Installation Methods with BET 

Ensure that proper drainage is provided for the 
shown installation methods. 

1)  In landscaped areas (soil with gravel base),

 fig. 1

2)  In paved areas (concrete with gravel base), 

fig. 2

3)  Determine position of installation blockout

 A

Ensure the following details:

a) the connecting cable 

B

 must be inserted into 

the installation blockout 

A

 in that way, that 

the plug can get extracted out of the installa- 
tion blockout for approx. 12 in for connection 
of luminaire.

b) the upper rim installation blockout 

E

 must be 

installed in that way, that it is flush with the 
soil, basement or similar.

 

Attention:

 In case tiles or paving blocks will 

be paved at a later time, a respective admea-
sure has to be considered.

 12 in

fig. 1

fig. 2

gravel (drainage)

concrete

soil

Phase Two

  (Electrical connection, aiming)

4)  Switch off mains electrical supply. 

 

02/19 IP68

ETC109

 

12V DC

185-XXXX

 

 

SOE XXXXXXX

LED 0,5 - 1,5W  item no. XXX

5)  Check that rating shown on luminaire label 

conforms with mains electrical supply.

E

A

B

C

F

G

D

ø 0.87

ø 3.62

ø 2.56

1.89

4.72