Preparation

Tools Required

 -----------------------------------------------------------------------------------------

•  tekmar or jeweler screwdriver
•  Phillips head screwdriver

•  Needle-nose pliers
•  Wire stripper

Materials Required

 -------------------------------------------------------------------------------------

Packaging Contents

 ------------------------------------------------------------------------------------

•  18 AWG LVT solid wire (low-voltage connections)
•  14 AWG solid wire (line-voltage connections)

•  Four 1/8" - 1" wood screws

Installation

•  1 Zone Valve Control 306V
•  2 Spare fuses (located in cover)

•  1 Installation and Operation Manual 306V_D

The installer must ensure that this control and its wiring are 

isolated and/or shielded from strong sources of electromagnetic 

noise. Conversely, this Class B digital apparatus complies 

with Part 15 of the FCC Rules and meets all requirements of 

the Canadian Interference-Causing Equipment Regulations. 

However, if this control does cause harmful interference to 

radio or television reception, which is determined by turning 

the control off and on, the user is encouraged to try to correct 

the interference by re-orientating or relocating the receiving 

antenna, relocating the receiver with respect to this control, 

and/or connecting the control to a different circuit from that 

to which the receiver is connected.
Cet appareil numérique de la classe B respecte toutes les exi-

gences du Règlement sur le matériel brouilleur du Canada.

Radio Frequency Interference

Location

•  Keep the control dry. Avoid potential leakage onto the control.
•  Maintain relative humidity less than 90% in a non-condensing environment.
•  Avoid exposure to extreme temperatures beyond 32-122°F (0-50°C).
•  Install away from equipment, appliances, or other sources of electrical interference.
•  Install to allow easy access for wiring, viewing, and adjusting the display screen.
•  Install approximately 5 feet (1.5 m) off the finished floor.

•  Locate the control near pumps and/or zone valves if possible.

•  Provide a solid backing which the enclosure can be mounted to. Example: plywood or wall studs.

•  Use the conduit knockouts provided on the upper, lower, and back of the enclosure for wiring.

Installing the Enclosure

To prevent the risk of personal injury and/or death, make sure power 

is not applied to the control until it is fully installed and ready for final 

testing. All work must be done with power to the circuit being worked 

on turned off.
Please be aware local codes may require this control to be installed 

or connected by an electrician.

Содержание tekmar 306V

Страница 1: ...p to six thermostats and operates zone valves to provide heating to a zoned hydronic heating system The 306V operates a system pump whenever a zone valve opens Zone 1 can operate either a zone valve or a circulator to provide heat to an indirect domestic hot water tank with optional priority over zones 2 through 6 The 306V includes optional exercising to prevent circulator seizure when not in use ...

Страница 2: ...ided could result in minor or moderate injury This symbol identifies practices actions or failure to act which could result in property damage or damage to the equipment Read manual and all product labels BEFORE using the equipment Do not use unless you know the safe and proper operation of this equipment Keep this manual available for easy access by all users Replacement manuals are available at ...

Страница 3: ...ntrol to a different circuit from that to which the receiver is connected Cet appareil numérique de la classe B respecte toutes les exi gences du Règlement sur le matériel brouilleur du Canada Radio Frequency Interference Location Keep the control dry Avoid potential leakage onto the control Maintain relative humidity less than 90 in a non condensing environment Avoid exposure to extreme temperatu...

Страница 4: ...tN4 T1 T2 T3 T4 T5 T6 A DHW C R W BOILER T STAT 1 T STAT 2 T STAT 3 tN4 A C R W tN4 A C R W T STAT 4 tN4 A C R W T STAT 5 tN4 A C R W T STAT 6 EXPANSION tN4 A C R W tN4 A B C D E FUSE 2 FUSE 1 END SWITCH MOTOR POWER PRIORITY SYSPUMP ROOM RESPONSE ZONE 1 70 80 90 60 50 100 MOD MAX END SWITCH MOTOR ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6...

