STEP 4

Open downstream isolation valve partially to establish flow 

through the valve, observing downstream pressure change. If 

downstream pressure is outside the desired pressure range, turn 

the Reducing Control adjustment screw IN, clockwise, to increase 

or OUT, counterclockwise, to decrease until pressure is near the 

desired setting (See Figure 2).

STEP 5

Gradually open downstream isolation valve until full open.

STEP 6

Fine-tune the Reducing Control adjustment to the pressure 

reducing set point, as detailed in Step 4.

Counterclockwise to INCREASE 

the rate of opening

Clockwise to DECREASE 

rate of opening

Step 7

Opening Speed Flow Control Adjustment: The Opening speed 

flow control allows free flow into the cover and restricted flow 

out of the cover of the main valve. If recovery of pressure is 

slow upon increased downstream demand, turn the adjustment 

screw OUT, counterclockwise, increasing the rate of opening. IF 

recovery of downstream pressure is too quick, as indicated in a 

rapid increase in pressure, possibly higher than the desired set-

point, turn the adjustment screw IN, clockwise, decreasing the 

rate of opening (See Figure 3).

Step 8

(If the main valve comes equipped with a closing speed control, 

otherwise ignore this step)
Closing Speed Needle Valve Adjustment: The closing speed 

needle valve regulates fluid pressure into the main valve cover 

chamber, controlling the valve closing speed. If the downstream 

pressure fluctuates slightly above the desired set point, turn the 

adjustment screw OUT, counterclockwise, increasing the rate of 

closing.

Counterclockwise to DECREASE 

downstream pressure

Clockwise to INCREASE 

downstream pressure

Figure 2 

CP15 — Pressure Reducing Control

Figure 3 

Flow Control

4          IOM-A-ACV-912-01_612-01   2115 

EDP# 1917032 

© 2021 Watts

IOM-A-ACV-912-01_612-01   2115 

EDP# 11917032 

© 2021 Watts         5

Содержание Ames 612GD-01

Страница 1: ...2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions...

Страница 2: ...valve inlet and outlet pressures A Position Indicator can be installed to provide visual indication of valve position and operation without disassembly 3 Install isolation valves upstream and downstr...

Страница 3: ...n the valve If your valve does not include a bleed valve bleed air by loosening a fitting on the valve or a plug at the highest point of the valve assembly See Figure 1 Step 3 Pressure the line openin...

Страница 4: ...ry of pressure is slow upon increased downstream demand turn the adjustment screw OUT counterclockwise increasing the rate of opening IF recovery of downstream pressure is too quick as indicated in a...

Страница 5: ...Relief Sustaining Control screw IN clockwise until the inlet pressure begins to increase or OUT counterclockwise to decrease stopping at the desired pressure See Figure 4 Step 4 Allow pressure to stab...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...ly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for o...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: