21.10.2015
3 / 60
Copyright
2014 by: WATERKOTTE GmbH. Subject to changes.
Content
1
Safety ..................................................................................................................................... 5
1.1
Intended use ...................................................................................................................... 5
1.2
Basic safety precautions .................................................................................................... 5
1.2.1
Keep information available .................................................................................... 5
1.2.2
Before initial use .................................................................................................... 5
1.2.3
Environmental protection ...................................................................................... 6
1.2.4
Modifications and repairs on the heat pump ......................................................... 6
1.3
Hazards ............................................................................................................................. 6
1.4
Operator's duty of care ...................................................................................................... 8
1.5
Other applicable documents .............................................................................................. 8
2
Product description and scope of delivery ................................................................................ 9
2.1
Overview............................................................................................................................ 9
2.1.1
Basic Line Ai1 Air /BS 7010 (outdoor module) .................................................... 10
2.1.2
Basic Line Ai1 Air (indoor module) ....................................................................... 10
2.1.3
Basic Line BS Hyd 5010 hydraulic station ........................................................... 10
3
Components and installation .................................................................................................. 11
3.1
Heating system Basic Line Ai1 Air BS 7010 / BS 7006 .................................................... 11
3.2
Structure and control ....................................................................................................... 11
3.2.1
Electronic heat pump control .............................................................................. 11
4
Transport to installation site ................................................................................................... 12
4.1
Environmental conditions for installation (indoor module) ................................................. 12
4.2
Residual head circulation pump (heating) ......................................................................... 12
5
Installation and connection .................................................................................................... 13
5.1
Installation and connection of indoor unit ......................................................................... 13
5.2
Environmental conditions for installation .......................................................................... 13
5.3
Dimensions and connections outdoor module BS 7010 (5010.5) .................................... 14
5.4
Dimensions and connections outdoor module BS 7006 (5006.5) .................................... 15
5.5
Dimensions and connections (indoor module) Basic Line Ai1 Air ..................................... 16
5.6
Dimensions and connections (indoor module) BS Hyd 5010 hydraulic station ................. 17
5.7
Installation of cover and cladding panels .......................................................................... 18
5.8
Disassembly of cladding panels ....................................................................................... 18
5.9
Disassembly of cover and cladding panels (outdoor module) ........................................... 18
6
Installation and connection of the outdoor module .................................................................. 19
6.1
Selecting a location for outdoor module .......................................................................... 19
6.2
Clearance for ventilation and operation ............................................................................ 20
6.3
Installation in base plate or on the wall ............................................................................. 20
6.4
Installation and space requirement .................................................................................. 21
7
Connection lines ................................................................................................................... 22
7.1
Refrigerant charge and additional charge ........................................................................ 22
7.2
Oil traps ........................................................................................................................... 23
7.3
Insulation ......................................................................................................................... 23
7.3.1
Tube airtight testing method (recommended procedure), test equipment nitrogen24
7.4
Connection outdoor module / indoor module (refrigerant lines) Basic Line Ai1 Air ............ 25
7.5
Connections (refrigerant and heating) indoor module hydraulic station ............................. 26