background image

Intermediate II 

section (if applicable)

Intermediate I 

section

Bottom 

section

Vertical 

track

Vertical 

track

FOR CENTER HINGE(S):

 Starting with a center hinge, flip the upper hinge leaf up. If needed 

use it as a template, mark and pre-drill (2) 9/32” diameter holes through the section. Attach 

the upper hinge leaf to the section using (2) 1/4” - 20 x 1-7/8” carriage bolts and (2) 1/4” - 

20 flange hex nuts. Repeat same process for the other Center Hinges.

FOR HALF CENTER HINGE(S):

 Flip a upper hinge leaf up and use it as a template. Mark and 

pre-drill (2) 1/8” pilot holes, 1” deep into the section with a 1/8” drill bit.

IMPORTANT: 

BE EXTREMELY CAREFUL NOT TO DRILL THRU THE SECTION. ONLY DRILL 1” 

DEEP.
Attach the center hinge upper leaf to the section using (2) 1/4” - 14 x 1” lag screws. Repeat 

same process for other half center hinge(s).

(2) 1/4” - 14 x 1” 

Lag screws

Typical sections 

shown

Half center 

hinge

Upper 

hinge leaf

Center hinge

(2) 1/4” - 14 x 1” 

Lag screws

Upper hinge leaf

FOR GRADUATED END HINGES:

 Starting with the outer graduated end hinges, flip the up-

per hinge leaf up. If needed use it as a template, mark and pre-drill (2) 9/32” diameter holes 

through the section. Attach the upper hinge leaf to the section using (2) 1/4” - 20 x 1-7/8” 

carriage bolts and (2) 1/4” - 20 flange hex nuts. Repeat same process for the other side.

IF YOU HAVE DOUBLE GRADUATED END HINGES:

 Flip the inner upper hinge leaf up and 

use it as a template. Mark and pre-drill (2) 1/8” pilot holes, 1” deep into the section with a 

1/8” drill bit.

IMPORTANT: 

BE EXTREMELY CAREFUL NOT TO DRILL THRU THE SECTION. ONLY DRILL 1” 

DEEP.
Attach the inner upper hinge leaf to the section using (2) 1/4” - 14 x 1” lag screws. Repeat 

same process for the other side.
Repeat same process for other sections, except top section.

Single graduated 

end hinge with 

short stem track 

roller

Double graduated end hinge 

with long stem track roller

(2) 1/4” - 14 x 1” 

Lag screws

Typical sections 

shown

Upper hinge leaf

Upper hinge 

leaf

(2) 1/4” - 20 x 1-7/8” Carriage bolts 

and (2) 1/4” - 20 Flange hex nuts

Stacking Top Section

 

11

 

Place the top section in the opening. Temporarily secure the top section by driving a nail into 

the header near the center of the door and bending it over the top section. Now, flip up the 

graduated end hinge and center hinge leaves, hold tight against section, and fasten center 

hinges first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is 

critical. For 2” track, position flag angle / wall angle between 1-11/16” (43 mm) to 1-3/4” 

(44 mm) from the edge of the door; tighten the bottom lag screw. For 3” track, position flag 

angle / wall angle between 2-3/16” (56 mm) to 2-1/4” (57 mm) from the edge of the door; 

tighten the bottom lag screw.
Flag angles / wall angles must be parallel to the door sections. Repeat same process for 

other side.

IMPORTANT: 

THE DIMENSION BETWEEN THE FLAG ANGLES MUST BE:

FOR 2” TRACK APPLICATIONS:

 door width plus 3-3/8” (86mm) to 3-1/2” (89 mm) for 

smooth, safe door operation.

FOR 3” TRACK APPLICATIONS:

 door width plus 4-7/8” (124mm) to 5” (127 mm) for 

smooth, safe door operation.
Complete the vertical track installation by securing the jamb bracket(s) or slots in the wall 

angle and tightening the other lag screws. Push the vertical track against the track rollers so 

that the track rollers are touching the deepest part of the curved side of the track; tighten all 

the track bolts and nuts. Repeat for other side.

Top section

Top 

section

Nail

Flag angle or Angle 

mount assembly

Top of flag angle or 

Top of angle mount  

assembly

Door width (

2”

 Track) 

+ 3-3/8” to 3-1/2”

Door width (

3”

 Track) 

+ 4-7/8” to 5”

2”

 Track Applications: 

1-11/16” to 1-3/4”

3”

 Track Applications: 

2-3/16” to 2-1/4”

Vertical track 

against track rollers

Attaching Horizontal Tracks

 

12

 

NOTE:

 Depending on your door, you may have Fully Adjustable Flag Angles, Riveted Vertical 

Track Assemblies or you may have Angle Mount Vertical Track Assemblies. Refer to Package 

Contents / Breakdown of Parts, to determine which Flag Angles / Vertical Track Assemblies 

you have.

WARNING 

DO NOT RAISE DOOR UNTIL HORIZONTAL TRACKS ARE SECURED AT 

REAR, AS OUTLINED IN STEP, REAR BACK HANGS, OR DOOR COULD FALL 

FROM OVERHEAD POSITION CAUSING SEVERE OR FATAL INJURY.

