Lync WQ-UV
SECTION 5: Maintenance
L- OMM-006_0A
•
1/26/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
38
of
38
9. Fully insert a new quartz sleeve into the reactor chamber and install the O-ring over the
quartz sleeve. Press the O-ring down over the quartz sleeve until it is seated in the bevel
of the stainless steel reactor chamber's threaded port.
10. Install the quartz sleeve nut onto the threaded port of the reactor chamber. Screw the nut
on clockwise and tighten hand tight.
11. Insert a new lamp into the quartz sleeve.
12. Gently press down on the glow cap and rotate it clockwise until it locks in place on the
mounting bracket.
13. Reconnect the lamp lead wire to the new lamp.
14. Turn on the inlet valve and check for leaks. Repair leaks as needed.
15. Restore power to the system.
16. Verify new bulb has 365 days remaining on the controller screen.
Immediately after replacing the UV lamp and
/or quartz sleeve, follow the disinfection procedure
below.
6.3.
Disinfection Procedure
If hot water is used during disinfection procedure, please use UV Sensor Port Plug # T7402210
and Flow Sensor Port Plug # T7401003.
DO NOT unplug the system.
1. Shut off the inlet and outlet isolation valves on the cartridge filter line.
2. Depressurize the cartridge filter and unscrew the housing.
3. Install a new filter cartridge and pour 1 cup of 6% bleach into the housing.
4. Reinstall the filter housing and open up the filter isolation valves.
5. Flush 2 reactor chamber volumes of water through the UV system(s) then stop and let the
solution remain in the UV system(s) for 30 minutes.
6. After 30 minutes, flow enough water through the system to flush all of the residual chlorine
from the system. During this time
DO NOT
exceed the rated flow rate of the UV system.