EuroPEK Filter -
Oil Separator
24BI01ae
WAVIN-LABKO LTD
9
frame of the maintenance shaft. From the bolt the grounding is led via a connector
on the connection box to equipotential ground.
15.
Install the frame of the cover and frame assembly on the maintenance shaft. The
frame must not lean against the maintenance shaft, but against the surrounding
compacted layers of sand or a load compensation plate and the asphalt layer laid on
the ground surface.
16.
In an area of heavy and medium weight traffic, a load compensation plate and a
layer of asphalt must be laid to equalize the wheel loads. See figure 3, as well as the
instructions on the body of the separator concerning mounting in the ground.
1. EuroHUK 600 maintenance shaft
2. Frame of the maintenance shaft
3. Gasket
4. Retaining latches (4 pcs)
5. Cast iron cover and frame
6. Load compensation plate. Frostproof concrete: K30-2
Reinforcement: A500 HW T10 # 150
7. Reinforcement: A500 HW T10 # 150
8. Reinforcement ring A500 HW T10 (2 pcs)
Figure 3. Construction of the traffic load compensation plate and the locking of the
maintenance shaft EuroHUK onto the separator.
17.
Finally, fill the separator completely with water to ensure its effective operation.
Filling with water will also diminish the effect of the groundwater buoyancy.