
WL250
Operating,
Installation,
and
Service
Manual
Page
47
‐
Revision:
4
‐
25
‐
2016
6.
Press
the
reset
button
7.
Reattach
the
metal
box
by
depressing
the
top
flap
of
the
metal
box
so
it
snaps
back
into
its
original
position
on
the
hot
tank.
8.
Replace
the
Lower
Front
Panel
on
unit
using
Phillips
head
screws.
9.
Plug
in
the
Power
Cord.
10
Make
sure
the
hot
and
cold
tanks
are
filled
with
water
BEFORE
turning
on
the
Red
Heater
and
Compressor
Switch.
Verify
the
cooler
is
fully
operational
before
installing
it
at
the
customers’
site.