Страница 5: ...1 70 80 90 60 50 100 MOD MAX END SWITCH MOTOR ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 MASTER MEMBER OFF OFF OFF T STAT1PRIORITY ON EXERCISING ON POSTPURGE ON MODBOILER 0 10V SYSTEMPUMPDURINGPRIORITY ON SYSTEMPUMPWITHMEMBERCALL ON ZONEVALVEENDSWITCHES ON RESERVED 120 VAC POWER PUMP PUMP 1 SYSTEM PRIORITY L N L N L N OFF OFF OFF 4 20mA 1...

Страница 6: ...END SWITCH MOTOR ZONE 6 MASTER MEMBER OFF OFF OFF T STAT1PRIORITY ON EXERCISING ON POSTPURGE ON MODBOILER 0 10V SYSTEMPUMPDURINGPRIORITY ON SYSTEMPUMPWITHMEMBERCALL ON ZONEVALVEENDSWITCHES ON RESERVED 120 VAC POWER PUMP PUMP 1 SYSTEM PRIORITY L N L N L N OFF OFF OFF 4 20mA B1 PS L L N N P1 V1 V2 V3 V4 V5 V6 V7 V8 V9 V10 V11 A1 T1 T6 T7 T8 T9 T10 T11 T2 T3 T4 T5 L N Power L N System Pump L N L N Po...

Страница 7: ...ch if a pump is installed and the Zone Valve End Switches DIP switch is set on Exercising DIP Switch ON Each circulator pump is energized for 30 seconds every 72 hours OFF Circulator pump exercising disabled Post Purge DIP Switch ON After thermostat 1 stops calling for heat the zone 1 priority pump and zone valve remain on for 2 minutes to purge heat from the boiler to the zone OFF Post purge disa...

Страница 8: ...pansion bus from the master to the member controls Terminal Description A tN4 Away signal connecting tekmar thermostats B RoomResponseTM signal from member controls C Power common D Demandsignal 0Vdc demand 2Vdc nodemand E Priority signal 0 Vdc priority 2 Vdc no priority Setting the Max Mod Dial Boiler Make Model Required Adapter Supplied by boiler manufacturer 0 10 V dc 4 20 mA DIP Switch Mod Max...

Страница 9: ...tpoint Source Change Energy Management setting Central Heat Modulation Source to 4 20 mA Change Energy Management setting Central Heat 4 20 mA Setup 4 mA Water Temperature to 80 F 26 5 C 9 10 22 23 5 6 16 17 2 U 1 X X T T 1 2 9 10 No changes to the boiler are required Aerco AM Series Bosch Greenstar Buderus GB142 and GB162 Burnham Alpine Camus Modulating MicoFlame Heat Transfer Products Elite IBC ...

Страница 10: ...ameter to ACTIVE Set BMS Type to SETPOINT Enter boiler password Set Parameter Setpoint source to 4 20mA Enter boiler password Set Parameter Setpoint source to 4 20mA Lochinvar Knight Lochinvar FTXL NTI Trinity LX Riverside HeatStation NTI Trinity Fire Tube 306V 306V 306V 306V 306V Sensor I O 24Vac I O X X W R 1 2 37 38 X X W R 21 22 35 36 X X CH1 R 3 5 11 12 X X CH1 R 3 5 4 5 8 EMS 9 Laars Mascot ...

Страница 11: ...x to 180 F Set Local Priority 2 Volts For Min to 2 V Set Local Priority 2 Volts For Max to 10 V Install the OpenTherm Module as per the boiler manufac turer s instructions Raypak MVB or XTherm Raypak XFyre or XPakFT 306V 306V J2 J1 X X 13 14 17 18 X X T T 8 9 9 10 Viessmann OpenTherm Module Viessmann Extension Module EA1 Plug 0 10V Weil McLain Evergreen P15 306V 306V 306V 1 4 1 2 5 6 Viessmann Vit...

Страница 12: ...bligation Purchaser shall indemnify and hold tekmar harmless from and against any and all claims liabilities and damages of any kind or nature which arise out of or are related to any such representations or war ranties by Purchaser to its customers The pass through Limited Warranty does not apply if the returned Product has been damaged by negligence by persons other than tekmar accident fire Act...

Отзывы: