manualshive.com logo in svg
background image

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, 

refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

graduated Hinge Attachment

Tools: Power drill,7/16” Socket driver

 

 

NOTE:

 Refer to door section identification, located in the pre-installation section of this 

manual.

NOTE:

 The graduated hinges can be identified by the number stamped onto their lower hinge 

leaf.
Locate the bottom section, (2) #1 graduated end hinges (wide body) for the end stiles and 

depending on the width of your door, enough #1 center hinge(s) (narrow body) for each of 

the pre-marked center hinge locations. Starting on the left hand side of the bottom section, 

align the lower hinge leaf of the #1 graduated end hinge over the holes, located at the top 

of the end caps. Also, align the lower hinge leafs of the #1 center hinges (narrow body) with 

the pre-marked locations at the center locations at the top of the section. Attach lower hinge 

leafs to the section using (2) 1/4”-14 x 7/8” self drilling screws.

IMPORTANT: 

ONCE THE 1/4”-14 x 7/8” SELF DRILLING SCREWS ARE SNUG AGAINST THE 

LOWER HINGE LEAFS, TIGHTEN AN ADDITIONAL 1/4 TO 1/2 TURN TO RECEIVE MAxIMUM 

DESIGN HOLDING POWER.

IMPORTANT: 

PUSH & HOLD THE HINGE LEAF SECURELY AGAINST THE SECTION WHILE 

SECURING WITH 1/4”-14 x 7/8” SELF DRILLING SCREWS. THERE SHOULD BE NO GAP 

BETWEEN THE HINGE LEAF AND THE SECTION.
Place a short stem track roller into each graduated end hinge. Repeat graduated hinge 

attachment using the appropriate graduated end hinges for all remaining sections except the 

top section.

IMPORTANT: 

WHEN PLACING SHORT STEM TRACK ROLLERS INTO THE #2 GRADUATED 

END HINGES AND HIGHER, THE SHORT STEM TRACK ROLLER GOES INTO HINGE TUBE 

FURTHEST AWAY FROM SECTION.
Use (2) #2 graduated end hinges (wide body) and the required number of #1 center hinge(s) 

(narrow body) for each of the center hinge pre-marked location(s) along the top edge of the 

lock section (second section).
Use (2) #3 graduated end hinges (wide body) and the required number of #1 center hinge(s) 

(narrow body) for each of the center hinge(s) (narrow body) pre-marked location(s) along the 

top edge of the intermediate I section (third section).
Use (2) #4 graduated end hinges (wide body) and the required number of #1 center hinge(s) 

(narrow body) for each of the center hinge pre-marked location(s) along the top edge of the 

intermediate II section (third section).

#1Center hinge(s) 

(Narrow body)

#1 Graduated end 

hinge (Wide body)
Lower leaf

#2 Graduated end hinge

(roller inserted into tube 

furthest from section)

(2) 1/4”-14 x 7/8” Self 

drilling screw locations

Pre-punched 

holes in 

endstiles

Pre-marked 

locations on 

section surface

Short stem 

track roller

Strut Attachment

Tools: Power drill, 7/16” Socket driver, (2) Saw horses, Tape measure

 

 

NOTE:

 Refer to door section identification, located in the pre-installation section of this 

manual to determine what size sections you need to use as your lock (second) section, inter-

mediate I (third) section, intermediate II (fourth section on a five section door) and top section. 

Measure your sections to make sure they are the correct height as indicated on the chart.

NOTE:

 Depending on the size of your door, one or more sections may require a strut.

Using sawhorses, lay sections together on a flat smooth surface. Ensure the hinges are on 

top of their corresponding sections. Referring to the strutting schedule, determine how many 

struts your door needs and on what sections they are needed to be installed.

NOTE:

 Sections not noted in the strutting schedule, do not require a strut.

NOTE:

 All strut(s) are placed at the top of the section.

INSTALLATION ON ALL SECTIONS (ExCEPT TOP SECTION):

 Place the strut on the section 

up against the bottom of the hinges. Center the strut side to side on the section as shown. 

Secure to the section using (2) 1/4”-14 x 7/8” self drilling screws at each end hinge location 

and (2) 1/4”-14 x 7/8” self drilling screw at each center hinge location.

INSTALLATION ON TOP SECTION:

 Place the strut on the top section, center the strut side 

to side on the top edge of the top section. Loosely fasten to the section using (2) 1/4”-14 

x 7/8” self drilling screws at each endstile. The 1/4”-14 x 7/8” self drilling screws for the 

endstiles will be secured after step, Top Fixture is completed. Next, secure strut to the section 

using (2) 1/4”-14 x 7/8” self drilling screw at each center hinge location at each pre-marked 

location.

Strutting Schedule

Section quantity

Section

Solid / Win-

dows

Door Width

6’0” – 10’0”

12’0”

13’0” – 18’0”

4

Top

Solid

N/A

1

1

Windows

1

1

1

Intermediate

Solid

N/A

N/A

N/A

Windows

1

1

N/A

Lock

Solid

N/A

N/A

N/A

Bottom

N/A

N/A

1

5

Top

Solid

N/A

1

1

Windows

1

1

1

Intermediate II

Solid

N/A

N/A

N/A

Windows

1

1

N/A

Intermediate

Solid

N/A

N/A

1

Windows

1

1

1

Lock

Solid

N/A

N/A

N/A

Bottom

Windows

N/A

N/A

1

1/4”-14 x 7/8” Self drilling 

screws

Typical upper 

hinge leaf

Strut installation 

for other sections

Strut installation 

for top section

Strut

Strut

Strut installation at 

top of top section

Strut installation for other sections

Typical lower 

hinge leaf

1/4”-14 x 7/8” Self drilling 

screws

End hinges

Center hinge(s)

