background image

Installation 

The product must be installed and maintained by 
a suitably qualified professional in compliance with 
latest building/construction and/or electrical regulati-
ons and relevant legislation. 

Luminaire can be driven over at low speed, without 
accelerating or turning, by vehicles with air-filled tires, 
at a weight up to 5 tonnes per wheel. Max. static load, 
3 tonnes.

Do not open the luminaire in humid conditions or 
during rain. This will result in condensation forming 
inside the luminaire.

Maintenance 

Apart from cleaning the product’s exterior surfaces, 
no special maintenance work is required. Do not use 
high-pressure cleaners. 

A

B

Installation blockout BEV pic. 1

Installation blockout BEV pic. 2

Installation blockout BEV 

Ensure that proper drainage is provided, e.g. a gravel 
bedding.

1)  Take the installation cover 

A

 out of the installation 

blockout 

B

. Lead the connecting cable through the 

drilled hole inside the blockout. 

2)  Place the cable at the bottom area of the blockout, 

than replace the cover 

A

 onto the blockout 

B

. The 

blockout needs to get placed on an even, stable 
area. The top edge needs to be flush with surface.  

ATTENTION:

 If the floor will be tiled or paved 

afterwards leave an appropriate gap).

 

Warning: 

Switch off mains electrical supply prior to 

installing and connecting the luminaire. Do not open 
luminaire while mains supply is switched on.

Notice:

 If the luminaire is modified by anybody other 

than the original manufacturer, then the warranty will 
no longer be valid and shall become the full respon-
sibility of the modifying person/organisation. Claims 
based on defects attributable to improper installation 
and/or application, and the consequences thereof, are 
excluded. 

In case of component failure due to abnormal circum-
stances or at end of life, replacement must be carried 
out by a suitably qualified and trained professional.

In case of questions please contact our technical hot-
line at +1 724 742 0030 (Monday - Friday from 08:00 
until 16:00 hours).

 
 

3)  In case the luminaire gets installed at a later time, 
 

the blockout must get covered by the installation 

 

cover 

A

, to make sure no concrete or dirt may 

 

enter the luminaire.

 

The installation cover ensures that the blockout 

 

does not get damaged during masonry works and 

 

needs to remain inside the BEV until installation of 

 

the luminaire.

Отзывы: