Installation
The product must be installed and maintained by
a suitably qualified professional in compliance with
latest building/construction and/or electrical regulati-
ons and relevant legislation.
Luminaire can be driven over at low speed, without
accelerating or turning, by vehicles with air-filled tires,
at a weight up to 5 tonnes per wheel. Max. static load,
3 tonnes.
Do not open the luminaire in humid conditions or
during rain. This will result in condensation forming
inside the luminaire.
Maintenance
Apart from cleaning the product’s exterior surfaces,
no special maintenance work is required. Do not use
high-pressure cleaners.
A
B
Installation blockout BEV pic. 1
Installation blockout BEV pic. 2
Installation blockout BEV
Ensure that proper drainage is provided, e.g. a gravel
bedding.
1) Take the installation cover
A
out of the installation
blockout
B
. Lead the connecting cable through the
drilled hole inside the blockout.
2) Place the cable at the bottom area of the blockout,
than replace the cover
A
onto the blockout
B
. The
blockout needs to get placed on an even, stable
area. The top edge needs to be flush with surface.
ATTENTION:
If the floor will be tiled or paved
afterwards leave an appropriate gap).
Warning:
Switch off mains electrical supply prior to
installing and connecting the luminaire. Do not open
luminaire while mains supply is switched on.
Notice:
If the luminaire is modified by anybody other
than the original manufacturer, then the warranty will
no longer be valid and shall become the full respon-
sibility of the modifying person/organisation. Claims
based on defects attributable to improper installation
and/or application, and the consequences thereof, are
excluded.
In case of component failure due to abnormal circum-
stances or at end of life, replacement must be carried
out by a suitably qualified and trained professional.
In case of questions please contact our technical hot-
line at +1 724 742 0030 (Monday - Friday from 08:00
until 16:00 hours).
3) In case the luminaire gets installed at a later time,
the blockout must get covered by the installation
cover
A
, to make sure no concrete or dirt may
enter the luminaire.
The installation cover ensures that the blockout
does not get damaged during masonry works and
needs to remain inside the BEV until installation of
the luminaire.