background image

Wiring diagram uni-colour (W/R/R/B/Y)

Power supply

12VDC

brown

white

blue
black

Junction box

- W/R/G/B/Y

Wiring diagram multicolour (RGB)

Power supply

Junction box

12VDC

brown

white

blue
black

- R
- G
- B

6)  Connect the connection cable 

B

 outside of the 

installation blockout with a sealable junction 
box (WE-EF 185-1624). Hereby the service con-
duit gets connected according wiring diagram.

8)  Ensure that installation blockout 

A

 is protected 

from damage during continuing earth or masonry 
works. To avoid dirt close the blockout with the 
provided blanking plug (WE-EF 185-1850). Only 
an undamaged blockout guarantees a troub-
le-free installation of inground uplights.

7)  Inground uplights with LED can get operated 

with the light control WE-EF CONTROL in com-
bination with the control module UDM. Here 
the power supply is done via the control module. 

  The luminaire 185-1562 (RGB) shall get opera-

ted generally with control module UDM! 

  All cables must get sealed in the junction box 

D

 

in any case.

  In case a 12V DC power supply is available, no 

power unit is necessary.

 

11) Insert the luminaire into the inground uplight 

A

 

in that way, that the fixing screws 

F

 lock in posi-

tion inside fixing holes of the inground uplight. 
Push luminaire inside installation blockout and 
hand tighten the fixing 

F

 screws.

Phase 3 

(Installation of luminaire)

9)  Inground uplights are supplied with integrated 

circuit board, it is not necessary to open the 
luminaire.

10) Remove safety cap from the connection plug 

B

 and connect it to the luminaire 

C

. While 

tightening of the plug hold down luminaire at 
knurling.

LED Replacement and Maintenance 

Warning: Do not open luminaire while in operation 
or while mains supply is switched on!

1)  Switch off the mains electrical supply.

2)  Loosen screws 

F

 and pull luminaire out upwards 

with help of a mounting lever 

G

 (WE-EF 185-1438). 

Disconnect luminaire from connection cable 

B

Equip connection cable with a corresponding 
plug to protect it from dirt.

3)  Open luminaire only in dry condition Disconnect 

LEDs from the connection cable and carefully 
take them out. Insert new circuit board.

 

 

4)  Check gaskets of functionality and exchange if  

necessary.

5)  Close luminaire. Connect it to connection cable 

B

. Hold down luminaire at the knurling during 

connection.

6)  Insert luminaire into the installation blockout as 

described under phase 3.

Отзывы: