background image

4

Phase One 

Blockout Installation Procedure

(during earth or masonry work)

1)  Ensure a suitable recess is provided to accommo-

date installation blockout/mounting ring assembly 

B

/

M

.

2)  Set installation blockout/mounting ring assembly 

B

/

M

 in position and ensure that:

 a) 

Arrow 

R

 on mounting ring 

M

 is pointed towards 

the object to be illuminated (wall, tree, column).

 

b) Mounting ring 

M

LVƃXVKZLWKVXUIDFH

F

. If the 

ƃRRUZLOOEHWLOHGRUSDYHGDIWHUZDUGVOHDYHDQDS

-

propriate gap.

 

c) Mains supply cable(s) 

O

LVRIVXIƂFLHQWOHQJWKWR

connect sealable junction box 

J

 with terminal cable 

E

 from luminaire housing 

A

.

3)  Select appropriate installation blockout holes 

S

  

(at the corners of installation blockout 

B

). Peel-off 

sticker(s) and feed mains supply cable(s) 

O

 through 

installation blockout holes 

S

.

4)  During ongoing earth and/or masonry works, do 

QRWUHPRYHVWLFNHUVRQƂ[LQJWKUHDGKROHV

D

Ensure that installation blockout/mounting ring as-

sembly 

B

/

M

 is not damaged and has maintained 

its original shape. If necessary use a cover plate.

Phase Two

Luminaire Installation and Electrical Connection

5)  Switch off mains electrical supply.

6)  Check that rating shown on luminaire label con-

forms with mains electrical supply.

7) Terminate cable 

E

 (from luminaire housing 

A

) and 

mains supply cable 

O

 in sealable junction box 

J

  

(or: two mains supply cables 

O

, if through wiring is 

required). For termination details, refer to separate 

instruction sheet as provided with junction box.

8)  Set cables and sealable junction box 

J

 inside  

installation blockout/mounting ring assembly 

B

/

M

.

 3HHORIIVWLFNHUVRQƂ[LQJWKUHDGKROHV

D

. Loosen 

countersunk screws 

C

 (do not turn out). Insert 

mounting lever 

L

 between head of countersunk 

screws 

C

 and cover lens. Place luminaire housing 

A

 

into installation blockout/mounting ring assembly 

B

/

M

 (Fig. III) while aligning holes 

D

 on mounting 

ring 

M

Warning

: When luminaire housing 

A

 is placed in-

side installation blockout 

B

, ensure there is no 

stress on seal able junction box 

J

 or electric cables 

(Fig. IV).

10) Tighten countersunk screws 

C

 ‘hand-tight’.

Отзывы: