Benchmark 750-3000 Boiler Installation & Startup Manual
SECTION 2 – INSTALLATION
OMM-0121_D
•
GF-205
•
5/9/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 15 of 122
Figure 2-1a: BMK 750/1000 Clearances
Figure 2-1b: BMK 1500/2000 Clearances
NOTE:
Ensure that
condensate
assembly is
not located
over the
housekeeping
NOTE:
Ensure that
condensate
assembly is
not located
over the
housekeeping
pad.