background image

 

WL400 

Manual                                                                                                                                    Page 61 – Revision: 7‐16‐2018 

 

 

1.

 

Unpack the 

Waterlogic WL400

 

Water Treatment System

 

and check 

exterior for damage.

 

 

 

2.

 

Remove Front Panel from Base Cabinet opening Top of Panel and 
Removing Slide Bar. 

 

3.

 

Remove 

WL400

 

Water Treatment System

 

from packaging and place on 

top of base cabinet.

 

 

 

4.

 

Attach 

WL400

 

Water Treatment System

 

to base cabinet with Locking 

Bolt provided. 

 

a)

 

Remove screws from locking slides located under Front Cover 
adjacent to faucet. 

 

b)

 

Unlock slides and open Top Cover of 

WL400 Water Treatment 

System

.   

 

c)

 

Pull cover forward and lift from the front to open top cover. 

 

d)

 

Locate wires and run them through. 
 

5.

 

Connect Wires (Quick Connect Clips) on back of unit from Base Cabinet to 

WL400

 

6.

 

Remove Pre‐Carbon and Post‐Carbon Filters and flush 5 gallons of water through each filter 
separately. 

 

7.

 

Reinstall Pre and Post Carbon Filters. 

 

8.

 

Close RO Bypass and Bladder Tank  

 
 
 
 

9.

 

On Back of Cabinet, connect 2 pieces of Tubing to RO 
Drain Line and Water Out Line and run to external drain. 

 

10.

 

Connect the power lead and insert it into the rear of the machine. Turn on 
the Red Power Switch

 I=ON

.  Do NOT turn on the Green Heater / 

Compressor Switch. 

 

CAUTION!  

NEVER TURN ON HEATER BEFORE FILLING HOT TANK. 

Remove Two Screws 

Slide Locks Open 

Содержание WL400 Series

Страница 1: ...ing of the drip tray drain Sanitization of Machine Materials Needed Personal Protective Equipment Rubber or Nitrile Safety Gloves and Protective Eyewear Phillips Screwdriver Temperature Gauge Water Pi...

Страница 2: ...h limit will require manual reset if heater is turned on with an empty hot tank Fill the Cold Circuit with Sanitizer 5 Depress the Main Dispensing Button on the Front Control Panel until cold water sa...

Страница 3: ...e and or pressure or an unusual taste in the water 10 CAUTION NEVER TURN ON HEATER BEFORE FILLING HOT TANK Green Heater Compressor Switch must be in the O OFF position while the hot tank is empty Dama...

Страница 4: ...f cabinet Turn on water supply and flush RO system to drain for 4 hours Water should be draining from both Water Out line and the Drain Line 21 After 4 hours of flushing turn Off Incoming Water Connec...

Страница 5: ...g 29 Press Dispensing Button and check for blue glow from top of Firewall Housing and at Faucet dispensing area to ensure UV lamp is operational 30 Disconnect UV lamp to test UV lamp sensor operation...

Страница 6: ...and require manual reset It will take the heater approximately 10 minutes to heat the water from ambient 75 F 24 C to the factory set point of 185 F 85 C Dispense a cup of hot water to ensure the temp...

Страница 7: ...and equipment drains catch basin etc to scalding hot water Disable Cold and Hot Tanks 1 Turn off the Green Heater Compressor switch to disable the heater and compressor 2 Dispense 1 liter of water th...

Страница 8: ...nk 10 Remove Drain Caps and Plug from Cold Water Tank Drain on the back of the WL400 Water Treatment System 11 Open Bladder Tank 12 After unit has finished draining replace Plug and Drain Caps 13 Reco...

Страница 9: ...16 2018 BASE CABINET ASSEMBLY 1 Insert the four corner supports into the base panel Secure with one screw to the bottom of each upright 2 Place Top Panel on to the corner supports Secure with two scr...

Страница 10: ...0 Manual Page 58 Revision 7 16 2018 3 Fix the back panel into the base panel and secure with four screws 4 Fix the side panels into the base panel and secure with two screws in each through the top pa...

Страница 11: ...n 7 16 2018 5 Place the WL400 Counter Top onto the base cabinet Secure as shown 6 Attach the door strap to the door using the three short screws Align bottom of door into the base panel and attach doo...

Страница 12: ...way from excessive humidity Never expose to freezing temperatures Ensure there is adequate clearance around the unit to allow refrigeration system condenser to dissipate heat Warmer environments requi...

Страница 13: ...System c Pull cover forward and lift from the front to open top cover d Locate wires and run them through 5 Connect Wires Quick Connect Clips on back of unit from Base Cabinet to WL400 6 Remove Pre Ca...

Страница 14: ...Water should be draining from both Water Out Line and Drain Lines 12 After 4 hours turn off Incoming Water Connect Water Out Line from Base Cabinet to drain water in fitting on WL400 Water Treatment...

Отзывы: