PUMPING OPERATION
7.
Withdraw inertial pump tubing to the required height above
the base of the borehole. Pass the tube fully through the
appropriate aperture in the tubing clamp (options are for
Standard or High Flow tubing) and pass it through the tube
guide at the top of the pump body (see picture).
8.
When tubing is in position, rotate the wing nut on small
clamping arm clockwise to hold tube and clamp firmly in
place.
9.
The discharge end of the tubing can either be held
manually or taped to the side of the PowerPack.
Extension discharge hose can be supplied by Waterra.
Clamping heavy tubing
High flow tubing is particularly heavy at 25-30m depth. If the tubing starts to slip through the clamp,
check that the appropriate clamp wing nut is tightened. Also check tube and/or clamp are not
damaged.
w
PP1
13
Содержание Waterra PowerPack PP1
Страница 22: ...w PP1 22 NOTES...