background image

STEP 1

Pre-set pilots as noted:

Pressure Sustaining 

– Turn Sustaining Control adjustment screw OUT, counterclockwise, backing pressure off the spring, to allow it to 

stay open while adjusting the other controls.

Pressure Reducing

 

– Adjust OUT, counterclockwise, backing pressure off the spring, preventing possible over-pressuring of the system.

Opening and Closing Speed

 - Turn the adjustment screws on the Closing Speed and Opening Speed Controls, if the main valve is so 

equipped, OUT, counterclockwise, 11/2 to 21/2 turns from full closed position.

STEP 2

To ensure proper operation, any trapped air will need to be bled off 
the valve cover during startup. If your ACV includes a bleed valve, 
use a flat head screwdriver to slowly open the valve.
If your valve does not include a bleed valve, bleed air by loosening 
a fitting on the valve or a plug, at the highest point of the valve 
assembly 

(See Figure 1)

.

Step 3

Pressure the line, opening the upstream isolation valve slowly. Air 

is vented through the loosened fitting. Tighten the fitting when 
liquid begins to vent 

(See Figure 1)

.

Counterclockwise to OPEN 

bleed valve

Globe

Angle

Size (in)

1

 

1/4

1

 

1/2

2

21/2

3

4

6

8

10

12

14

16

20

24

A (in)

16

16

20

22

22

24

32

34

38

44

48

52

56

56

B (in)

10

10

12

14

14

16

24

26

28

30

34

40

48

48

Size (in)

1

 

1/4

1

 

1/2

2

2

 

1/2

3

4

6

8

10

12

14

16

C (in)

16

16

20

22

22

24

32

34

38

44

48

52

D (in)

10

10

12

14

14

16

24

26

28

30

34

40

Setting the Pressure Reducing Control

The following tables detail the recommended minimum valve servicing dimensions.

          

B

          

          

FLOW

FLOW

FLOW

          

FLOW

Valve Servicing Dimensions

Figure 1 

Position Indicator

IOM-A-ACV-912-01_612-01   2115 

EDP# 1917032 

© 2021 Watts         3

Содержание Ames 612GD-01

Страница 1: ...2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions...

Страница 2: ...valve inlet and outlet pressures A Position Indicator can be installed to provide visual indication of valve position and operation without disassembly 3 Install isolation valves upstream and downstr...

Страница 3: ...n the valve If your valve does not include a bleed valve bleed air by loosening a fitting on the valve or a plug at the highest point of the valve assembly See Figure 1 Step 3 Pressure the line openin...

Страница 4: ...ry of pressure is slow upon increased downstream demand turn the adjustment screw OUT counterclockwise increasing the rate of opening IF recovery of downstream pressure is too quick as indicated in a...

Страница 5: ...Relief Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT counterclockwise to decrease stopping at the desired pressure See Figure 4 Step 4 Allow pressure to stab...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...ly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for o...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: