background image

3/8”-16 

Hex nut

Horizontal

track angle

3/8”-16 x 

3/4” Truss 

head bolt

1/4”-20 x 

9/16”

Track bolts

1/4”-20 

Flange hex 

nuts

Horizontal 

track

Flag angle 

upper slot

Level

IF YOU HAVE ANGLE MOUNT:

 To install horizontal track, place the curved end over the 

top track roller of the top section. Align the bottom of the horizontal track with the top of the 

vertical track. Tighten the horizontal track to the angle mount with (2) 1/4” - 20 x 9/16” track 

bolts and (2) 1/4” - 20 flange hex nuts.

3/8”-16 

Hex nut

Angle 

mount

3/8”-16 x 

3/4” Truss 

head bolt

1/4”-20 x 

9/16”

Track bolts

1/4”-20 

Flange 

hex nuts

Horizontal 

track

Upper slot

Level

Vertical 

track

Horizontal

track angle

Next level the horizontal track assembly and bolt the horizontal track angle to the first 

encountered slot in the flag angle / angle mount using (1) 3/8” - 16 x 3/4” truss head bolt 

and (1) 3/8” - 16 hex nut. Repeat for other side. Remove nail that was temporally holding the 

top section in position.

IMPORTANT: 

FAILURE TO REMOVE NAIL BEFORE ATTEMPTING TO RAISE DOOR COULD 

CAUSE PERMANENT DAMAGE TO TOP SECTION.

Horizontal 

track

Level

Level

Horizontal 

track angle

Horizontal 

track angle

Horizontal 

track

Adjusting Top Fixtures

 

13

 

NOTE:

 Refer to Package Contents / Breakdown of Parts, to determine which Top Fixtures 

Assemblies you have.
With horizontal tracks installed, you can now adjust the top fixtures. Vertically align the top 

section of the door with the lower sections. Once aligned, position the top fixture slide, out 

against the horizontal track. Maintaining the slide’s position, tighten the 1/4” - 20 flange hex 

nuts or the 5/16” - 18 hex nut to secure each of the top fixture slide to the top fixture base.

Top fixture 

slide(s)

Tighten the 1/4” - 20 

Flange hex nuts

Horizontal track

Track roller

Top section

Intermediate 

section

Top 

section

Top 

section

If needed. lock each of the top fixture slides into place using (1) 1/4” - 20 x 9/16” track bolt 

and (1) 1/4” - 20 flange hex nut through any two aligning holes.

(1)1/4”-20 x 9/16” 

Bolt(s) and (1) 

1/4”-20 flange hex 

nut(s)

Top 

section

Track roller 

Top fixture 

assembly(s)

Top fixture 

slide(s)

Horizontal track

Intermediate 

section

Top 

section

Top 

section

Tighten the 5/16” - 18 

hex nut(s)

COUNTERBALANCE 

INSTALLATION INSTRUCTIONS

Attaching End Bearing Brackets

 

14

 

NOTE:

 Refer to Package Contents / Breakdown of Parts, to determine which End Bearing 

Brackets you have.

NOTE:

 Prior to fastening end bearing brackets into the door jamb, pilot drill using a 3/16” 

drill bit.

IMPORTANT: 

RIGHT AND LEFT HAND IS ALWAYS DETERMINED FROM INSIDE THE BUILDING 

LOOKING OUT.

NOTE:

 Depending on your door’s configuration you may have to break the end bearing 

brackets apart.

NOTE:

 End bearing brackets are right and left hand.

Attach the left hand end bearing bracket through either the end bearing bracket’s upper or 

lower slots to the left hand horizontal track angle using (2) 3/8” - 16 x 3/4” truss head bolts 

and (2) 3/8” - 16 nuts. 

Horizontal track angle

Horizontal track radius

Bend back and fourth to seperate 

the (2) end bearing brackets

(2) 3/8”-16

Hex nuts

(2) 3/8”-16 x 3/4”

Truss head bolts

Upper 

slots

Lower 

slots

Horizontal 

track angle

Or

IMPORTANT:

 THE END BEARING BRACKET’S LOWER SLOTS ARE USED ON DOORS WITH 12” 

RADIUS TRACK; THE UPPER SLOTS ARE USED ON DOORS WITH 15” RADIUS TRACK.

(2) 3/8”-16

Hex nuts

(2) 3/8”-16 x 3/4”

Truss head bolts

Upper 

slots

Lower 

slots

Left hand 

end bracket

Left hand 

end bracket

Secure the top of the end bearing bracket to the jamb using 5/16” x 1-5/8” lag screw(s). 

Repeat the same process for right hand side.

Jamb

5/16” x 1-5/8” 

Lag screws

Or

Left hand 

end bracket

Left 

hand 

end 

bracket

13

Содержание 105

Страница 1: ...s 6 Counterbalance Installation Instructions 13 Optional Installation 20 Door Arm Hookup 20 Lift Handles 20 Pull Down Rope 20 Maintenance 21 Cleaning Your Garage Door 21 Painting Your Garage Door 21 M...

Страница 2: ...NERS IF THE ORIGINAL FASTENER WAS RED HEAD THE REPLACEMENT FASTENER MUST BE RED HEAD ALSO CONTACT WAYNE DALTON FOR FASTENER STRENGTH VALUES IF NEEDED WARNING IMPACT GUNS ARE NOT RECOMMENDED WHEN INSTA...

Страница 3: ...inished Door width Jambs Backroom Plumb jambs Finished Door Height Nail Headroom Header board 2 x 6 lumber preferred Suitable mounting surface 2 x 6 lumber minimum Weatherstrips if applicable Jamb 1 8...

Страница 4: ...on side view illustration shows the section profile of all sections and can also be used to identify each section The BOTTOM SECTION can be identified by 1 The INTERMEDIATE I SECTION can be identified...

Страница 5: ...5 Center Bracket As Required J6 Center Bearing As Required J7 Torsion Shaft Torsion Keyed Shaft As Required J8 Torsion Keyed Shafts As Required J9 Keys As Required J10 Center Coupler Assembly As Requi...

Страница 6: ...tom weather seal with the flap pointing towards the outside surface of the bottom section Starting at one end of the door measure inward 1 and attach the bottom weather seal to the bottom of the botto...

Страница 7: ...applications Short stem track roller Spacer 4 1 4 14 x 1 Lag screws Track roller carrier Typical bottom corner bracket STD facing UP Side view of track roller carrier s Inner holes 2 Track Outer holes...

Страница 8: ...LONG STRUT Attach the upper slot of the center hinge to the Intermediate section using 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex nut Secure the lower hole of the center hinge to the Inte...

Страница 9: ...ing 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex nut Secure the lower hole of the graduated end hinge to the Intermediate section using 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex...

Страница 10: ...op Of Section 110 116 1 Short 310 311 314 316 Top Section Short Strut Strutting Schedule For Door Heights Greater Than Or Equal to 8 1 Door Models Door Width Location On Top Section Up To and In cludi...

Страница 11: ...rack rollers and the door jamb Starting on the left hand side remove the nail holding the bottom section to jamb Position the left hand vertical track assembly angle mount assembly over the track roll...

Страница 12: ...eader near the center of the door and bending it over the top section Now flip up the graduated end hinge and center hinge leaves hold tight against section and fasten center hinges first and end hing...

Страница 13: ...e 1 4 20 Flange hex nuts Horizontal track Track roller Top section Intermediate section Top section Top section If needed lock each of the top fixture slides into place using 1 1 4 20 x 9 16 track bol...

Страница 14: ...een the center of the door and the end bracket on each side to locate the intermediate center brackets Attach each of the center bracket s to the mounting surface using 5 16 RED HEAD lag screws as sho...

Страница 15: ...ring assembly and slide one end of the torsion keyed shaft through the end bearing bracket Lay the other side of the torsion keyed shaft into the center bracket Repeat the same process for the right h...

Страница 16: ...Adjust cable tension as needed until right and left cables both respond the same Once the counterbalance cables are set and if applicable tighten the coupler assembly together by tightening the 3 3 8...

Страница 17: ...rings or parts to which springs are connected such as steel brack ets cables wood blocks fasteners or other parts of the counterbalance system Adjustments or repairs must ONLY be made by a trained doo...

Страница 18: ...ce locking pliers on torsion shaft as shown in Step Attaching Counterbalance Lift Cables Insert a winding rod into the winding cone Push upward on the winding rod slightly while carefully loosening th...

Страница 19: ...t in serious injury to fingers and or hands if placed in the opening between sections when the door is operated manually The adjacent bottom corner bracket and all cable retention features including m...

Страница 20: ...at point NOTE Some Garage Doors may require both lift handles to be installed on bottom section If your bottom section height is 28 or 29 install both lift handles onto the bottom section Install bott...

Страница 21: ...ce settings must be adjusted properly Refer to the owner s manual supplied with your drawbar operator for complete details on installa tion operation maintenance and testing of the operator MAINTAININ...

Страница 22: ...t in serious injury to fingers and or hands if placed in the opening between sections when the door is operated manually The adjacent bottom corner bracket and all cable retention features including m...