Top Fixtures

Tools: Power drill, 7/16” Socket driver, (2) Saw horses, Tape measure

 

 

Remove, but retain the 1/4”-14 x 7/8” self drilling screws from the right side of the strut, 

allowing enough room to slide the top fixture between the top section and the strut (if appli-

cable). Slide the top fixture between the strut and top section. Align the edge of the top fixture 

parallel to the top section edge. Secure the top fixture to the top section using (1) 1/4”-14 x 

7/8” self drilling screw through the lower slot of top fixture. Adjust the top fixture, if neces-

sary. Finish re-attaching the strut using the (2) 1/4”-14 x 7/8” self drilling screws removed 

previously. Insert a short stem track roller into top fixture. Repeat for left hand side.

Top fixture 

base

Short stem 

track roller

Strut

(if applicable)

End cap

Top 

section

(3) 1/4”-14 x 7/8” 

Self drilling screws

Step Plate

Tools: Power Drill, 7/16” Drill Bit, Phillips Screwdriver, Tape Measure

 

 

NOTE:

 Refer to door section identification, located in the pre-installation section of this 

manual.
On the inside of the bottom section, locate the vertical center of the door.
Center the inside step plate vertically no higher than 8” from the bottom of the door to the 

top of the step plate. 

IMPORTANT: 

DO NOT MOUNT THE STEP PLATE HIGHER THAN 8” FROM THE BOTTOM OF 

THE SECTION.
Using the inside step plate’s second top most hole and bottom hole as a template, drill 7/16” 

diameter holes through the entire section.

NOTE:

 Be extremely careful to keep drill straight when drilling through the section.

7

Содержание 8700

Страница 1: ...Wayne Dalton a Division Of Overhead Door Corporation P O Box 67 Mt Hope OH 44660 Or Online At www Wayne Dalton com Front Mount Low Headroom Inside Hook Up MH installation instructions and owner s manu...

Страница 2: ...H3 Drawbar Operator Bracket Supplied By Others As Required I Tracks I1 Left Hand Horizontal Track Assembly I2 Right Hand Horizontal Track Assembly I3 Left Hand Vertical Track I4 Right Hand Vertical T...

Страница 3: ...es monthly following opener manufacturer s instruc tions 16 NEVER hang tools bicycles hoses clothing or anything else from horizontal tracks Track systems are not intended or designed to support extra...

Страница 4: ...inside perimeter of your garage door opening should be framed with wood jamb and header material The jambs and header must be securely fastened to sound framing members It is recommended that 2 x 6 l...

Страница 5: ...ts TRACK TYPE SPACE NEEDED 3 LHR 8 203 mm 6 LHR 8 3 4 222 mm Weatherstrips Level header Finished Door width Jambs Backroom Plumb jambs Finished Door Height Nail Headroom Header board 2 x 6 lumber pref...

Страница 6: ...op of track Bottom Weather Seal Tools Power Drill 7 16 Socket driver Tape measure 3 NOTE Refer to door section identification located in the pre installation section of this manual Determine what size...

Страница 7: ...more sections may require a strut Using sawhorses lay sections together on a flat smooth surface Ensure the hinges are on top of their corresponding sections Referring to the strutting schedule deter...

Страница 8: ...shims if necessary 10 Center the bottom section in the door opening Level the section using wooden shims if necessary under the bottom section Weather seal Level Bottom section Wooden shims If necessa...

Страница 9: ...e Dalton operator trolley bracket must be securely attached to the top section of the door if one has been provided along with any struts provided with the door if a Wayne Dalton operator trolley brac...

Страница 10: ...lot 1 4 20 x 9 16 Track bolts Bottom rail Fully Adjustable Horizontal track 1 4 20 Flange hex nuts Flag angle upper slot 1 4 20 Flange hex nut Top rail of horizontal track 1 4 20 x 9 16 Track bolt Was...

Страница 11: ...and slide one end of the torsion shaft through one end bearing bracket Lay the middle of the torsion shaft into the center bracket Slide the other end of the torsion shaft into the other end bearing b...

Страница 12: ...ttom section Vice clamps attached to inner and outer rail of vertical track Winding Springs Tools Step Ladder Approved winding bars 3 8 Wrench 23 Position a ladder slightly to the side of the spring s...

Страница 13: ...Keep horizontal tracks parallel and within 3 4 to 7 8 maxi mum of door edge otherwise door could fall resulting in severe or fatal injury Important Do not support the weight of the door on any part of...

Страница 14: ...asteners or other parts of the counterbalance system Adjustments or repairs must ONLY be made by a trained door systems technician using proper tools and instructions DO NOT remove cover or paint over...

Страница 15: ...r fatal injury Measure and mark the jamb approximately 48 to 50 1220 to 1270 mm from floor on the right or left side of jamb Drill 1 8 pilot hole for no 6 screw eye Tie the pull down rope to the no 6...

Страница 16: ...the door To avoid possible damage to your door Wayne Dalton recommends reinforcing the top section with a strut may or may not be supplied The installation of the opener must be according to manufact...

Страница 17: ...been made at all At the Manufacturer s option pursuant to the dealer having notified the Manufacturer of a warranty claim a service representative may inspect the product on site or Buyer may be requi...

Страница 18: ...ection online at www Wayne Dalton com Covered by one or more of the following Patents 5 408 724 5 409 051 5 419 010 5 495 640 5 522 446 5 562 141 5 566 740 5 568 672 5 718 533 6 019 269 6 089 304 6 64...

Отзывы: