background image

AmurAct                                             AMURACT_IOM_RevK_0415

3

LEVER

STEM

CONNECTOR

VALVE 

STEM

LINKAGE

LOCKNUT

REAR SAFETY 

SHIELD

LINK

INPUT 

SHAFT

CRANK

BENCHMARK

LINKAGE

BASE

AmurAct Linkage

 

(front Safety Shield Removed)

Refer to page 2  and below for identification and location of 
components and parts.

Four AmurAct MOTORS are available: the F3 and F5 produce 120 
pound-inches (lb-in) of torque and the F4 and F6 produce 240 pound-
inches (lb-in). The motors are similar in apperance. A MOTOR  is 
selected according to the valve type and size, the differential pressure 
against which the valve must operate, and the power source that is 
available. Consult Product Specifications for additional information 
on motor selection.

Each motor contains an internal 

Enerdrive

® energy source to run 

the motor to a fail-safe valve position if operating power is lost. An 
advanced AutoStroke feature apportions the control signal over the 
actual range of valve movement for increased accuracy; and provides 
“soft stops” at both ends of travel to extend operating life. See page 5 
for location of the Reset/Autostroke pushbutton.

The MOTOR applies rotary motion and rotational force to the INPUT 

SHAFT of the AmurAct LINKAGE by means of the SHAFT CLAMP. The 

CRANK is welded to the INPUT SHAFT and rotates with it.  Clockwise 

CRANK rotation is translated by the LINK and causes the LEVER to 
rotate counterclockwise (upward) about the fixed pivot at its left end 
(as shown below).

STEM CONNECTOR is threaded onto the valve stem and attached to 
the LEVER by two connecting links. Upward movement of the LEVER 

draws the VALVE STEM upward.  The articulated link connection 
reduces side loading on the valve stem packing. Raising the stem of a 
two-way valve opens it.  Raising the stem of a three-way valve opens 
the lower (L) port and shuts the upper (U) port. When the MOTOR 
reverses direction, the lever is drawn downward and the valve stem is 
pushed downward, reversing the control valve action.

When the AmurAct linkage has been calibrated, the BENCHMARK 
indicates the position of the CRANK when the valve plug makes 
contact with the valve seat. Further counterclockwise rotation of the 

CRANK exerts seating force onto the valve plug to produce very tight 
closure. On a two-way valve with ¾” stem travel, motion stops when 
the  CRANK and LINK are aligned with each other, perpendicular 
to the LEVER. This is the lockup position, and is maintained by the 
AmurAct linkage without sustained MOTOR torque.

Factory default settings call for an increasing 2-10 volt or 4-20 mAdc 
signal to open the control valve. Therefore, loss or interruption of the 
control signal will cause the two-way valve to shut, or the lower (L) 
port of a three-way valve to shut. Similarly, loss of operating power 
will activate the Enerdrive fail-safe system to drive the AmurAct 
linkage to the fail-safe position. Upon restoration of operating power, 
AmurAct returns to normal operation after the Enerdrive fail-safe 
energy source is fully recharged, typically 60 seconds or less ... with 
no operator action required.

STEM CONNECTOR

SHOULDER

SCREW

STEM

JAM NUTS

THEORY OF OPERATION

Содержание AmurAct Linkage LS Series

Страница 1: ...3 way valves Otherwise in all other circumstances the Linear Stem Lift factory default will be the desired setting In either case correct control valve sizing is critical to good operation See indivi...

Страница 2: ...e and applies it to the input shaft of the second component the AmurAct linkage The link age converts rotary force and motion to linear force and motion to operate the reciprocating stem of an attache...

Страница 3: ...ECTORisthreadedontothevalvestemandattachedto the LEVER by two connecting links Upward movement of the LEVER draws the VALVE STEM upward The articulated link connection reduces side loading on the valv...

Страница 4: ...or you must first follow steps 1 5 of this procedure and when finished perform the Auto Calibration procedure on page 8 Failure to remove power AND de energize the Enerdrive system first prior to de c...

Страница 5: ...15 mA Slow Blow with T41 terminations Contact the factory at 610 317 0800 before attempting to reconfigure or reposition an AmurAct actuator Improperly rotating the linkage on the valve bonnet adverse...

