background image

Installation and Service Manual – Under-the-Counter Point of Use 6 Stage Reverse Osmosis System with Pump & UV 

 

Copyright © 2020 WaterAnywhere. 

All Rights Reserved.

 

Page 17 

 

 

Sanitizing 

 
We recommend sanitizing the system at least once a year.  This can be done while changing your filters. Shut 
down the system.   If you have an icemaker hook-up installed, be sure the ball valve in the line to the 
refrigerator is in the closed position during this procedure.   Open the faucet to drain the system, including the 
tank.  Remove the pre-filter cartridges and RO Membrane from the system, leaving the old post-filter cartridge 
in place.   Wash the internal filter housing & membrane housing areas with warm soapy water and rinse well to 
remove the soap.  Pour about ¼ teaspoon of Hydrogen Peroxide or household bleach into each filter housing 
and replace housings on the RO system. Open the feed water valve and open the RO faucet until water flows 
freely from the spout.  Close the faucet and hold the solution in the system for a minimum of 10 minutes. 
 
Drain the tank completely, close the faucet to allow tank to fill again, and then drain again.  Replace filters and 
membrane as indicated in the replacement instructions.  The post filter should be changed after sanitizing the 
system.  Repeat the “Turning the System On for the First Time” procedure (page 13.) 
 

*Note:  It is recommended to chemically disinfect the entire distribution system located after the UV.   To 
ensure water being routed to external equipment is microbiologically safe and does not contaminate the water 
in the system, this equipment and leading plumbing must be disinfected according to manufacturer’s 
instructions. 

 
 

 

Содержание AAA-RO50PUVW

Страница 1: ...om 760 727 1652 sales wateranywhere com Manual for Installation Operation and Maintenance of 6 Stage Point of Use RO UV Drinking Water System with Pump Document ID AAAROPUVW Revision 05 13 20 AAA RO50...

Страница 2: ...he RO membrane the heart of the RO system substantially reduces the total dissolved solids TDS from the water including arsenic barium cadmium chromium hexavalent chromium trivalent copper turbidity f...

Страница 3: ...ifold 5 Prepare Tubing 6 Quick Connect Fittings and Tubing Connections 6 Step 1 Drill a Hole into the Sink for the Faucet 7 Step 2 Faucet Installation 8 Step 3 Drain Saddle Installation 9 Step 4 Syste...

Страница 4: ...e of a water softener for hard water supplies will increase membrane life and efficiency Warnings Only use this system on potable water supplies Do not use this system where the water is microbiologic...

Страница 5: ...ng D Housing with the RO Membrane E Tank Shut Off Valve F Four way Valve G In Line Cartridge with Activated Carbon H Flow Restrictor I Tank Valve J Tank K UV System L Faucet 1 Clean Water Outlet 2 Pol...

Страница 6: ...pplies UV Controller should be mounted to the wall see System Mounting section Determine the location of the cold water feed line to use for the system supply Notice Accidentally hooking up the system...

Страница 7: ...ings and Tubing Connections To ensure a secure seal using quick connect fittings Cut tubing with the end square An angled cut or distortion of the tubing will not provide an efficient seal and may cau...

Страница 8: ...t surface at least 2 in diameter Check the underside of the location for interference The standard faucet that is supplied with the system requires a diameter hole The optional air gap faucet requires...

Страница 9: ...p or sink top and let it rest on the sink top From the underside of the sink slide the washers onto the threaded stem as shown in the diagram 4 5 made of rubber 6 made of metal Secure the assembly by...

Страница 10: ...e Starting with the drill bit drill a hole in the drain pipe Use the drill bit to enlarge the hole Clean the debris from the pipe and the hole before continuing Notice Take extreme caution to not dril...

Страница 11: ...on the sink faucet to drain water and relieve pressure from the lines Assemble the Ball Valve Adapter Kit Use Teflon tape to wrap the threads of the ball valve approximately 3 wraps Screw the ball val...

Страница 12: ...re that all tubing and fittings used for RO product water are poly material and not copper Due to RO product water being very pure it can leach the minerals from copper tubing which will cause a metal...

Страница 13: ...should illuminate without any alarms Wait 5 minutes for UV lamp to reach full power Slowly turn the feed valve counterclockwise until fully open the handle should be in line with the tubing as it ent...

Страница 14: ...L Replace every 12 months Quartz Sleev Model QS 212 Replace as needed during lamp change Part Image 8851 2J03 B423 Booster Pump TACS 114 48 Pump Power Supply PSW240 Shut Off Switch LPS340G Low Pressur...

Страница 15: ...tions All pre and post filters should be replaced every 3 6 months Before starting shut off cold water supply to unit and unplug the UV system Lift the handle on the faucet to drain out the storage ta...

Страница 16: ...V lamp in upward direction from the UV chamber and lamp connector base Hold the UV lamp at the ceramic ends Insert the new UV lamp fully into the UV chamber leaving about two inches of the UV lamp pro...

Страница 17: ...with a cloth soaked in CLR vinegar or some other mild acid and then rinse with water Note If sleeve cannot be completely cleaned or it is scratched or cracked then replace the sleeve Reinstall the qu...

Страница 18: ...oap Pour about teaspoon of Hydrogen Peroxide or household bleach into each filter housing and replace housings on the RO system Open the feed water valve and open the RO faucet until water flows freel...

Страница 19: ...ed in your unit is rated at 77 F and 60psi Water production will decrease approximately 1 5 for each degree that your incoming water is below 77 F It may be necessary to change to a higher flow membra...

Страница 20: ...his system contains a UV Lamp Do not operate the UV Lamp when it is removed from the chamber Unintended use or damage of the system may result in the exposure of dangerous UV radiation UV radiation ma...

Страница 21: ...min If these parameters are not being met please check the following Is the system receiving adequate feed water The pump s inlet chamber must be flooded to prevent performance robbing air ingestion...

Страница 22: ...____________________________________________________________ ____________________________________________________________ ____________________________________________________________ _________________...

Страница 23: ...not be liable for damages or delay caused by defective material Products returned to SELLER for warranty examination must be shipped freight prepaid SELLER S Liability SELLER SHALL NOT BE LIABLE FOR...

Страница 24: ...ent Prefilter Stage 1 2 H F2510AC Carbon Block Pre filters Stages 2 3 1 H F1032 43A Carbon Post Filter Stage 5 with QC adapters RFK 5 PRE Pre Filter Pack Membrane Sold Separately Includes 1 H F1005CF...

Отзывы: