![WattNode WNC-3Y-208-MB Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/wattnode/wnc-3y-208-mb/wnc-3y-208-mb_installation-and-operation-manual_3751197015.webp)
Installation 15
voltage between each phase and ground. If you see a reading between 0 and 5 Vac, that leg is
probably grounded (sometimes called a “grounded delta”).
The WattNode meter will correctly measure services with a grounded leg, but the measured
voltage and power for the grounded phase will be zero and the status LED will not light for
whichever phase is grounded, because the voltage is near zero. Also, one or both of the active
(non-grounded) phases may show yellow or red/yellow LED flashing because the grounded leg
configuration can result in unusual measured power factors for delta services.
For optimum accuracy with a grounded leg, you should also connect the
N
(neutral) terminal
on the meter to the ground terminal; this will not cause any ground current to flow because the
neutral terminal is not used to power the meter. If you have a grounded leg configuration, you can
save money by removing the CT for the grounded phase, since all the power will be measured on
the non-grounded phases. We recommend putting the grounded leg on the
Ø
B
or
Ø
C
inputs and
attaching a note to the meter indicating this configuration for future reference.
Mounting
Protect the WattNode meter from moisture, direct sunlight, high temperatures, and conductive
pollution (salt spray, metal dust, etc.) If moisture or conductive pollution may be present, use an
IP 66 or NEMA 4 rated enclosure to protect the meter. Due to its exposed screw terminals, the
meter must be installed in an electrical service panel, an enclosure, or an electrical room. The
meter may be installed in any orientation, directly to a wall of an electrical panel or junction box.
127 mm (5.0")
143 mm (5.63")
8
5
.6 m
m (
3
.3
7
")
38 mm (1.50") High
Ø
9.8mm (0.386")
Ø
5.1mm (0.200")
Drawn to Scale
Figure 7: WattNode Meter Dimensions
The WattNode meter has two mounting holes spaced 127 mm (5.0 in) apart (center to center).
These mounting holes are normally obscured by the detachable screw terminals. Remove the
screw terminals by pulling outward while rocking from end to end. The meter or
may be
used as a template to mark mounting hole positions, but
do not drill the holes with the meter in
the mounting position
because the drill may damage the connectors and leave drill shavings in
the connectors.
You may mount the meter with the supplied #8 self-tapping sheet metal screws using 1/8” pilot