We Care Solar - Solar Suitcase Installation Guide - 2017
Page | 28
Step 7: Secure and protect the homerun cable.
Before you attach the solar panel to the roof, secure and protect the homerun
cable. (The drip loop can be done after the solar panel is installed.)
1. Stress relief near the junction box
2. Stress relief at another point on the panel
3. Stress relief on the roof
4. Protect the edge with conduit
5. Make a drip loop