Страница 6: ...may not shut off tightly The control signal maximum must reach 20 00 mAdc If the control signal maixmum does not reach 20 00 mAdc the actuator may not reach its end of travel in that direction and the...

Страница 7: ...tionship between the control signal and valve stem lift When Switch 5 is in the OFF position a non linear relationship is established between the control signal and valve stem lift This is uniquely ap...

Страница 8: ...ress the RESET pushbutton or vary the control signal These actions may result in the actuator programming being changed If the actuator progamming is changed the actuator may not respond correctly to...

Страница 9: ...sition ______________________________________ 6 If the same motor is to be reinstalled proceed to step 7 If it is to be replaced label field wires for reconnection then discon nect and remove them ___...

Страница 10: ...before applying a control signal Important A small phase error in re clamping the motor without initiating an AUTOSTROKE CALIBRATION CYCLE will cause severe damage to the motor by overrunning the cycl...

Страница 11: ...ct with the top jam nut _______________________________________ 3 Lower the linkage assembly over the valve stem and bonnet then slide the bonnet nut over the connector and loosely thread the nut onto...

Страница 12: ...d linkage and full seating force is now present on the valve plug LEAVE THE CLAMP IN PLACE UNTIL MOTOR INSTALLATION IS COMPLETE ________________________________________ 8 Calibrate and install the mot...

Страница 13: ...bration is complete push the crank firmly against its support column to fully extend the linkage input shaft Install a clamp onto the lower end of the crank and the crank support column Draw the crank...

Страница 14: ...ose off force Remember to press the motor RESET pushbutton after installation and calibration are complete and the motor is energized but before the system is placed into service Verify Dip Switch 5 i...

Страница 15: ...is installed correctly 10 Initate an AUTOSTROKE CALIBRATION CYCLE STOP You must wait for the AUTOSTROKE CALIBRATION CYCLE to finish before going on to the next step 11 Reset the actuator programming...

Страница 16: ...F WARREN CONTROLS INCORPORATED THIS DRAWING IS FOR REFERENCE PURPOSES ONLY POSSESSION OF IT DOES NOT IN ITSELF CONVEY ANY RIGHT OR LICENSE TO MAKE MANUFACTURE USE AND OR SELL THE DEVICE PROCESS METHOD...

Страница 17: ...AmurAct AMURACT_IOM_RevK_0415 17 D3400007...

Страница 18: ...F WARREN CONTROLS INCORPORATED THIS DRAWING IS FOR REFERENCE PURPOSES ONLY POSSESSION OF IT DOES NOT IN ITSELF CONVEY ANY RIGHT OR LICENSE TO MAKE MANUFACTURE USE AND OR SELL THE DEVICE PROCESS METHOD...

Страница 19: ...AmurAct AMURACT_IOM_RevK_0415 19 D3400011...

Страница 20: ...F WARREN CONTROLS INCORPORATED THIS DRAWING IS FOR REFERENCE PURPOSES ONLY POSSESSION OF IT DOES NOT IN ITSELF CONVEY ANY RIGHT OR LICENSE TO MAKE MANUFACTURE USE AND OR SELL THE DEVICE PROCESS METHOD...

Страница 21: ...AmurAct AMURACT_IOM_RevK_0415 21 D3400014...

Страница 22: ...F WARREN CONTROLS INCORPORATED THIS DRAWING IS FOR REFERENCE PURPOSES ONLY POSSESSION OF IT DOES NOT IN ITSELF CONVEY ANY RIGHT OR LICENSE TO MAKE MANUFACTURE USE AND OR SELL THE DEVICE PROCESS METHOD...

Страница 23: ...AmurAct AMURACT_IOM_RevK_0415 23 D3400015...

Страница 24: ...Act Actuator Linkage and Motor AMURACT_ IOM_RevK_0415 92500060 Rev K 2600 EMRICK BLVD BETHLEHEM PA 18020 USA 800 922 0085 WWW WARRENCONTROLS COM DEPENDABLE RUGGED PRECISION CONTROL VALVES AND ACCESSOR...

Отзывы: