12
A Mono Rail Assembly
i. Mono rail with seat
ii. Rear Leg with bungee
B Tank Assembly
C Sub Rails × 2
D Footboard
Main Parts
Other Parts
E JCB (WRB-B711) × 8
F JCN (WRP-B700) × 8
G Handle Rest (WRP-P430) × 2
H Handle Rest Bolt (WRP-P455) × 2
I
Clamp Bar Bolt (WRP-P1140) × 1
J Rail Sub Bracket Bolt (WRP-S201) × 1
K Back of Footboard Bolt (WRP-B720) × 4
L Rail Sub Bracket (WRP-R1500) × 1
M 5mm Allen Key (WRP-B740) × 2
N Footpads (WRP-P1700) × 2
O Syphon Pump (WRP-B405) × 1
P Purification Tablets (WRP-B960) × 2
**K Bolts are located on the back of footboard [see step 4]
Ai
Aii
G
H
E
F
M
N
O
P
I
J
L
K
We have done our best to keep the assembly instructions as clear and concise as
possible. Assembling your WaterRower takes about 30-45 minutes and the only tool
you need is a 5mm Allen key that is included on the rear spacer or in the assembly
bag. The WaterRower comes partially assembled in two boxes.
PLEASE READ INSTRUCTIONS FULLY BEFORE STARTING ASSEMBLY
COMPONENTS
ASSEMBLY INSTRUCTIONS
**
B
D
C
Содержание Indo-row A1
Страница 1: ...OWNER S MANUAL ASSEMBLY INSTRUCTIONS MONITOR INSTRUCTIONS WARRANTY CONTACT INFO...
Страница 2: ...01...
Страница 11: ...10...
Страница 12: ...11...
Страница 21: ...20...