background image

EuroPEK Filter -

 Oil Separator 

24BI01ae 

 

WAVIN-LABKO LTD 

 

of belts. Instructions for belt dimensioning can be found e.g. on the Wavin-Labko web 
pages 

www.wavin- labko.fi

In easy corrosion environments (calcareous or sandy soil, gravel, loamy sand, soil layers 
above ground water surface which pass air well or relatively well), electroplated zinc 
coated ratchets can be used to tighten the belts. 

In highly corrosive environments (clayey soil, humus, peat, slag, mud, sulphides, 
ground water level fluctuation zones as well as coast areas), stainless ratchets are 
recommended. 

Tanks of diameter 1 m are anchored by tying the belts tightly onto the lugs on the slab. 
The nominal capacity of each belt should in this case be at least 2000 kg. Tanks the 
diameter of which exceeds 1 m should always be anchored with belts that are tightened 
by means of ratchets. In this case, also the nominal capacity of the belt should be 
higher: 

-

 

tank diameter 1,4...2,2 m, easy corrosion environments; nominal capacity 4000 kg, 
electroplated zinc coated ratchets and hooks, 

-

 

tank diameter 1,4...2,2 m, highly corrosive environments; nominal capacity 2500 kg, 
stainless ratchets and hooks, 

-

 

tank diameter 3,0 m; nominal capacity 4000 kg, stainless ratchets and hooks. 

The anchoring belts are available as accessories at Wavin-Labko. 

2.3.2 

 

Maintenance shaft 

The maintenance shafts EuroHUK 600 and LM-HUK and the cast iron cover and frame 

5…40 t

 are available as accessories for the oil separator EuroPEK  Filter. The  gaskets 

enable a watertight installation of the maintenance shaft s. The type of the maintenance 
shaft is selected according to the installation depth of the separator, as presented in the 
following table:

 

Type of the maintenance shaft 

9-13 

13-17 

17-21 

21-25 

From inlet sewer to ground surface (mm) 

900-1300 

1300-1700  1700-2100 

2100-2500 

2.3.3 

 

Cast iron cover and frame  

The cast iron covers and frames of the maintenance or sampling shafts are chosen 
according to the traffic load above the separator system (5, 25 or 40 t). 

2.3.4 

 

Data transferring unit Labcom 

The Labcom data transferring unit can be attached to a SET alarm system, e.g. to the 
alarm unit SET/Omega. The data transferring unit Labcom enables the alarm, e.g. 
indicating the  need to empty the oil storage space, to be automatically forwarded to the 
person or company responsible for the task. 

By using a user name and a password, the customers can read the data concerning their 
property on the Internet. The data can also be transferred as an SMS to a GSM phone or 
as an e- mail to a computer. The modem and phone line need not be kept open at the end 
being monitored. 

Содержание EuroPEK Filter

Страница 1: ...i WAVIN LABKO LTD Labkotie 1 FIN 36240 KANGASALA Tel 358 20 1285 270 Fax 358 20 1285 280 E mail tanks wavin labko fi 02 04 24BI01ae EuroPEK Filter Oil Separator Instructions for Installation Operation...

Страница 2: ...STEM COMPONENTS 4 2 3 ACCESSORIES 4 2 3 1 Anchoring belts 4 2 3 2 Maintenance shaft 5 2 3 3 Cast iron cover and frame 5 2 3 4 Data transferring unit Labcom 5 3 INSTRUCTIONS FOR MOUNTING IN THE GROUND...

Страница 3: ...r from ground level to the lower edge of the input sewer is 2 5 metres If installed deeper the separator should be ordered in a reinforced construction In this case please contact Wavin Labko Tanks An...

Страница 4: ...0 42500 H Oil storage capacity l 640 1100 980 1260 1590 1870 2490 3070 3520 I Coalescent 3 D filter pcs 1 2 2 3 3 4 4 4 4 J EuroHUK 600 Maintenance shaft accessory pcs 1 1 1 1 1 1 1 1 1 K LM HUK 600 M...

Страница 5: ...less ratchets and hooks The anchoring belts are available as accessories at Wavin Labko 2 3 2 Maintenance shaft The maintenance shafts EuroHUK 600 and LM HUK and the cast iron cover and frame 5 40 t a...

Страница 6: ...as regards to one another and that the seams between the slabs will not be under the separator The tanks should be anchored in order for the buoyant force of the water in the ground not to move the ta...

Страница 7: ...separator to surface later on when the separator is being emptied Fix the anchoring belts round the separator and to the RST lugs on both sides of the anchoring slab The belts should preferably be ten...

Страница 8: ...ce shaft The probe cable should be pulled into the building through the cable protection tube Leave enough cable inside the maintenance shaft to lift the probe on the ground surface for maintenance op...

Страница 9: ...er of asphalt must be laid to equalize the wheel loads See figure 3 as well as the instructions on the body of the separator concerning mounting in the ground 1 EuroHUK 600 maintenance shaft 2 Frame o...

Страница 10: ...is hazardous waste 4 The alarm probes must always be cleaned when oil waste is drained If necessary wash the probes with mild detergent e g dish washing liquid and set them back in their places Also...

Страница 11: ...tion checked thoroughly at least every five years EN 858 Separator systems for light liquids In this case the following should be checked tightness of the system condition of the body inner surfaces o...

Отзывы: