background image

12 PG55_110

1

2

1

1

Transport 

Activities prior to starting work

Arrest the manual guidance rod (1) with the tommy screw (2).

When transporting the trowel machine on a vehicle, 

secure it with suitable restraints.

Attach the crane hook (1) to the protective frame and lift 

the machine onto the means of transport selected.

Only use lifting machines with a minimum bearing 

capacity of 150 kg.

Do not step under suspended loads.

Checking the engine oil level

Pull the oil dipstick (1) out of the crankcase.

Insert the oil dip stick in the oil filler neck, but do not 

screw it in.

Open and remove the gas cap (1), check the level, if 

necessary top off to the lower edge of the filler neck 

with clean fuel in accordance with the specification.

The correct oil level is between the min. and max. marks.

Check the fuel level

For work at the fuel system, have a suitable fire-

extinguishing agent at the ready.

Fire, naked light, and smoking is forbidden!

Содержание PG 110

Страница 1: ...ch bersetzung der Original Betriebsanleitung Operating and Maintenance Manual Weber Maschinentechnik GmbH Im Boden 5 8 10 57334 Bad Laasphe R ckershausen Germany Telephone 49 0 27 54 398 0 Fax 49 0 27...

Страница 2: ...2 PG55_110...

Страница 3: ...hic presentation 8 Device description 9 Technical data 10 Activities prior to starting work 12 Starting 13 Troweling 14 Shutting down 16 Maintenance overview 17 Maintenance work 18 Operating fluids an...

Страница 4: ...ncrease the reliability and service life of your concrete trowel machine This operating and maintenance manual must always be available at the implementation site of the concrete trowel machine If nec...

Страница 5: ...esponsible All liability is rejected if damage occurs due to non compliance with this provision This risk is borne solely by the user Easily foreseeable misuse Any use for which the machine is not int...

Страница 6: ...semblies must be secured to and lifted by hoisting machines that can bear their weight when they are replaced Ensure that no hazard is caused by raising components or assemblies Do not position yourse...

Страница 7: ...iate implementation conditions and operating conditions as needed however an inspection to ensure operationally safe status must be performed by an expert at least once a year The results of the inspe...

Страница 8: ...raphic presentation Overall view PG 1 Engine 2 Protective frame 3 Gas lever 4 Handle 5 V belt guard 6 Protective cage 7 Troweling blades 8 Adjusting lever troweling blade adjuster 9 Short circuit butt...

Страница 9: ...the gearbox of the trowel machine by the centrifugal clutch and a V belt The troweling blades and the troweling pan attached to the gearbox smooth the concrete or screed Operation Start the Robin Suba...

Страница 10: ...in kg 53 74 78 95 Dimensions Overall length in mm 1575 2166 2241 2366 Protective ring diameter in mm 595 786 936 1186 Height with folded manual guidance rod in mm 900 900 900 900 Operating diameter in...

Страница 11: ...PG55_110 11 2 1 3 4 5 6 1 Description 2 TYPE 3 Serial number 4 Year of construction 5 Mass 6 Rated power kW...

Страница 12: ...g capacity of 150 kg Do not step under suspended loads Checking the engine oil level Pull the oil dipstick 1 out of the crankcase Insert the oil dip stick in the oil filler neck but do not screw it in...

Страница 13: ...eft close Open the fuel cock 2 After the engine has warmed up slide the choke lever to the right open Slowly tighten the handle 1 of the reversing starter 2 until resistance is noticeable Allow the ha...

Страница 14: ...hind the drive shaft are increased and decreased respectively A clockwise rotational movement will cause the machine to move to the left Move to the right Push the machine down slightly using the manu...

Страница 15: ...it evaporates The number of passes required for pre troweling cannot be specified exactly as this number is influenced by various factors e g concrete consistency ambient temperature humidity etc Unde...

Страница 16: ...Turn the short circuit button 1 to the 0 OFF position During breaks even if they are short the machine must be shut down Parked devices that represent an obstacle must be safeguarded against through...

Страница 17: ...dly manner If lubricating oils and fuel come into contact with skin they can cause skin cancer Upon contact with the skin clean affected skin with suitable cleaning agent without delay If accessible d...

Страница 18: ...Danger of scalding due to hot oil If lubricating oils and fuel come into contact with skin they can cause skin cancer Upon contact with the skin clean affected skin with suitable cleaning agent witho...

Страница 19: ...PG55_110 19 1 1 Checking the V belt Remove the V belt guard 1 Check the V belt 1 for cracks damaged flanks and wear If there is excessive wear replace the V belt as specified in the repair manual...

Страница 20: ...ular unleaded gasoline 3 6 6 0 Worm gear Semi fluid grease Grease 00 Mobil Glygoyle 0 9 0 9 Troubleshooting Fault Possible cause Remedy Machine does not start Operating error Execute start process as...

Страница 21: ...fuel up to the lower edge of filler neck Engine Check oil level if necessary fill to upper oil level mark Check air filter clean replace if necessary Check fuel filter change if necessary All bare pa...

Страница 22: ...22 PG55_110...

Страница 23: ...ARL 14 rue d Arsonval 69680 Chassieu Telephone Fax E mail 33 0 472 791020 33 0 472 791021 france webermt com in Poland WEBER Maschinentechnik Sp zo o Ul Jeziorki 86 02 863 Warszawa Telephone Fax E mai...

Страница 24: ...n plates Vibrating tampers Vibration rollers Joint cutters Internal vibrators and converters Rollers Weber MASCHINENTECHNIK GmbH Im Boden 57334 Bad Laasphe R ckershausen Telephone 49 0 27 54 398 0 Fax...

Отзывы: