Benchmark Platinum-Edge [II]: Operation-Service Manual
SECTION 4
– INITIAL START-UP
OMM-
0137_E • GF-211 • 12/13/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
51
of
153
Reassembly Instructions
6. Replace all previously removed sheet metal enclosures on the unit.
This concludes reassembly of the unit after combustion calibration.