background image

 

 

 
 
 

1x 

 
 
 
Post top 

 

 

 
 
 

1x 

 
 
 
Post Base 

 

 

 

1x 

 
M16x130 
Bolts 

 

Includes

M16 

Hexagon nuts 
and washers 

 

2x 

 
Rail 
Extenders 

 

 

 

6x 

 
M8x12  Key 
bolts 

 

 

 
 

2x 

 
 
M12x180 
Hex bolt 

 

Includes

M12 

Hexagon nuts 
And washers 

 
 

4x 

 
 

 
 
M10x40 hex 
bolts 

 

 
Includes

M10 

Hexagon nuts 
And washers 

 

PLEASE NOTE 

 STAINLESS STEEL BOLTS WILL BIND UP OCCASIONALLY 

APPLY GREASE ONTO BOLT BEFORE TIGHTENING TO STOP THIS OCCURING

 

Содержание MINI ARRAY

Страница 1: ...Array Frame Installation MINI ARRAY...

Страница 2: ...NSTALLATION 6 Footings 6 Set Footing 6 Fastened Footing 7 ARRAY BUILD 8 Tube Cap 8 Beam 9 Angle Adjusters 9 Rails 11 Extending Rails 11 Attaching rails top and bottom 11 SOLAR PANELS 12 Placing the so...

Страница 3: ...port frame for your solar modules with an assembly method that is fast simple and secure Utilising a strong galvanised steel base with a lightweight aluminium support frame we can offer strength and f...

Страница 4: ...ay differ from those pictured PRODUCT NAME PICTURE COMMENTS 4x Aluminium Rail 4x End Clamp Includes M8 Hexagon screw and fixing nut 6x Mid Clamp Includes M8 Hexagon screw and fixing nut 1x Tube Cap 2x...

Страница 5: ...rs 2x Rail Extenders 6x M8x12 Key bolts 2x M12x180 Hex bolt Includes M12 Hexagon nuts And washers 4x M10x40 hex bolts Includes M10 Hexagon nuts And washers PLEASE NOTE STAINLESS STEEL BOLTS WILL BIND...

Страница 6: ...double the width measurements for soft sandy ground and pre pour a thick layer of concrete into the bottom of the hole and place the post base onto this Ensure post is straight and level before conti...

Страница 7: ...on to be bolted to pre set bolts in a concrete floor or block if desired Position post over bolts and tighten down Attach post top to post base with 4 bolts nuts washers provided Continue to Array Bui...

Страница 8: ...e Cap on the Pole and position with the two adjuster mounting holes facing south Tighten the six M8 key bolts to maintain the correct position so panels will face towards true North Tube Cap North Fac...

Страница 9: ...djusters Place the 2 x angle adjustment tubes between the beam and the tube cap on the outside of each Fasten with the M12x140 bolts washers and nuts once you select the angle desired see next page It...

Страница 10: ...10 Adjust the angle of elevation by attaching the Adjustment Tubes to the hole positions required corresponding to the required angle Please refer to the illustration below...

Страница 11: ...rail onto the joiner and tighten Note rail joiner may be longer than the one shown Attaching rails top and bottom Insert 2x rail clamps in the holes at the bottom of the mounting plate place the rail...

Страница 12: ...place the first panel s on the rails with even overlap at both ends and then place the mid clamps in position but do not fully tighten Always place the panels so that the junction box with the cables...

Страница 13: ...sert and tighten End Clamps once everything is square Once fitted with the required number of solar modules be sure to double check tightness of all mechanical fixings Adjust array for optimal angle w...

Страница 14: ...tandards GB50009 2001 GB50011 2001 GB T 13912 92 GBT 14846 2008 GB T 6892 2006 GB50429 2007 GB50017 2003 AS NZS 1170 ASCE SEI 7 05 ASCE SEI 7 010 2007 California Administrative Code IBC 2006 Euro Code...

Страница 15: ...cluding lost profits resulting from any cause whatsoever arising out of or relating to the installation or commissioning of any product sold This warranty does not cover products altered modified or u...

Страница 16: ...ctural and loading ratings and are only to be used and installed as per instruction manuals provided ANY alteration on design or installation voids all warranty Any overloading of array structure and...

Отзывы: