Installation Methods with BET
Ensure that proper drainage is provided for the
shown installation methods.
1) In landscaped areas (soil with gravel base),
fig. 1
2) In paved areas (concrete with gravel base),
fig. 2
3) Determine position of installation blockout
A
.
Ensure the following details:
a) the connecting cable
B
must be inserted into
the installation blockout
A
in that way, that
the plug can get extracted out of the installa-
tion blockout for approx. 12 in for connection
of luminaire.
b) the upper rim installation blockout
E
must be
installed in that way, that it is flush with the
soil, basement or similar.
Attention:
In case tiles or paving blocks will
be paved at a later time, a respective admea-
sure has to be considered.
≈
12 in
fig. 1
fig. 2
gravel (drainage)
concrete
soil
Phase Two
(Electrical connection, aiming)
4) Switch off mains electrical supply.
02/19 IP68
ETC109
12V DC
185-XXXX
SOE XXXXXXX
LED 0,5 - 1,5W item no. XXX
5) Check that rating shown on luminaire label
conforms with mains electrical supply.
E
A
B
C
F
G
D
ø 0.87
ø 3.62
ø 2.56
1.89
4.72