FOR FLAG ANGLES:

 To install horizontal track, place the curved end over the top track roller 

of the top section. Align the bottom of the horizontal track with the top of the vertical track. 

Tighten the horizontal track to the flag angle with (2) 1/4” - 20 x 9/16” track bolts and (2) 

1/4” - 20 flange hex nuts.

12

Содержание 105

Страница 1: ...s 6 Counterbalance Installation Instructions 13 Optional Installation 20 Door Arm Hookup 20 Lift Handles 20 Pull Down Rope 20 Maintenance 21 Cleaning Your Garage Door 21 Painting Your Garage Door 21 M...

Страница 2: ...NERS IF THE ORIGINAL FASTENER WAS RED HEAD THE REPLACEMENT FASTENER MUST BE RED HEAD ALSO CONTACT WAYNE DALTON FOR FASTENER STRENGTH VALUES IF NEEDED WARNING IMPACT GUNS ARE NOT RECOMMENDED WHEN INSTA...

Страница 3: ...inished Door width Jambs Backroom Plumb jambs Finished Door Height Nail Headroom Header board 2 x 6 lumber preferred Suitable mounting surface 2 x 6 lumber minimum Weatherstrips if applicable Jamb 1 8...

Страница 4: ...on side view illustration shows the section profile of all sections and can also be used to identify each section The BOTTOM SECTION can be identified by 1 The INTERMEDIATE I SECTION can be identified...

Страница 5: ...5 Center Bracket As Required J6 Center Bearing As Required J7 Torsion Shaft Torsion Keyed Shaft As Required J8 Torsion Keyed Shafts As Required J9 Keys As Required J10 Center Coupler Assembly As Requi...

Страница 6: ...tom weather seal with the flap pointing towards the outside surface of the bottom section Starting at one end of the door measure inward 1 and attach the bottom weather seal to the bottom of the botto...

Страница 7: ...applications Short stem track roller Spacer 4 1 4 14 x 1 Lag screws Track roller carrier Typical bottom corner bracket STD facing UP Side view of track roller carrier s Inner holes 2 Track Outer holes...

Страница 8: ...LONG STRUT Attach the upper slot of the center hinge to the Intermediate section using 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex nut Secure the lower hole of the center hinge to the Inte...

Страница 9: ...ing 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex nut Secure the lower hole of the graduated end hinge to the Intermediate section using 1 1 4 20 x 1 7 8 carriage bolt and 1 1 4 20 flange hex...

Страница 10: ...op Of Section 110 116 1 Short 310 311 314 316 Top Section Short Strut Strutting Schedule For Door Heights Greater Than Or Equal to 8 1 Door Models Door Width Location On Top Section Up To and In cludi...

Страница 11: ...rack rollers and the door jamb Starting on the left hand side remove the nail holding the bottom section to jamb Position the left hand vertical track assembly angle mount assembly over the track roll...

Страница 12: ...eader near the center of the door and bending it over the top section Now flip up the graduated end hinge and center hinge leaves hold tight against section and fasten center hinges first and end hing...

Страница 13: ...e 1 4 20 Flange hex nuts Horizontal track Track roller Top section Intermediate section Top section Top section If needed lock each of the top fixture slides into place using 1 1 4 20 x 9 16 track bol...

Страница 14: ...een the center of the door and the end bracket on each side to locate the intermediate center brackets Attach each of the center bracket s to the mounting surface using 5 16 RED HEAD lag screws as sho...

Страница 15: ...ring assembly and slide one end of the torsion keyed shaft through the end bearing bracket Lay the other side of the torsion keyed shaft into the center bracket Repeat the same process for the right h...

Страница 16: ...Adjust cable tension as needed until right and left cables both respond the same Once the counterbalance cables are set and if applicable tighten the coupler assembly together by tightening the 3 3 8...

Страница 17: ...rings or parts to which springs are connected such as steel brack ets cables wood blocks fasteners or other parts of the counterbalance system Adjustments or repairs must ONLY be made by a trained doo...

Страница 18: ...ce locking pliers on torsion shaft as shown in Step Attaching Counterbalance Lift Cables Insert a winding rod into the winding cone Push upward on the winding rod slightly while carefully loosening th...

Страница 19: ...t in serious injury to fingers and or hands if placed in the opening between sections when the door is operated manually The adjacent bottom corner bracket and all cable retention features including m...

Страница 20: ...at point NOTE Some Garage Doors may require both lift handles to be installed on bottom section If your bottom section height is 28 or 29 install both lift handles onto the bottom section Install bott...

Страница 21: ...ce settings must be adjusted properly Refer to the owner s manual supplied with your drawbar operator for complete details on installa tion operation maintenance and testing of the operator MAINTAININ...

Страница 22: ...t in serious injury to fingers and or hands if placed in the opening between sections when the door is operated manually The adjacent bottom corner bracket and all cable retention features including m...

Страница 23: ...pplied in accordance with the paint or Sealer manufacturer s instructions and Seller s painting and maintenance instructions Sections must be finished within five 5 days of receipt and prior to instal...

Страница 24: ...rvice representative They will be happy to handle any questions that you may have Thank you for your purchase PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE After installation is complete leave this I...

Отзывы: