
INSTALLATION INSTRUCTIONS
Read completely before proceeding and
refer to typical installation diagram and photos.
1. Measure pre-charge pressure with a
tire gauge to ensure pressure is the
same as water pressure. Tank comes
charged to 40 psi. Increase pressure
as needed.
4. Open hot waer faucet to relieve
pressure. Close faucet when pressure
subsides (flow stops).
Typical “Completed” Installation
2. Turn water heater to the lowest
temperature setting.
5. Apply Teflon
®
tape to tank threads.
3. Shut off water supply main valve.
6. Screw tank into saddle valve.
IMPORTANT, use wrench flats to
tighten tank into position.
Содержание G-5
Страница 9: ......
Страница 16: ......
Страница 22: ......
Страница 23: ......
Страница 24: ...905 Hickory Lane Mansfield Ohio 44905 Form No 9015 478 04 08...