Follow the requirements of each test when performed to ensure 

successful installation, operation, and maintenance of the 

backflow preventer.

Test No.1

Purpose:

 To test check valve No. 2 for tightness against 

reverse flow.

Requirements:

 Valve must be tight against reverse flow under 

all pressure differentials. Slowly open the ‘high’ valve A and the 

‘vent’ valve C, and keep the ‘low’ valve B closed. Open test No. 

4. Indicated pressure differential is expected to decrease slightly. 

If pressure differential continues to decrease (until the vent 

opens) check valve No. 2 is reported as ‘leaking.’

Test No. 2

Purpose:

 To test shutoff No. 2 for tightness.

Requirements:

 After passing test No. 1, continue to test No. 2 

by closing test cock No. 2. The indicated pressure differential is 

expected to decrease slightly. If pressure differential continues 

to decrease (approaching ‘zero’), shutoff No. 2 is reported to be 

‘leaking.’

Test No. 3

Purpose:

 To test check valve No. 1 for tightness.

Requirements:

 Valve must be tight against reverse flow under 

all pressure differentials. Close ‘high’ valve A and open test cock 

No. 2. Close test cock No. 4. Disconnect vent hose at test cock 

No. 4. Open valves B and C, bleeding to atmosphere. Then 

closing valve B restores the system to a normal static condition. 

Observe the pressure differential gauge. If there is a decrease in 

the indicated value, check valve No. 1 is reported as ‘leaking.’

Test No. 4

Purpose: 

To test operation of pressure differential relief valve.

Requirements:

 The pressure differential relief valve must 

operate to maintain the ‘zone’ between the two check valves at 

least 2 psi less than the supply pressure. Close ‘vent’ valve C. 

Open ‘high’ valve A. Open the ‘low’ valve B very slowly until the 

differential gauge needle starts to drop. Hold the valve at this 

position and observe the gauge reading when the first discharge 

is noted from the relief valve. Record this as the opening 

differential pressure of the relief valve.

NOTICE

The differential gauge needle MUST drop slowly. Close test 
cocks No. 2 and No. 3. Use the ‘vent’ hose to relieve pressure 
from the test kit by opening valves A, B, and C. Remove all 
test equipment and open shutoff No. 2.

Testing Reduced Pressure Zone Assemblies

Ball Type Test Valves

A

C

B
Needle
Valve

High Hose

(Yellow)

Low Hose

(White or Red)

Vent Hose

(Blue)

 

Test Cock  Test Cock  Test Cock  Test Cock

 

No. 1 

No. 2 

No. 3 

No. 4

Содержание LFC500-FS Series

Страница 1: ...l products must be retested once maintenance has been performed Corrosive water conditions and or unauthorized adjustments or repair could render the product ineffective for the service intended Regul...

Страница 2: ...water authority approves the installation The assembly should be installed with adequate clearance around the valve to allow for inspection testing and servicing A minimum clearance of 12 should be b...

Страница 3: ...ne See Figure C 5 Remove the check 2 module with the same instructions as in step 4 For servicing 6 checks see the maintenance instructions for sizes 8 to 10 6 To clean or inspect either check module...

Страница 4: ...the service hole and thread in the service bolt by hand until it contacts the linkage See Figure A 4 Continue to thread in service bolt with the wrench until the service hole in the linkage is aligne...

Страница 5: ...ewing the relief valve from the housing 5 Remove the cover plate of the relief valve by detaching the four connecting screws 6 Remove the rubber diaphragm from the relief valve Notice how the diaphrag...

Страница 6: ...ock No 2 Close test cock No 4 Disconnect vent hose at test cock No 4 Open valves B and C bleeding to atmosphere Then closing valve B restores the system to a normal static condition Observe the pressu...

Страница 7: ...Check Module O ring First Check Module Relief Valve Second Check Module Troubleshooting PROBLEM CAUSE SOLUTION Relief valve discharges water while system is not flowing Check 1 is fouled Remove and cl...

Страница 8: ...rom the date of original shipment In the event of such defects within the warranty period the Company will at its option replace or recondition the product without charge THE WARRANTY SET FORTH HEREIN...

Отзывы: