![Waterford E61 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/waterford/e61/e61_owners-and-installation-manual_3602937013.webp)
Emerald Gas Insert Zero Clearance Kit
13
INSTALLATION
VENTING ARRANGEMENTS -
HORIZONTAL TERMINATIONS
SIMPSON DURA-VENT DIRECT VENT
GS SYSTEM
(Propane & Natural Gas)
Diagram 1 shows allowable combinations of vertical run with
horizontal terminations, using one 90
o
elbow.
ONLY FOR USE WITH THE REDUCTION KIT TO LOWER BTU
RATING KIT# 260-920 (NATURAL GAS AT 27,000 BTU) OR KIT
# 260-922 (PROPANE AT 29,000).
Simpson Dura-Vent
4" inner diameter
6-5/8" outer diameter
A vent guard should be used whenever the termination is
lower than the specified minimum or as per local codes.
•
Maintain a 1-1/4" clearance to combustibles (1-1/2"
with Flex).
•
Firestops are required at each floor level and whenever
passing through a wall.
VENTING ARRANGEMENTS -
VERTICAL TERMINATIONS
SIMPSON DURA-VENT DIRECT VENT GS
SYSTEM
(Propane & Natural Gas)
Diagram 2 shows allowable straight vertical with Simpson
Dura-Vent Direct Vent GS vent systems for Propane and
Natural Gas.
•
Firestops are required at each floor level and whenever
passing through a wall.
•
Maintain a 1-1/4" clearance to combustibles
Diagram 2
Diagram 1
Содержание E61
Страница 16: ...Printed in Canada...