3.2 Maintenance Survey
Any maintenance work which must be performed on the compactor is listed in two charts. The first chart (paragraph
3.2.1) indicates the initial maintenance work which has to be carried out once at a certain time after commissioning.
The routine maintenance work indicated in the second chart (paragraph 3.2.2) has to be repeated at regular
intervals.
Both charts have the same lay-out. The column "Maintenance Interval" indicates the time or the operating hours
at which (after which) the maintenance work must be done.
If two time data are given, maintenance work has to be carried out at the time which occurs at first.
The column "Maintenance Item" refers to the assembly group on which the work indicated in the column
"Maintenance Work" must be carried out.
The column "Remarks/Notes" contains cross-references on paragraphs of these operating and maintenance
instructions or other documentation in which the maintenance work is described in detail.
3.2.1 Initial Maintenance
CF-2
21
Maintenance Interval Maintenance
Item
Remarks/
Notes
After the first 10 operating
hours
Vibrator
-
Check, and if necessary,
increase the V-belt tension
# 3.3.4/5
After the first 20 operating
hours
Engine
- Change the engine oil
# 3.3.1
Vibrator
- Change the oil
# 3.3.6
Whole machine
-
Check all screwed
connections for tight seat,
retighten them, if required
Maintenance Work