4.8.1 Installation

The rectifier has to be installed at the final destination as following:
Compare dimensional drawings in appendix.
Place the rectifier carefully at the planned location and fix it at the socle.
For maintenance the rectifier needs a distance of at least 80cm in front of the device.
The rectifier is cooled by air inlets in front door of the cabinet. For unhindered air-exchange these areas must be
free.
The rectifier has to be installed in a dry and clean room with a sufficient air-exchange. If this is not guaranteed, the
room has to be adequately air-conditioned.
For the installation dimensions see the diagrams in the appendix.
The rectifier is designed to be installed for wall mounting.

4.8.2  Cabinet 

interconnections

The rectifier should be interconnected per drawing ‘Terminal Board’ in annex.
The suitable diameters of cables and the sizes of the fuses are to be de-signed with regard to the environmental
temperature, the cable grouping and length of cables according to the local rules and according to VDE!

CAUTION:
Works on electrical equipment are to be done only by qualified personnel. The corresponding safety-
rules has to be fulfilled. The marking of wires has to be done in accordance to DIN 40705, 02.80 and
DIN EN 60445, 09.91!

-

Connect rectifier mains supply to X1.

-

The earth connection is made at terminal PE.

-

The battery is internal wired!

-

Connect the floating loads according to requirements to X2. The cable cross-sections for the output cables
should be selected on the basis of the output currents.

-

Connect signalisation lines to X3 according to requirements (refer to circuit- and terminal diagram in
annex).
The following faults and operating conditions are made available for further processing:
-

X3.1-X3.3

: Rectifier 1 fault

-

X3.3-X3.6

: Rectifier 2 fault

-

X3.7-X3.9

: Mains failure

-

X3.10-X3.12  : 

DC-overvoltage

-

X3.13-X3.15  : 

DC-undervoltage

-

X3.16-X3.17  : Insulation failure

-

X3.18-X3.19 

: Output circuit breaker tripped

4.8.3  General 

information

The wire diameters have to be calculated concretely considering the actual environmental conditions! At larger
distances the permissible voltage drop, the surrounding temperature and the cable grouping have to be
dimensioned according to VDE. Local rules for the protection earth-wires have to be considered.

5  Putting into operation

-

Before switching on the rectifiers make sure, that the battery fuses F4 have been removed.

-

Switch on rectifier 1 or rectifier 2 with the rotary-switch S1, the corresponding lamp H1 or H2 will light up.

-

A value of 136,2V must be displayed by the corresponding voltmeter P1 or P3.

-

Insert the battery fuses.

Содержание JOVYREC D600 G120/10

Страница 1: ...150254_10_BA Operating manual W rtsil JOVYREC D600 G120 10...

Страница 2: ...to make changes to these instructions in particular as regards the technical data operating instructions and the weights and dimensions at any time These instructions correspond to the product s techn...

Страница 3: ...2 Liability 8 2 13 Regulations 8 3 Description 8 3 1 General information 8 3 2 Function specification of the rectifier 8 3 3 Specification of the rectifier 9 3 4 Battery undervoltage monitoring 9 3 5...

Страница 4: ...imate 200kg Varnishing RAL 7035 Indicating and operating elements Voltmeter P1 0 150VDC Output voltage rectifier 1 Voltmeter P3 0 150VDC Output voltage rectifier 2 Ampere meter P2 0 15ADC Output curre...

Страница 5: ...e and maintain the units as described in this manual Thoroughly understand unit and system operation and functions Understand all controls indicators and operating limits Before operating the rectifie...

Страница 6: ...ensitive items Synthetic clothing is not to be worn when handling ESD sensitive items Synthetic cloth is not to be used as cleaning rags all cotton cloth is preferred A properly grounded ESD wrist str...

Страница 7: ...ruction on the mode of operation and operating conditions of the rectifier capable of recognising and preventing dangers Regulations and definitions for qualified personnel are contained in DIN 57105...

Страница 8: ...omply with current DIN and VDE regulations VBG4 is met on the basis of compliance with the regulation DIN EN 50274 The CE sign on the device confirms the conformance to the basic EC regulations for 72...

Страница 9: ...3 1 X3 2 open X3 2 X3 3 closed Rectifier 1 fault X3 4 X3 5 open X3 5 X3 6 closed When the facility is functioning properly the contact is according in the opposite state 3 4 Battery undervoltage monit...

Страница 10: ...ncluding equipment unloading placement inspection and interconnection The concerning drawings are located in annex 4 2 Visual control Perform a thorough visual inspection of the rectifier prior to ins...

Страница 11: ...nsport eyelets in the threaded bores on the top of the cabinet for fixed mounting Hook in the four cables Carefully lift the charging rectifier and transport the unit to its intended site Carefully lo...

Страница 12: ...uitable for installation in confined spaces It must be ensured that a 800mm space is provided in front of the device to ensure an escape route and 100mm above the unit to ensure unobstructed air venti...

Страница 13: ...of wires has to be done in accordance to DIN 40705 02 80 and DIN EN 60445 09 91 Connect rectifier mains supply to X1 The earth connection is made at terminal PE The battery is internal wired Connect...

Страница 14: ...Introduction This section provides information for routine preventive maintenance and general fault recognition guidelines for proper operation of the rectifier Physical maintenance or troubleshootin...

Страница 15: ...the monitoring facility should be checked annually 7 Shorted fuses should only be replaced with fuses of the same type current value and triggering characteristics 6 3 Troubleshooting Troubleshooting...

Страница 16: ...and passive safety of the unit We do not accept any liability for any resulting damage Our customer service department will be pleased to send you a complete spare part list for your rectifier upon re...

Страница 17: ...charging Max 10A von of Kunde Client Name Name Gepr ft Checked Ursprung Origin Name Name Datum Date 24 05 2019 a b c 150254_10_ZG Allgemeintoleranzen General tolerances DIN ISO 2768 m Schutzvermerk IS...

Страница 18: ...w jovyatlas com W rtsil JOVYREC D600 G120 10 Input 3 600V 50Hz Output 136 2VDC trickle charging Max 10A von of Kunde Client Name Name Gepr ft Checked Ursprung Origin Name Name Datum Date 24 05 2019 a...

Страница 19: ...9 a b c 150254_10_ZG Allgemeintoleranzen General tolerances DIN ISO 2768 m Schutzvermerk ISO 16016 beachten Refer to protection notice ISO 16016 CABINETS MANUFACTURER TYPE VARNISHING PROTECTION DEGREE...

Страница 20: ..._ZG Allgemeintoleranzen General tolerances DIN ISO 2768 m Schutzvermerk ISO 16016 beachten Refer to protection notice ISO 16016 X1 X1 01 L1 02 L2 03 L3 04 PE X2 X2 01 L 02 L 03 PE 04 L 05 L 06 PE 07 L...

Страница 21: ...MODULE L Interface PE 0 1 2 1 2 3 S1 5 6 7 13A 10A 4 1 6 5 5a 8 04 X1 01 L1 L2 L3 5a 08 06 05 A5 P0000411 DSW 1 6 7 115V N 250V N L K hlbetrieb Heizbetrieb 24V N 48V 60V N 7 6 5 4 3 2 1 B1 SK3110 Ther...

Страница 22: ...ion notice ISO 16016 X2 Output 120V 136 2V trickle charge 10A 01 03 LOAD OUTPUT 1 B10A 04 06 LOAD OUTPUT 2 B10A 07 09 LOAD OUTPUT 3 B10A 14 11 12 24 21 22 14 12 11 A1 A2 L L S1 S2 S3 A9 ABB CM IWN 1 I...

Страница 23: ...per Maximum discharge current 180A 5 sec Designed floating life 20 C 10 12years Absorbent glass mat technology Recognized by UL CE ABS container Dimensions Terminal Constant Current Discharge Characte...

Страница 24: ...0 20 0 25 140 80 100 120 V o ltag e C harg ed V o l um e C harg i ng ti m e ho urs 0 2 4 6 8 10 12 14 16 18 20 C harg e V o l tag e C harg i ng C urrent 1 D i scharg e 100 2 C harg e vo l tag e 2 40V...

Страница 25: ...Operating manual W RTSIL JOVYREC PME BAX 5675_en...

Страница 26: ...ake changes to these instructions in particular as regards the technical data operating instructions and the weights and dimensions at any time These instructions correspond to the product s technical...

Страница 27: ...of operation 6 5 Characteristic curve 6 6 Operation 7 6 1 Circuit diagram of switching power supply 7 6 2 Electrical functional description of switching power 7 6 3 Reliable electrical disconnection 8...

Страница 28: ...rating instructions as well as the associated data sheets is reserved at all times Complaints in relation to supplied goods should be submitted as quickly as possible following receipt of the goods an...

Страница 29: ...Clock frequency 65 kHz Reliable electrical disconnection Up to 60V DC rated output voltage protection from functional low voltage with reliable electrical disconnection as per EN60950 In excess of 60V...

Страница 30: ...irectly 5 Characteristic curve The voltage values below apply for PB cells and the values in brackets for Bi Cd cells The rectifying device operates with the IU characteristic curve as per DIN 41773 U...

Страница 31: ...61000 3 2 Inrush current limiting is also performed based on series resistance with bypass relay Two transistor half bridges for converting the 380V DC to a pulse width regulated step shaped AC voltag...

Страница 32: ...m A4 LP 0012 1 The U I characteristic curves are split into two three sections with reference values as follows the connections between the reference values are linear Type 11 72V with 25A 65V with 38...

Страница 33: ...device is designed such that operation is only disrupted minimally if one of the device s main components fails unexpectedly If there is a fault in a switching power supply PME the affected PME discon...

Отзывы: