background image

 

7

 

ES-A-ACV-LF981GD  2115 

© 2021 Watts

LEAD FREE

*

Model 22-1

3-Way Accelerator Control

Size: 

1/2"

The Model 22-1 3-Way Accelerator Pilot is a diaphragm-actuated 

control with three separate ports: Supply, Common and Exhaust. 

It is normally installed in the pilot control circuit of an Automatic 

Control Valve, with the supply port connected to upstream 

pressure, the common port connected to the Main Valve cover 

chamber, and the exhaust port vented either downstream or 

to atmosphere. Its large 

1/2

" ports offer increased capacity, and 

allow smaller ported devices, such as a 3-Way Solenoid, Float or 

Altitude Pilot, to operate the Main Valve open and closed.
When the cover of the Accelerator Pilot is de-pressurized, the 

main valve cover chamber is connected to upstream pressure, 

causing the valve to close drip tight.
When the cover of the Accelerator Pilot is pressurized, the main 

valve cover chamber is vented downstream (dry drain) or to atmo-

sphere (wet drain), causing the valve to open fully.

* The wetted surface of this product contacted by consumable 

water contains less than 0.25% of lead by weight.

Specifications

Size:

 

   

1/2

"

Body Material:

 

      C87800 Silicone Bronze (std) 

 

      CF8M Stainless Steel (opt)

Elastomers:

 

   Buna-N 

(std) 

 

   Viton™ 

(opt) 

 

   EPDM 

(opt)

Inlet Pressure Rating:

    400 psi maximum

Model LF22-1

*Included in Repair Kit

Item

Description

1

Nut

2

Lock Washer

3

Upper Diaphragm

4

Diaphragm*

5

Lower Diaphragm Washer

6

Spring

7

Stem

8

Spool

9

O-Ring*

10

O-Ring*

11

Retainer

12

O-Ring*

13

O-Ring Washer

14

Lock Washer

15

Nut

ACV Standard Components - Series LF981GD

Exhaust

Supply

Common

Accelerator Cover

Accelerator Port

Supply

Exhaust

Supply

Common

2

3

5

6

7

8

9

10

11

4

1

12

13

14

15

Top View 

Bottom View 

Viton™ is a trademark of The Chemours Company FC, LLC

Содержание AMES LF981GD Series

Страница 1: ...ractor in accordance with local codes and ordinances WARNING Need for Periodic Inspection Maintenance This product must be tested periodically in compliance with local codes but at least once per year...

Страница 2: ...eam causing the valve to open at a controlled rate gradually admitting pumping pressure into the distribution system The rate of opening is con trolled by the adjustable opening speed control which re...

Страница 3: ...This Ames Automatic Control Valve ACV is a full port single chamber basic valve that incorporates a one piece disc and dia phragm assembly This assembly is the only moving part within the valve allowi...

Страница 4: ...530 1945 Pressure Drop psi 2 3 4 6 8 10 20 30 40 60 80 100 Flow Rate Gallons per minute Water 2 4 10 20 40 60 80 100 200 500 1000 2000 5000 10000 20000 100000 8 6 4 8 1 0 1 2 1 4 1 6 6 2 1 1 2 3 8 1 0...

Страница 5: ...l 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron...

Страница 6: ...e NPT Port Size NPT Shipping Weights A B C D E F G H I J K L in in mm in mm in mm in mm in mm in mm in mm in mm in mm in mm in in lbs kgs 11 4 71 4 184 51 2 140 3 8 1 4 20 9 11 2 71 4 184 81 2 216 51...

Страница 7: ...re causing the valve to close drip tight When the cover of the Accelerator Pilot is pressurized the main valve cover chamber is vented downstream dry drain or to atmo sphere wet drain causing the valv...

Страница 8: ...the valve opens or closes The adjustable collar is normally set to contact the trip arm when the main valve is closed The collar can be positioned on the stem by loosening the set screw to actuate the...

Страница 9: ...stomers Nitrile standard EPDM optional Viton optional Voltage 24VDC 24VAC or 120VAC Enclosure General Purpose NEMA 4 standard Explosion Proof NEMA 6 6P 7 9 optional Action Normally Open or Normally Cl...

Страница 10: ...lve cover This causes the main valve to close until inlet pressure is again greater than outlet Standard Material Brass Housing and Body Stainless Steel Indicating Rod Optional Material Stainless Stee...

Страница 11: ...on In the free flow direction the seat moves out of the flow path to all unrestricted flow Specifications Standard Flow Control Large Flow Control FLOW FLOW CLOSED Fluid Speed Controlled by Needle FLO...

Страница 12: ...increasing the delivery pressure When a Model LFCP 15 is installed in the piping circuit of an Automatic Control Valve its throttling action causes the Main Valve to throttle open or closed according...

Страница 13: ...ilot circuit speed controls and pilots The filter element can be accessed for cleaning by removing the clean out cap or may be cleaned by installing an optional blow down ball valve The wetted surface...

Страница 14: ...re used in pilot lines to provide a positive shutoff in any override or maintenance situation for simple trouble shooting This 2 piece full port valve features bottom loaded stems PTFE seats and packi...

Страница 15: ...r Size 1 4 3 4 NPT Model LF60 Flo Clean Strainers are used to filter the fluid pass ing through the pilot circuit and provide protection to pilot circuit speed controls and pilots It is installed in t...

Страница 16: ...vel Body Material Stainless Steel Elastomers Buna N standard EPDM optional Viton optional Enclosure NEMA 1 3 4 and 13 General Purpose standard NEMA 1 7 and 9 Explosion Proof optional Electrical Form C...

Страница 17: ...d exactly as removed Consult appropriate hydraulic schematic to ensure proper re assembly 6 Connect solenoid wiring leads to desired switching device using safe standard electrical practices 7 Wire th...

Страница 18: ...De energize the solenoid prior to initial pump start STEP 5 Energize the solenoid at pump start to open the main valve checking that the main valve opens Air is vented through the loosened fitting Ti...

Страница 19: ...olling the valve closing speed If the downstream pressure fluctuates slightly above the desired set point turn the adjustment screw OUT counterclockwise increasing the rate of closing STEP 11 De energ...

Страница 20: ...valve specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace di...

Страница 21: ...ation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary Blo...

Страница 22: ...require a lifting eye bolt to be installed in the valve stem accessory threads located on the very top of the valve stem 5 Before removing Stem Nut examine stem threads for mineral build up Remove dep...

Страница 23: ...to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrity of the Seat Seal by fol...

Страница 24: ...s not work properly other costs resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances ove...

Отзывы: