background image

Issue

Possible Cause

Corrective Action

Notes

Main Valve will not 
open

Closed isolation valves in pilot system.

Check isolation valves, ensure 
open. 

Insufficient supply pressure.

Check upstream pressure.

Depending on water 
source, supply pressure 
may not be controlled by 
valve operator.

Main valve stem assembly corroded/
damaged.

Inspect stem assembly, clean/
replace if necessary.

Blockage in pilot system.

Inspect & clean any installed 
pilot system strainers, check 
orifice/speed controls for 
blockages.

Missing fixed orifice assembly.

Verify installation of orifice; 
replace if required/missing. 

Pilot valve inlet isolation 
valve can be used as a 
makeshift orifice assembly 
by partially opening from 
full closed position. 

Improperly configured opening speed 
control (if equipped). 

Adjust opening speed control 
to verify functionality, adjust as 
required.

Standard setting for  
opening speed control is 
11/2 - 21/2 turns open from 
full closed position. Can 
be adjusted in field. 

Main Valve will not 
close

Closed isolation valves in pilot system

Check isolation valves, ensure 
open. 

Diaphragm is damaged

Conduct diaphragm seal test, 
repair and replace if necessary. 

Main valve stem assembly corroded/
damaged.

Inspect stem assembly, clean/
replace if necessary.

Blockage in main valve.

Perform freedom of movement  
test; if valve does not close,  
disassemble and remove  
blockage.

Worn/damaged valve seat. 

Perform seat sealing check; 
disassemble and inspect/repair 
seat if required.

Troubleshooting Guide

 

6          IOM-ACV-115-2_6115-2   2115 

EDP# 1917033 

© 2021 Watts

IOM-ACV-115-2_6115-2   2115 

EDP# 1917033 

© 2021 Watts         7

Содержание LFM115-2

Страница 1: ...etting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the information provided You are required to consult the local building and plumbing codes prior to installation If the information provided here is not consistent with local building or plumbing code...

Страница 2: ...o bring the valve into service in a controlled manner to protect the system from damaging over pressure 1 Prior to installation flush line to remove debris 2 Install valve so the flow arrow matches flow through the line and gauges to monitor valve inlet and outlet pressures A Position Indicator can be installed to provide visual indication of valve position and operation without disassembly 3 Inst...

Страница 3: ... does not include a bleed valve bleed air by loosen ing a fitting on the valve or a plug at the highest point of the valve assembly STEP 3 Pressure the line by opening the upstream isolation valve slowly Air is vented through the air bleed valve or loosened fitting Tighten the fitting when liquid begins to vent See Figure 1 Repeat the process until no air is trapped in the system Globe Angle Size ...

Страница 4: ...into the cover and restricted flow out of the cover of the main valve If recovery of pressure is slow upon increased downstream demand turn the adjustment screw OUT counterclockwise increasing the rate of opening IF recovery of downstream pressure is too quick as indicated in a rapid increase in pressure possibly higher than the desired set point turn the adjustment screw IN clockwise decreasing t...

Страница 5: ...ief Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT counterclockwise to decrease stopping at the desired pressure See Figure 4 Step 4 Allow pressure to stabilize Step 5 Fine tune the relief sustaining setting as required as detailed in Step 3 Step 6 Open the upstream isolation valve to return to normal operation Clockwise to INCREASE inlet pressure Counterc...

Страница 6: ...e specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm or tighten disc diaphragm assembly Test 2 Seat Seal Test 1 Close downstream isolation valve and install pressure gauges on an open inlet and outlet port of main valve 2 Open upstream isolation valv...

Страница 7: ...mbly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for opening speed control is 11 2 21 2 turns open from full closed position Can be adjusted in field Main Valve will not close Closed isolation valves in pilot system Check isolation valves ensure open D...

Страница 8: ... Remove cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require the installation of lifting eye bolts in order to facilitate cover removal installation ports are provided on the cover for this purpose 4 Remove the Disc and Diaphragm Assembly from the valve body...

Страница 9: ... brush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are threaded into the body of the valve and require a seat removal tool Figure 5 Table 1 details the tool dimensions for seat removal Valve seats 8 and larger are held in the valve body with stainless steel c...

Страница 10: ... Nuts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by following the Seat Seal Test procedure in previous section 12 Return valve to service by following instructions on the Technical Bulletin matching the valve function Size in 1...

Страница 11: ...l 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spacer Washer x5 NY300 Fiber 15 Disc Guide ASTM A743 CF8M 316 Stainless Steel 16 Shaft ASTM A276 304 Stainless Steel 17 Seat Ring ASTM A743 CF8M 316 Stainless Steel 17A...

Страница 12: ...ot be responsible for any incidental special or consequential damages including without limitation lost profits or the cost of repairing or replacing other property which is damaged if this product does not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances ov...