Master Programming Mode

Master Programming Mode

To enter Master Programming Mode, press and hold both buttons for 5 seconds.

Note:

 All Master Programming functions have been preset at the factory. Unless a change is desired, it is 

           

NOT

 necessary to enter Master Programming Mode.

1. Regeneration Time ( r )

 

     Example 

 [  

r 2A

  ]

 

- The time of day at which regeneration may take place is designated by the letter

 “

r

”.

 

- Default regeneration time setting for 

SOFTENERS is 2a

 

- The first display digit indicates A.M. or P.M. To change the value, press the 

Set/Change

 button.

 

- Press 

Menu/Enter

 button to accept the value and move to the next digit.

 

- The second and third display digits indicate the hour at which the regeneration will occur.

 

- Change the digits with the 

Set/Change

 button and accept with the 

Menu/Enter

 button.

 

- After the entire display flashes, press the 

Menu/Enter

 button to move to the next menu item.

2. 

Regeneration Day Override (A)

 – Meter (Demand) Mode Only 

 

- Press 

Menu/Enter

 button. This display is used to set the maximum amount of time (in days)  

 

                the unit can be in service without regeneration. This setting is identified by the

  

  letter “A” in the left digit. Regeneration will begin at the scheduled time. A setting of zero 

 

  will cancel this feature. 

 

- Example: Override every 7 days

 (

A-07

), 

default setting, or cancel setting

 (

A-00

). 

Maximum is 29.

3. 

Regeneration Cycle Step Times (Steps 1, 2, 3, 4)

    

 

 

 

 

        Example

 [ 

3 - 10

 ]

 

- The next 4 displays set the duration of time in minutes for each regeneration cycle step. The step 

                number which is currently modifiable is indicated on the far left of the display screen.

 

- The number of minutes allotted for the selected backwash step is displayed on the far right.

 

- Change the digit values using the 

Set/Change 

and 

Menu/Enter

 buttons as described above.

  

4. 

System Capacity in Grains 

( c ) 

 

- Press the 

Menu/Enter

 button. This display is used to set the system capacity in grains and is used 

                in conjunction with the hardness setting to calculate total gallons of treated water available 

                between regenerations. This option is identified by the letter “c” in the left digit.  The maximum 

               value for this item is 399. 

 

 

Example: 32,000  

 

 grain capacity ( c 032 ).

5. 

Reserve Capacity Setting 

%     Example 

(

p - 25

)    

6.  

Bluetooth Enabled    

 

BE - 1 

 

(ON)

 

 

 

 

 

BE - 0

 (OFF)

7. 

Bluetooth Password 

  

BBPP

 

is displayed for one second, then password is displayed.

8. To Exit the Master Programming Mode, press the 

Menu/Enter 

button until time of day returns.

Note

: If no buttons are pressed for 60 seconds, the Master Programming Mode will be exited automatical

           ly.

Содержание ISOBAR III

Страница 1: ...High Capacity Softener Manual Installation Operation Manual...

Страница 2: ...Page 19 Bypass Assembly ISO III Page 21 Service Instructions Page 22 Troubleshooting Page 24 Error Codes Page 26 Warranty Information Page 28 FCC Compliance Statement http www chandlersystemsinc com f...

Страница 3: ...ials It is recom mended that Teflon tape be used to seal plastic Noryl threaded fittings Softener Specifications General Specifications General Specifications HD33 3 HD51 3 HD68 3 Grains Capacity Rege...

Страница 4: ...ft water The surfaces of these beads are covered with sodium ions As hard water enters the mineral tank and comes into contact with the resin an exchange of ions takes place as dissolved Calcium and M...

Страница 5: ...tallation Requirements A level floor position ahead of piping into water heater Unit must be installed at least 10 ahead of the inlet to a water heater to prevent damage due to back up of hot water DO...

Страница 6: ...ded All plumbing lines not requiring soft water should be connected upstream of the softener The brine tank drain line is gravity flow and must discharge below the overflow fitting The brine overflow...

Страница 7: ...e pressure 3 Cut main line and install appropriate elbows and extensions Caution Raised arrows located on the sides of control valve body and bypass valve indicate proper direc tion of water flow Inst...

Страница 8: ...gs must be kept at a bare minimum Note Where the drain line is elevated above the control valve or exceeds 20 feet in length 3 4 I D drain line tubing should be used Brine Line and Overflow Connection...

Страница 9: ...leaking from bottom of bypass close and open bypass lever several times to seat o rings Exercise bypass valve 5 After air is evacuated from plumbing lines close bypass position of bypass lever is perp...

Страница 10: ...ain for 3 4 minutes 5 Advance control valve to BRINE TANK REFILL cycle 4 position and allow the control valve to automatical ly fill the brine tank Note Control valve will advance to service position...

Страница 11: ...2 Servicing the water softener 3 A water leak from the water softener is evident 4 Shock treating water well and piping with chlorine or other disinfectant Extra Regeneration If soft water demands ar...

Страница 12: ...the digit value press the Menu Enter button Once A M or P M is accepted the next menu item will flash 4 A To set Hardness an H will appear to enter Compensated Hardness in grains per gallon gpg Defaul...

Страница 13: ...return and finish the cycle where it left off prior to the power interruption When used without battery back up during a power failure the unit stops at its current point in the regeneration position...

Страница 14: ...neration will begin at the scheduled time A setting of zero will cancel this feature Example Override every 7 days A 07 default setting or cancel setting A 00 Maximum is 29 3 Regeneration Cycle Step T...

Страница 15: ...the default password the first time you connect to it the app will ask you to enter the password After entering it the first time you should not need to enter it again unless it changes 3 BTLE Valve d...

Страница 16: ...s in ORANGE with a set button can be changed For Filters Set Backwash Frequency This sets the amount of day between backwash cycles Change Time of Day Press SET to set time automatically based on devi...

Страница 17: ...p Option 2 Touch any graph to enlarge and see details Enlarged graphs are able to be zoomed in by pinching with two fingers Enlarged graph shown below Regenerate Unit at Next Regen Time button This wi...

Страница 18: ...heel 20001X007 1 5 Main Gear 21001X120 1 6 Power Supply 20001X125 1 7 Back Plate 20001X005 1 8 Lower Front Base For Cover 20111X002 1 9 Legacy View Motor Assy 20016X006 1 10 Lower Back Base for Cover...

Страница 19: ...19 Valve Body Assy Softener Version 2 9 1 3 13 14 12 16 17 18 19 10 11 4 5 6 8 15 20 7 6A...

Страница 20: ...4 GPM 20251X268 1 6 DLFC Assy 20017X100 1 7 90 Degree Hose Barb Elbow 20017X266 1 8 Drain Retainer 20017X214 1 9 Brine Valve 20561X225 1 10 DLFC Assembly 20001X228 1 11 DLFC Ferrule 3 8 20251X305 1 12...

Страница 21: ...ll units 20017X284 3 1 Female Straight Slip Set optional 20017X288 4 1 NPT Straight Set optional 20017X289 5 3 4 NPT Straight Set optional 20017X307 6 3 4 Female Straight Slip Set optional 20017X290 7...

Страница 22: ...cover C To Replace Piston Assembly 1 Follow steps A1 A3 2 Disconnect the meter signal wire from the circuit board 3 Remove lower back base screws and detach lower back base 4 Remove screw and washer...

Страница 23: ...move meter from valve body and clean or replace as necessary 5 Reinstall meter nut and cable G To Replace Brine Valve 1 Follow Piston Replacement instructions After the piston is removed pull the brin...

Страница 24: ...all times Clean it yearly Salt may be bridged If using a salt grid plate ensure refill water is over it Resin fouling Call dealer Find out how to con firm it Clean the resin and prevent future foulin...

Страница 25: ...oper control valve program ming Check and reset programming Plugged restrict drain line Clean drain line and or flow control button Injector and or screen is plugged Clean or replace injector and scre...

Страница 26: ...oder connection If the encoder is plugged in and snapped into place skip to step 2 below If encoder is disconnected reconnect it and cycle power to clear the error 2 Disconnect powerhead from valve bo...

Страница 27: ...e following factors The electrical outlet is not powered or is switched off The power cable has come unplugged from the circuit board The power supply has come unplugged from your electrical outlet Th...

Страница 28: ...ty does not cover labor costs shipping charges service charges delivery expenses property damage administrative fees or any costs incurred by the purchaser in removing or reinstalling the water treatm...

Отзывы: