweling pan 

is substituted for the troweling blades.

The troweling blades (1) rotate across the concrete surface (2) 

at relatively high pressure and at a certain blade angle (

a

).

Fine troweling requires that the surfaces have been pre-

treated with the troweling pan.

Fine troweling

It is recommended to use a second trowel machine for surfaces with an area 

exceeding 200 sqm.

The first machine is then used for pre-troweling with a troweling pan. 

The second machine is fitted with troweling blades and used for fine troweling.

For the first few passes, the blade angle (a) is usually kept small. The blade angle 

increases with the number of passes. A key factor during this process is the weight of the 

machine. The wider the angle of the troweling blades and the higher the weight of the 

machine acting on the troweling blades are, the harder and, thus, more resistant to wear 

the surface is.

Содержание PG 110

Страница 1: ...ch bersetzung der Original Betriebsanleitung Operating and Maintenance Manual Weber Maschinentechnik GmbH Im Boden 5 8 10 57334 Bad Laasphe R ckershausen Germany Telephone 49 0 27 54 398 0 Fax 49 0 27...

Страница 2: ...2 PG55_110...

Страница 3: ...hic presentation 8 Device description 9 Technical data 10 Activities prior to starting work 12 Starting 13 Troweling 14 Shutting down 16 Maintenance overview 17 Maintenance work 18 Operating fluids an...

Страница 4: ...ncrease the reliability and service life of your concrete trowel machine This operating and maintenance manual must always be available at the implementation site of the concrete trowel machine If nec...

Страница 5: ...esponsible All liability is rejected if damage occurs due to non compliance with this provision This risk is borne solely by the user Easily foreseeable misuse Any use for which the machine is not int...

Страница 6: ...semblies must be secured to and lifted by hoisting machines that can bear their weight when they are replaced Ensure that no hazard is caused by raising components or assemblies Do not position yourse...

Страница 7: ...iate implementation conditions and operating conditions as needed however an inspection to ensure operationally safe status must be performed by an expert at least once a year The results of the inspe...

Страница 8: ...raphic presentation Overall view PG 1 Engine 2 Protective frame 3 Gas lever 4 Handle 5 V belt guard 6 Protective cage 7 Troweling blades 8 Adjusting lever troweling blade adjuster 9 Short circuit butt...

Страница 9: ...the gearbox of the trowel machine by the centrifugal clutch and a V belt The troweling blades and the troweling pan attached to the gearbox smooth the concrete or screed Operation Start the Robin Suba...

Страница 10: ...in kg 53 74 78 95 Dimensions Overall length in mm 1575 2166 2241 2366 Protective ring diameter in mm 595 786 936 1186 Height with folded manual guidance rod in mm 900 900 900 900 Operating diameter in...

Страница 11: ...PG55_110 11 2 1 3 4 5 6 1 Description 2 TYPE 3 Serial number 4 Year of construction 5 Mass 6 Rated power kW...

Страница 12: ...g capacity of 150 kg Do not step under suspended loads Checking the engine oil level Pull the oil dipstick 1 out of the crankcase Insert the oil dip stick in the oil filler neck but do not screw it in...

Страница 13: ...eft close Open the fuel cock 2 After the engine has warmed up slide the choke lever to the right open Slowly tighten the handle 1 of the reversing starter 2 until resistance is noticeable Allow the ha...

Страница 14: ...hind the drive shaft are increased and decreased respectively A clockwise rotational movement will cause the machine to move to the left Move to the right Push the machine down slightly using the manu...

Страница 15: ...it evaporates The number of passes required for pre troweling cannot be specified exactly as this number is influenced by various factors e g concrete consistency ambient temperature humidity etc Unde...

Страница 16: ...Turn the short circuit button 1 to the 0 OFF position During breaks even if they are short the machine must be shut down Parked devices that represent an obstacle must be safeguarded against through...

Страница 17: ...dly manner If lubricating oils and fuel come into contact with skin they can cause skin cancer Upon contact with the skin clean affected skin with suitable cleaning agent without delay If accessible d...

Страница 18: ...Danger of scalding due to hot oil If lubricating oils and fuel come into contact with skin they can cause skin cancer Upon contact with the skin clean affected skin with suitable cleaning agent witho...

Страница 19: ...PG55_110 19 1 1 Checking the V belt Remove the V belt guard 1 Check the V belt 1 for cracks damaged flanks and wear If there is excessive wear replace the V belt as specified in the repair manual...

Страница 20: ...ular unleaded gasoline 3 6 6 0 Worm gear Semi fluid grease Grease 00 Mobil Glygoyle 0 9 0 9 Troubleshooting Fault Possible cause Remedy Machine does not start Operating error Execute start process as...

Страница 21: ...fuel up to the lower edge of filler neck Engine Check oil level if necessary fill to upper oil level mark Check air filter clean replace if necessary Check fuel filter change if necessary All bare pa...

Страница 22: ...22 PG55_110...

Страница 23: ...ARL 14 rue d Arsonval 69680 Chassieu Telephone Fax E mail 33 0 472 791020 33 0 472 791021 france webermt com in Poland WEBER Maschinentechnik Sp zo o Ul Jeziorki 86 02 863 Warszawa Telephone Fax E mai...

Страница 24: ...n plates Vibrating tampers Vibration rollers Joint cutters Internal vibrators and converters Rollers Weber MASCHINENTECHNIK GmbH Im Boden 57334 Bad Laasphe R ckershausen Telephone 49 0 27 54 398 0 Fax...

Отзывы:

Похожие инструкции для PG 110