manualshive.com logo in svg
background image

Inside Lock

Tools: Power drill, 7/16” Socket driver, Tape measure

Install the inside lock on the second section of the door. Secure the lock to the section with (4) 

1/4”-20 x 11/16” self drilling screws. Square the lock assembly with the door section, and align 

with the square hole in the vertical track. The inside lock should be spaced approximately 1/8” 

away from the section edge.

IMPORTANT: 

INSIDE LOCK(S) MUST BE REMOVED OR MADE INOPERATIVE IN THE UNLOCKED 

POSITION IF AN OPERATOR IS INSTALLED ON THIS DOOR.

(4) 1/4”-20 x 11/16” 

Self drilling screws

Square hole in 

vertical track

Second section

Side lock

End stile

1/8”

Pull Down Rope

Tools: Power drill, 1/8” Drill bit, Tape measure

WARNINg

   WARNINg

DO NOT INSTALL PuLL DOWN ROPE ON DOORS WITH OPERATORS. CHILDREN 

MAy BECOME ENTANgLED IN THE ROPE CAuSINg SEvERE OR FATAL INJuRy.

Measure and mark the jamb approximately 48” to 50” (1220 to 1270 mm) from floor on the 

right or left side of jamb. Drill 1/8” pilot hole for no. 6 screw eye. Tie the pull down rope to the 

no. 6 screw eye and to the bottom corner bracket, as shown.

Typical bottom 
corner bracket

Pull down 
rope

No. 6 Screw eye

Pull 
down 
rope

48” to 50” 

From floor

Door Arm Hookup

Tools: Needle nose pliers

NOTE:

 If overhead door operator/ trolley bracket was installed, follow these directions.

Align hole in the door arm with holes in drawbar operator bracket tabs, as shown. Attach with 

5/16” x 1-3/4” cotter pin and cotter ring.

Drawbar operator

bracket tabs

Cotter

ring

5/16” x 1-3/4”  

Clevis pin

Typical trolley arm

Cotter ring

5/16” x 1-3/4”  

Clevis pin

15

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, 

refer to your local yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

optional Installation

Содержание 8700

Страница 1: ...Wayne Dalton a Division Of Overhead Door Corporation P O Box 67 Mt Hope OH 44660 Or Online At www Wayne Dalton com Front Mount Low Headroom Inside Hook Up MH installation instructions and owner s manu...

Страница 2: ...H3 Drawbar Operator Bracket Supplied By Others As Required I Tracks I1 Left Hand Horizontal Track Assembly I2 Right Hand Horizontal Track Assembly I3 Left Hand Vertical Track I4 Right Hand Vertical T...

Страница 3: ...es monthly following opener manufacturer s instruc tions 16 NEVER hang tools bicycles hoses clothing or anything else from horizontal tracks Track systems are not intended or designed to support extra...

Страница 4: ...inside perimeter of your garage door opening should be framed with wood jamb and header material The jambs and header must be securely fastened to sound framing members It is recommended that 2 x 6 l...

Страница 5: ...ts TRACK TYPE SPACE NEEDED 3 LHR 8 203 mm 6 LHR 8 3 4 222 mm Weatherstrips Level header Finished Door width Jambs Backroom Plumb jambs Finished Door Height Nail Headroom Header board 2 x 6 lumber pref...

Страница 6: ...op of track Bottom Weather Seal Tools Power Drill 7 16 Socket driver Tape measure 3 NOTE Refer to door section identification located in the pre installation section of this manual Determine what size...

Страница 7: ...more sections may require a strut Using sawhorses lay sections together on a flat smooth surface Ensure the hinges are on top of their corresponding sections Referring to the strutting schedule deter...

Страница 8: ...shims if necessary 10 Center the bottom section in the door opening Level the section using wooden shims if necessary under the bottom section Weather seal Level Bottom section Wooden shims If necessa...

Страница 9: ...e Dalton operator trolley bracket must be securely attached to the top section of the door if one has been provided along with any struts provided with the door if a Wayne Dalton operator trolley brac...

Страница 10: ...lot 1 4 20 x 9 16 Track bolts Bottom rail Fully Adjustable Horizontal track 1 4 20 Flange hex nuts Flag angle upper slot 1 4 20 Flange hex nut Top rail of horizontal track 1 4 20 x 9 16 Track bolt Was...

Страница 11: ...and slide one end of the torsion shaft through one end bearing bracket Lay the middle of the torsion shaft into the center bracket Slide the other end of the torsion shaft into the other end bearing b...

Страница 12: ...ttom section Vice clamps attached to inner and outer rail of vertical track Winding Springs Tools Step Ladder Approved winding bars 3 8 Wrench 23 Position a ladder slightly to the side of the spring s...

Страница 13: ...Keep horizontal tracks parallel and within 3 4 to 7 8 maxi mum of door edge otherwise door could fall resulting in severe or fatal injury Important Do not support the weight of the door on any part of...

Страница 14: ...asteners or other parts of the counterbalance system Adjustments or repairs must ONLY be made by a trained door systems technician using proper tools and instructions DO NOT remove cover or paint over...

Страница 15: ...r fatal injury Measure and mark the jamb approximately 48 to 50 1220 to 1270 mm from floor on the right or left side of jamb Drill 1 8 pilot hole for no 6 screw eye Tie the pull down rope to the no 6...

Страница 16: ...the door To avoid possible damage to your door Wayne Dalton recommends reinforcing the top section with a strut may or may not be supplied The installation of the opener must be according to manufact...

Страница 17: ...been made at all At the Manufacturer s option pursuant to the dealer having notified the Manufacturer of a warranty claim a service representative may inspect the product on site or Buyer may be requi...

Страница 18: ...ection online at www Wayne Dalton com Covered by one or more of the following Patents 5 408 724 5 409 051 5 419 010 5 495 640 5 522 446 5 562 141 5 566 740 5 568 672 5 718 533 6 019 269 6 089 304 6 64...

Отзывы: