background image

Long stem 

track roller

Double graduated 

end hinge

(Hinge tube)

Bottom section

Counterbalance 

lift cable

Short stem 

track roller

Bottom 

corner 

bracket

warning 

label

Bottom corner 

bracket warning label

#1 Single 

graduated 

end hinge

(Hinge tube)

Bottom 

weather 

seal

#1 Single 

graduated 

end hinge 

(Hinge tube)

Short stem 

track roller

Bottom

section

Counterbalance 

lift cable

Bottom corner

bracket

Short 

stem 

track 

roller

Short stem 

track roller

1/4”-20 x 

11/16” Self 

drilling screws

1/4” - 20 x 11/16” Self 

drilling screws (RED HEAD)

Positioning Bottom Section

 

3

 

Center the bottom section in the door opening. Level the section using wooden shims (if 

necessary) under the bottom section. When the bottom section is leveled, temporarily hold it 

in place by driving a nail into the jamb and bending it over the edge of the bottom section on 

both sides.

Weather seal (If applicable)

Level

Bottom section

Wooden shims (If necessary)

Vertical Tracks

 

4

 

NOTE:

 Depending on your door, you may have Quick Install Flag Angles, Fully Adjustable Flag 

Angles, Riveted Vertical Track Assemblies or you may have Angle Mount Vertical Track As-

semblies. Refer to Package Contents / Breakdown Of Parts, to determine which Flag Angles / 

Vertical Track Assemblies you have.

IMPORTANT: 

IF YOUR DOOR IS TO BE INSTALLED PRIOR TO A FINISHING CONSTRUCTION 

OF THE BUILDING’S FLOOR, THE VERTICAL TRACKS AND THE DOOR BOTTOM SECTION 

ASSEMBLY SHOULD BE INSTALLED SUCH THAT WHEN THE FLOOR IS CONSTRUCTED, NO 

DOOR OR TRACK PARTS ARE TRAPPED IN THE FLOOR CONSTRUCTION.

IMPORTANT: 

THE TOPS OF THE VERTICAL TRACKS MUST BE LEVEL FROM SIDE TO SIDE. 

IF THE BOTTOM SECTION WAS SHIMMED TO LEVEL IT, THE VERTICAL TRACK ON THE 

SHIMMED SIDE MUST BE RAISED THE HEIGHT OF THE SHIM.
Starting on the left hand side of the bottom section, remove the nail. Position the left hand 

vertical track assembly over the track rollers of the bottom section. Make sure the counter-

balance lift cable is located between the track rollers and the door jamb. 

NOTE:

 Drill 3/16” pilot holes into door jamb for the lag screws.

Loosely fasten jamb brackets and flag angle to the jamb using 5/16” x 1-5/8” lag screws. 

Tighten lag screws, securing the bottom jamb bracket to jamb, maintain 3/8” to 5/8” spac-

ing, between the bottom section and vertical track. Hang counterbalance lift cable over flag 

angle. Repeat same process for other side.

Vertical 

track 

assembly

Jamb 

bracket

Flag 

angle

Flag angle lag screw locations

5/16” x 1-5/8”

Lag screws

Bottom 

section

Track 

rollers

12R FA

3/8” to 5/8” 

Spacing

Bottom section

15R QI

12R QI

Floor

Track roller

15R FA

Vertical track

FOR RIVETED VERTICAL TRACK ASSEMBLY:

 Loosely fasten jamb brackets and flag angle 

to the jamb using 5/16” x 1-5/8” lag screws. Tighten lag screws, securing the bottom jamb 

bracket to jamb, maintain 3/8” to 5/8” spacing as shown between the bottom section and 

vertical track. Hang counterbalance lift cable over flag angle. Repeat same process for other 

side.

FOR ANGLE MOUNT VERTICAL TRACK ASSEMBLY:

 Loosely fasten the slots in the wall 

angle to the jamb using 5/16” x 1-5/8” lag screws. Tighten lag screws, securing the bottom 

slot in the wall angle, maintain 3/8” to 5/8” spacing as shown between the bottom section 

and vertical track. Hang counterbalance lift cable over angle mount. Repeat same process for 

other side.

Flag angle lag screw 

locations

3/8” to 5/8” 

Spacing

Bottom section

Vertical track

Bottom section

Vertical 

track

Jamb 

bracket

Flag 

angle

5/16” x 1-5/8”

Lag screws

Floor

Angle mount 

vertical track 

assembly

Bottom 

section

Riveted 

vertical track 

assembly

5/16” x 1-5/8”

Lag screws

Vertical 

track

Wall 

angle

Slot

Stacking Sections

 

5

 

NOTE:

 The sections can be identified by the graduation of the factory installed graduated end 

hinges. The smallest graduated end hinge on section should be stacked on top of the bottom 

section, with each graduated end hinge increasing as the sections are stacked, see Door 

Section Identification / Breakdown of Parts.

NOTE:

 Make sure graduated end and center hinges are flipped down, when stacking another 

section on top.

NOTE:

 Larger doors will use long stem track rollers with double graduated end hinges.

Place track rollers into graduated end hinges of remaining sections.
With assistance, lift second section and guide the track rollers into the vertical tracks. Lower 

section until it is seated against bottom section. Align vertical marks in the upper align-

ment sticker, with the lower alignment sticker on right hand side, on the back of door. Keep 

sections aligned. Flip hinges up. Fasten center hinge(s) first; then end hinges last using 1/4” 

- 14 x 5/8” self tapping screws.

NOTE:

 To prevent center hinge leaf(s) from rotating, first secure the top middle hole of the 

center hinge leaf with one 1/4” - 14 x 5/8” self-tapping screw then secure the other two 

8

Содержание 9800

Страница 1: ...stallation 7 Counterbalance Installation Instructions 10 Optional Installation 17 Door Arm Hookup 17 Inside Lock 17 Pull Down Rope 17 Maintenance 18 Cleaning Your Garage Door 18 Maintaining The Finish...

Страница 2: ...GTH VALUES IF NEEDED WARNING IMPACT GUNS ARE NOT RECOMMENDED WHEN INSTALLING 5 16 LAG SCREWS USING AN ELECTRIC DRILL DRIVER THE DRILL DRIVERS CLUTCH MUST BE SET TO DELIVER NO MORE THAN 200 IN LBS OF T...

Страница 3: ...Weatherstrips Level header Finished Door width Jambs Backroom Plumb jambs Finished Door Height Nail Headroom Header board 2 x 6 lumber preferred Suitable mounting surface 2 x 6 lumber minimum Min Side...

Страница 4: ...LOCK SECTION can be identified by 2 graduated end hinges The INTERMEDIATE SECTION I can be identified by 3 graduated end hinges The interme diate I section will have a warning label attached to eithe...

Страница 5: ...Locking pliers Safety glasses Approved winding bars Saw horses 5...

Страница 6: ...As Required J2 Counterbalance Lift Cables J3 Left Hand End Bearing Brackets As Required J4 Right Hand End Bearing Brackets As Required J5 Left Hand Cable Drum J6 Right Hand Cable Drum J7 Center Bracke...

Страница 7: ...in the jamb bracket with the lower hole of the hole slot pattern Hand tighten jamb bracket using 1 1 4 20 x 9 16 track bolt and 1 1 4 20 flange hex nut Place the center jamb bracket over the lower ho...

Страница 8: ...lift cable over flag angle Repeat same process for other side Vertical track assembly Jamb bracket Flag angle Flag angle lag screw locations 5 16 x 1 5 8 Lag screws Bottom section Track rollers 12R FA...

Страница 9: ...CORDING TO MANUFACTURER S INSTRUCTIONS AND FORCE SETTINGS MUST BE ADJUSTED PROPERLY Remove but retain 4 6 1 4 20 x 7 8 self drilling screws from the center of the strut allowing the drawbar operator b...

Страница 10: ...he top of the vertical track Tighten the bottom rail of the horizontal track to the angle mount with 2 1 4 20 x 9 16 track bolts and 2 1 4 20 flange hex nuts 3 8 16 Hex nuts 3 8 16 x 3 4 Truss head bo...

Страница 11: ...up and position the 2 center bearing brackets apart from each other Mark two vertical pencil lines one for each center bearing bracket onto the mounting surface above the door NOTE If your door came w...

Страница 12: ...upler halves the center bearing torsion spring with the black winding cone and one set collar at the left end of the torsion keyed shaft Next on the right hand side lay the other coupler half center b...

Страница 13: ...rews 3 3 8 16 Hex nuts 3 3 8 Washers 3 3 8 Washers 3 3 8 Lock washers Coupler halves Set screws Set screws Coupler halves Coupler assembly 3 3 8 16 x 1 3 4 hex head screws and 3 3 8 16 Hex nuts Statio...

Страница 14: ...ews are tight f Torsion spring or springs are installed correctly g Review the label attached to the spring warning tag to determine number of spring turns required NOTE Door MUST be closed and locked...

Страница 15: ...LLING AND CAUSE SEVERE OR FATAL INJURY Clamp a pair of locking pliers onto the vertical tracks just above the second track roller on one side and just below the second track roller on the other side T...

Страница 16: ...e set screws in the winding cone IMPORTANT BE PREPARED TO SUPPORT THE FULL FORCE OF THE TORSION SPRING ONCE THE SET SCREWS ARE LOOSE Carefully adjust spring tension 1 4 turn Retighten both set screws...

Страница 17: ...with the square hole in the vertical track The inside lock should be spaced ap proximately 1 8 away from the section edge IMPORTANT INSIDE LOCK S MUST BE REMOVED OR MADE INOPERATIVE IN THE UN LOCKED P...

Страница 18: ...above the door should be engaged to prevent the door from rapidly descending in case of spring failure or forceful manual operation EXTENSION SPRINGS A restraining cable or other device should be inst...

Страница 19: ...ial or industrial building applications This warranty does not apply to any unauthorized alteration or repair of the Product or to any Product or component which has been damaged or deteriorated due t...

Страница 20: ...rvice representative They will be happy to handle any questions that you may have Thank you for your purchase PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE After installation is complete leave this I...

Отзывы: