background image

Page 17

  

 

 

 

  

 

 

 

 

 

 

 

 

 

SERVICE RECORD & WARRANTY INFORMATION

SERVICE RECORD & WARRANTY INFORMATION

Service Record

Date of Purchase:__________ Date of Install:___________ Installed by:__________________

 

  Serial No. _____________________

Date

1st stage

Sediment

(6 months)

2nd stage

Carbon

(6 months)

4th stage

Carbon 

(1 year)

3rd stage

Membrane

(2-5 years)

NOTES:

Содержание WQT4RO11-50

Страница 1: ...ter contact a WATTS representative or consult a professional plumber Test the water periodically to verify that the system is performing satisfactorily Discard small parts remaining after the installa...

Страница 2: ...on block filter This helps ensure that chlorine and other materials that cause bad taste and odor are greatly reduced Stage 3 Membrane recommended change 2 5 years Stage three is the heart of the reve...

Страница 3: ...nnection RO Water 9 Black Tube Connection Inlet 10 Tank Valve Installation Metal Tank 10 Tank Valve Installation Plastic Tank 10 Yellow Tube Connection RO Module to Storage Tank 11 Reverse Osmosis Mod...

Страница 4: ...2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity 5 NTU Hardness Maximum 10 Grains Per Gallon Hardness Recommended hardness not to exceed 10 grain...

Страница 5: ...SOLD SEPARATELY 1 4 DRAIN SADDLE BRINE 11 1 2 3 4 7 7 6 5 12 10 9 Parts Diagram ITEM QTY PART DESCRIPTION 1 1 WQTSC 10 SEDIMENT FILTER 2 1 WQTCBC 10 PRE CARBON FILTER 3 1 WQTM50 10 MEMBRANE FILTER 50...

Страница 6: ...hen drilling Watts accepts no responsibility for damage resulting from the installation of faucet Diamond tip bit recommended Marble Counter top We recommend contacting a qualified contractor for dril...

Страница 7: ...ly Verify contents prior to installation 1 Plastic Adapt a Valve with black collet 1 Brass Adapter no washer 1 Brass Adapter with black washer 1 White rubber washer Make sure that the black collet is...

Страница 8: ...en drill a 3 8 opening in the drain for 3 8 drain saddles OR 1 4 opening in the drain for 1 4 drain saddles Step 9 Peel and stick the foam gasket onto the drain saddle Step 10 Attach the drain saddle...

Страница 9: ...en end of the 3 8 black tube into the 3 8 drain saddle Make sure it is pushed in all the way to the tube stop B 3 8 Tube Fitting Drain Saddle Locate the red 1 4 drain tube attached to the RO faucet Co...

Страница 10: ...tube is pushed in all the way to the tube stop Thread the plastic valve onto the tank fitting Do not over tighten or the valve could crack Step 17 Step 18 Teflon tape must be applied in a clockwise di...

Страница 11: ...cartridge Install the Cartridges Step 25 Insert each cartridge with a 1 4 turn in the clock wise direction The cartridge is installed properly when the label is facing toward the front of the unit Con...

Страница 12: ...es The fourth tank can be used for drinking Open the RO faucet and leave it open until water begins to trickle out this may take a few minutes and the water will come out slowly Step 4 Turn on the inc...

Страница 13: ...water should be tested periodically to verify that the system is performing satisfactorily Normally a membrane would be replaced during a semiannual or annual filter change However if at any time you...

Страница 14: ...the tank is purged check air pressure using an air pressure gauge it should read between 5 7 PSI Digital air pressure gauge is recommended Check Air Pressure in the Tank Important Step 3 Check air pr...

Страница 15: ...t a Valve Check frequently over the next 24 hours to ensure no leaks are present Step 5 Step 4 Note Step 2 Close the RO faucet allowing the storage tank to fill with water It may take 3 to 6 hours to...

Страница 16: ...torage tank of water Set tank air pressure between 5 7 psi See previous page Low Pressure in Tank Use a Digital Air Gauge for best results The empty tank pressure should be 5 7 psi See page 14 4 Noise...

Страница 17: ...Y INFORMATION Service Record Date of Purchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6...

Страница 18: ...n 11 5 The incoming water pressure must be between 40 and 100 pounds per square inch 6 Incoming water to the RO cannot exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to ex...

Отзывы: