3
Battery Pitch & Rough-In Requirements
C/Bowl Outlet
from Floor
Min. C/L Horiz.
Waste from Floor
Max. C/L Horiz.
Waste from Floor
4 1/2"(115)
3"(76)
4 1/2”(115)
5"(127)
3"(76)
5”(127)
5 1/2"(140)
3”(76)
5 1/2”(140)
6"(152)
3”(76)
6”(152)
6 1/2"(165)
3 1/4"(82)
6 1/2”(165)
7"(178)
3 5/8"(92)
7”(178)
7 1/2"(191)
4 1/8"(105)
7 1/2”(191)
8"(203)
4 5/8"(118)
8”(203)
8 1/2"(216)
5"(127)
8 1/2”(216)
9"(229)
5 3/8"(137)
9”(229)
9 3/8"(239)
5 3/4"(146)
9 3/8”(239)
5.) Once the faceplate and fitting heights are set, ensure the four upright bolts and
four fitting bolts are securely tightened.
6.) Secure the rear anchor support rod through the boss on the back of the carrier
fitting with two hex nuts and washers (supplied) and adjust the height. Attach the
anchor foot to a concrete floor using a 1/2" dia. anchor bolt (supplied by others).
Pipe Chase
Rear Anchor
Support
4.) Adjust the carrier fitting to the desired height before tightening the fitting to the
faceplate. Reference Battery Pitch and Rough-in Requirements to determine the
minimum and maximum fitting centerline heights to configure horizontal carrier
batteries.