background image

30119-16      Rev. 4.9/07-09

6

 

 

 

 

   

2. FC101 

(#34)

 and sensor (#15) should be checked to 

be sure they are connected and that the battery is good. 

Turn the propeller by hand at a fairly fast even speed and 

the indicator should display a flow rate.

    3.  METER SADDLE O-RING (#22) 

should be inspected 

for any sign of damage and covered with a thin coat of 

silicone grease.  The meter can now be installed in the 

service line (See step II-F for proper installation).  When 

replacing the meter on the line, make certain that the top 

of the pipeline is smooth and free of any foreign material.  

Make certain that no foreign materials are attached to the 

inside of the service line pipe, as any flow disturbance or 

obstruction may affect the accuracy of the meter.

X.    ORDERING PARTS OR RETURN TO FACTORY

    Inspection of all meter components that may be replaced 

in the field has been accomplished at this point.  Should 

any of the meter parts, upon inspection, appear to be 

damaged or excessively worn, they must be replaced to 

assure proper meter operation and prevent further dam-

age. Cost for replacement parts not covered by warranty 

are available from current parts and price list.  If it is 

determined that the meter should be returned for repair, 

please notify McCrometer prior to shipment.  Each meter 

must be properly packaged to prevent damage to the 

meter in shipment.

Содержание LP04D

Страница 1: ...TS LIST FEATURING CERAMIC BEARING CARTRIDGE STAINLESS STEEL SADDLE U BANDS MODEL FC101 FLOWCOM REGISTER INDICATOR TOTALIZER ONE PIECE SEPARATOR SPINDLE AND THREADED REVERSE THRUST BEARING CARTRIDGE 32...

Страница 2: ...ges of trade or otherwise expressed or implied including but not limited to any implied warranties of fitness for any particular purpose or of merchantability under the uniform commer cial code It is...

Страница 3: ...and Maintenance Manual 1 Tool T 2402X 1 1 II INSTALLATION of McCrometer Low Pressure Electronic Meters varies depending upon the type and model of meter selected for each application The meter must ha...

Страница 4: ...ator assembly 12 and drive magnet 9 1 PROPELLER REMOVAL can be accomplished by first removing the thrust bearing cartridge assembly 5 Loosen the set screw 27 in the side of the nose of the propeller R...

Страница 5: ...ort spindle 12 then turning thrust bearing cartridge 5 counterclockwise 1 8 of a turn Tighten set screw 3 Check the longitudinal end play of the propeller to ensure it s not excessive and does not all...

Страница 6: ...ertain that no foreign materials are attached to the inside of the service line pipe as any flow disturbance or obstruction may affect the accuracy of the meter X ORDERING PARTS OR RETURN TO FACTORY I...

Страница 7: ...30119 16 Rev 4 9 07 09 7 NOTES...

Страница 8: ...K Description Model LP 22D Low Pressure Saddle Assembly Propeller Assembly Items 2 thru 8 Propeller Set Screw Nylon Point Screw Bearing Cartridge Mounting Thrust Bearing Cartridge Assembly Reverse Thr...

Страница 9: ...STRAP ON LOW PRESSURE METERS MODEL LP04D LP12D LP22D MODEL FC101 INDICATOR TOTALIZER ASSEMBLY CERAMIC BEARING CARTRIDGE PROPELLER ONE PIECE SEPARATOR SPINDLE THREADED REVERSE THRUST BEARING CARTRIDGE...

Страница 10: ...Rev 4 9 07 09 WARNING BEFORE REMOVING THE METER SADDLE FROM THE PIPELINE THE WATER MUST BE TURNED OFF AND PRESSURE MUST BE RELIEVEDFROMTHELINE SERIOUSINJURYCANRESULTFROM REMOVING A METER SADDLE UNDER...

Отзывы: