12
Start-up check list
Note
: See also
"Tube replacement " on page 84
o
Ensure that proper connections are achieved between the pump and suction and discharge piping.
o
Ensure proper connection has been made to a suitable power supply.
o
Ensure that the recommendations in the section
"Good pump installation practice " on page 14
are followed.
20
m-730bpn-en-08
Содержание 700 Series
Страница 13: ...8 3 Pumphead options 730 pump range 720R 720R RX 720RE 720RE REX m 730bpn en 08 13...
Страница 53: ...m 730bpn en 08 53...
Страница 76: ...21 Help 21 1 Help Select Help from the main menu to access the help screens 76 m 730bpn en 08...
Страница 83: ...Refitting 1 2 3 m 730bpn en 08 83...