![Waygate Technologies Krautkramer USM Go Скачать руководство пользователя страница 204](http://html.mh-extra.com/html/waygate-technologies/krautkramer-usm-go/krautkramer-usm-go_operating-manual_878369204.webp)
5 Operation
Evaluation according to the DGS method
5-128
Rev. 10 (06/2021)
USM Go
Sound attenuation and transfer correction
There are two possibilities for setting the sound attenu-
ation in the test object:
● before the DGS calibration
in the DGS function group
REF CORR
using the func-
tion
REF ATTEN
● at any time (even after the DGS calibration)
in the function group
MAT ATTN
using the function
TEST ATTEN
The transfer corrections can be set as follows:
● before the DGS calibration
in the DGS function group
REF CORR
using the func-
tion
AMPL CORRECT
● at any time (even after the DGS calibration)
in the function group
MAT ATTN
using the function
TRANSFER CORR.
The settings of the functions
AMPL CORRECT
and
TRANSFER CORR.
have an additive effect, likewise
the settings of the functions
REF ATTEN
and
TEST AT-
TEN
.
Using multiple DGS curves
After turning the DGS evaluation on, at least one curve
is displayed for a certain ERS (equivalent reflector size).
For some test specifications according to DGS, certain
tolerance limits in dB below and/or above this curve
must be monitored.
You can set up to four additional curves by adjusting
their offsets from the original curve in dB values. These
curves have no effect on the displayed measurement
reading or on other settings.
Содержание Krautkramer USM Go
Страница 1: ...Krautkrämer USM Go USM Go Operating Manual Id No 49 155 Rev 10 06 2021 ...
Страница 5: ...USM Go Rev 10 06 2021 0 5 Second operating level ...
Страница 6: ...0 6 Rev 10 06 2021 USM Go Second operating level continued ...
Страница 10: ...0 10 Rev 10 06 2021 USM Go ...
Страница 20: ...0 10 Rev 10 06 2021 USM Go ...
Страница 21: ...USM Go Rev 10 06 2021 1 1 Introduction 1 ...
Страница 35: ...USM Go Rev 10 06 2021 2 1 Standard package and accessories 2 ...
Страница 41: ...USM Go Rev 10 06 2021 3 1 Initial start up 3 ...
Страница 53: ...USM Go Rev 10 06 2021 4 1 Principles of operation 4 ...
Страница 76: ...4 Principles of operation Saving the settings 4 24 Rev 10 06 2021 USM Go ...
Страница 77: ...USM Go Rev 10 06 2021 5 1 Operation 5 ...
Страница 210: ...5 Operation Evaluation according to the DGS method 5 134 Rev 10 06 2021 USM Go ...
Страница 211: ...USM Go Rev 10 06 2021 6 1 Documentation 6 ...
Страница 240: ...6 30 Rev 10 06 2021 USM Go ...
Страница 241: ...USM Go Rev 10 06 2021 7 1 Maintenance and care 7 ...
Страница 247: ...USM Go Rev 10 06 2021 8 1 Interfaces and Peripherals 8 ...
Страница 251: ...USM Go Rev 10 06 2021 9 1 Appendix 9 ...
Страница 266: ...9 16 Rev 10 06 2021 USM Go ...
Страница 267: ...USM Go Rev 10 06 2021 10 1 Specifications 10 ...
Страница 278: ...10 12 Rev 10 06 2021 USM Go ...
Страница 279: ...USM Go Rev 10 06 2021 11 1 Index 11 ...