ENVISION AIR COILS INSTALLATION MANUAL

General Installation Information cont.

Encased Coil Cabinet Configuration

The Envision encased coil cabinet is factory configured for 
upflow and horizontal left hand air discharge installation 
(Figure 1).  For bottomflow or horizontal right hand 
discharge, certain field modifications are required.

WARNING: Do not lift or reposition the ‘A’ coil by 
grasping the copper tube header or distributor. 
This could cause a tubing fracture resulting in a 
refrigerant leak.

Bottomflow Application

To convert the NRA/NHA encased coil cabinets for 
bottomflow applications follow the steps shown below:

Bottom air discharge units require the supply air opening  

1. 
 

to be cut at least a 1/2” larger than the unit’s air outlet.
When installed on combustible flooring, protect the  

2. 
 

edges of the floor opening with sheet metal over wrap or  

 

other non-combustible material.
Bottom air discharge units should be sealed well to the  

3. 
 

floor to prevent air leakage.

Horizontal Right Air Discharge 
Application

To convert the NRA/NHA encased coil cabinets for 
horizontal right air discharge applications follow the steps 
shown below

Remove all access panels. Remove the ‘A’ coil assembly    

1. 
 

and the horizontal drain pan.
From the vertical upflow position, rotate the top of the  

2. 
 

cabinet 90° to the right and set in place.
Remove the support bracket mounted to the top plate of  

3. 
 

the ‘A’ coil.  Rotate the ‘A’ coil support bracket 180° from  

 

its original position and re-attach into existing holes in  

 

the top plate of the coil. This must be done to prevent  

 

the ‘A’ coil from falling into the drain pan (Figure 3).
Move the horizontal drain pan from the left side of the ‘A’  

4. 
 

coil to the right hand side of the ‘A’ coil. Place the ‘A’ coil  

 

and horizontal drain pan assembly into the cabinet  

 

so that the support bracket is resting in the horizontal  

 

drain pan as shown in Figure 3. 
Remove the 2 drain plugs from the upper right of the  

5. 
 

access panel and install them on the lower left of the  

 

access panel. Replace the access panels.
If the unit is suspended, the entire length of the cabinet  

6. 
 

should be supported.

 

IMPORTANT: When removing the coil, there 
is possible danger of equipment damage and 
personal injury. Be careful when removing the coil 
assembly from the unit.

Figure 2 - Bottomflow NRA/NHA

Figure 3 - Horizontal Right Hand Air Discharge

Rotate the coil support bracket to this position

Figure 1 - Factory Configuration

Содержание Envision NHAC026

Страница 1: ...IM1618 09 09 Envision Air Coils Installation Manual Dimensional Data Installation Information Maintenance Geothermal Water Source Heat Pumps R 410A Refrigerant 2 5 Ton ENCASED UNCASED AIR COILS...

Страница 2: ......

Страница 3: ...AIR COILS INSTALLATION MANUAL Table of Contents Model Nomenclature 3 Initial Inspection 3 Safety Considerations 3 Dimensional Data 4 5 General Installation Information 6 9 Hydronic Models 10 11 Maint...

Страница 4: ...nching cloth for brazing operations and have a fire extinguisher available NOTE Local codes and regulations take precedent over any recommendations by the manufacturer In addition to conforming to man...

Страница 5: ...4 1 23 4 16 8 2 1 2 0 cm 52 8 66 0 73 9 2 2 2 2 1 9 48 3 61 2 59 4 42 7 5 3 5 1 Encased Models Refrigerant Water Connections Condensate Connections Miscellaneous J K L M N O P Q R S T U V W X Y Z AA A...

Страница 6: ...ls A B C Suction Liquid Condensate D E F G H I J K L Width Depth Height Sweat Sweat FPT NRAC026 036U in 20 0 24 9 20 7 5 8 3 8 3 4 15 0 17 5 0 7 1 3 10 0 3 0 1 7 7 0 13 3 cm 50 8 63 3 52 6 1 6 1 0 1 9...

Страница 7: ...ace air circulators may have to be replaced with multispeed blowers to upgrade the air delivery CFM when an add on coil is installed Refer to the Encased and Uncased Coil Specification table for recom...

Страница 8: ...lications follow the steps shown below Remove all access panels Remove the A coil assembly 1 and the horizontal drain pan From the vertical upflow position rotate the top of the 2 cabinet 90 to the ri...

Страница 9: ...NRAC036 5 8 OD 3 8 OD 3 4 OD 3 8 OD 3 4 OD 1 2 OD NRAC048 3 4 OD 3 8 OD 7 8 OD 3 8 OD 7 8 OD 1 2 OD NRAC060 7 8 OD 1 2 OD 7 8 OD 1 2 OD 1 1 8 OD 1 2 OD Encased and Uncased Refrigerant Line Sizing NOT...

Страница 10: ...to a drain line pitched away from the unit a minimum of 1 8 per foot to allow the condensate to flow away from the coil A trap must be installed in the drain below the bottom of the pan to ensure fre...

Страница 11: ...must be equipped with an expansion tank to allow room for the heated liquid to expand A system is considered closed when a check valve or backflow prevention valve is installed in the cold water pipe...

Страница 12: ...on the coil Filter Maintenance The air filter installed with the system must be cleaned or replaced to obtain maximum performance They should be inspected monthly under normal operating conditions an...

Страница 13: ...12 ENVISION AIR COILS INSTALLATION MANUAL Notes...

Страница 14: ...13 ENVISION AIR COILS INSTALLATION MANUAL Notes...

Страница 15: ......

Страница 16: ...9 Manufactured by WaterFurnace International Inc 9000 Conservation Way Fort Wayne IN 46809 www waterfurnace com 2009 WaterFurnace International Inc 9000 Conservation Way Fort Wayne IN 46809 9794 Water...

Отзывы: