Projectors
Lamps
FLC220: . . . . . . . . . . . . . . . . . . . . 12 LED 24W / 36W / 52W
FLC240: . . . . . . . . . . . . . . . . . . . 24 LED 48W / 72W / 104W
FLC260: . . . . . . . . . . . . . . . . . . 36 LED 72W / 108 W / 155W
Protection: IP66,
IK08 (PMMA), IK06
(
Safety glass lens)
Class I, ta = 25°C
Installation
The product must be installed and maintained by a suitably
qualified professional in compliance with latest building/
construction and/or electrical regulations and relevant
legislation.
Warning:
Switch off mains electrical supply prior to
installing and connecting the luminaire. Do not open lumi-
naire while mains supply is switched on.
Notice:
If the luminaire is modified by anybody other than
the original manufacturer, then the warranty will no longer
be valid and shall become the full responsibility of the
modifying person/organisation. Claims based on defects
attributable to improper installation and/or application, and
the consequences thereof, are excluded.
In case of component failure due to abnormal circumstances
or at end of life, replacement must be carried out by a suit-
ably qualified and trained professional.
Installation Procedure
1)
Prior to electrical connection, proceed with mechanical
installation by firmly fixing stirrup
A
to optional mounting
accessory or directly to a suitable surface.
Aim luminaire.
Caution:
Make sure not to damage any electric cable,
water pipe or other devices while drilling holes.
2)
Switch off the mains electrical supply.
3)
Remove gear box cover
B
by releasing screws
C
.
4)
Check that rating shown on the luminaire label conforms
with the mains electrical supply.
5)
Feed
suitable
mains supply cable
D
through cable gland
E
.
6)
Connect to the correspondingly marked contacts of
terminal
F
, according to the wiring diagram.
Tighten cable gland
E
firmly.
7)
Reposition gear box cover
B
and tighten screws
C
evenly.
8)
Loosen the two screws
G
slightly. Aim luminaire in
desired direction, tighten screws
G
firmly (
100Nm
).
In addition, tighten screw
H
to secure orientation of
luminaire.
B
F
C
E
A
H
G
D
160
145
ø 260
70
ø 18
ø 14
44
165
190
ø 340
70
ø 18
ø 14
44
175
195
ø 385
60
44
ø 18
ø 14
FLC220
FLC240
FLC260
ON-OFF / ADVANCED
BASIC
1-10V
DALI
DMX
Maintenance
Apart from cleaning the product’s exterior surfaces, no
special maintenance work is required.
Clean only with a
cloth and water
Do not use high-pressure cleaners.
Protect our environment: Discard used LEDs in compliance
with the most recent environmental legislation.
Windage area
FLC220: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0,054 m²
FLC240: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0,090 m²
FLC260: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0,116 m²
Weight:
FLC220: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . max. 9,1 kg
FLC240: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . max. 13,8 kg
FLC260: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . max. 18.8 kg
ø 5,5 – 12 mm
0,14 – 2,5 mm
2
DMX-Power
Notice:
In case the luminaire is equipped with an optional
ly
available surge protector, the function can get tested if the
signal LED is lit green when the supply voltage is turned on.
In case the surge protector is defective, the LED device gets
automatically disconnected from the mains supply.
If the signal LED is not lit, the luminaire is not functioning.
Tools required
– Screwdriver TX 25
– Screwdriver TX 40
– Screwdriver with blade
3x1
–
Screwdriver TX70
Wiring Diagram
WE-EF Eco Step Dim® Advanced and
non dimmable luminaires
Class I
Phase to
L1
, Neutral to
N
and Earthing to
WE-EF Eco Step Dim® Basic
Class I
Phase to
L1
, Control Phase to
L2
,
Neutral to
N
and Earthing to
1-10V / DALI / WE-EF Eco Step Dim® Dynamic
Class I
Phase to
L1
, Neutral to
N
and Earthing to
,
1-10V, DALI, DMX to
+
and 1-10V, DALI, DMX to
–
Torque
Screw
T
orque
M4
max.
2,0 Nm
M5
max.
4,0 Nm
M6
max.
6,0 Nm
M8
max. 15,0 Nm
M16
max. 100,0 Nm
Da
Da
Shield